You are on page 1of 147

Rev.

0 Remakes : All detail mention in table as per tender drawing documment a=น ้อยกว่า 30 c = น ้อยกว่า 40
5/24/2018 b=น ้อยก่วา 35 d = balance cantiliver
Pier No. Bored Pile Footing Pier Pier Head and Cross Beam Span Type of Viaduct

Dia. 1.0 Dia. 1.2 Dia. 1.5 Dia. 2.2 length Concrete Rebar Total No Type of footing Size WxLxH Excavation Brick Chip Blinding Concrete Rebar Type WxL Height Concrete Rebar Concrete Rebar Wx L Pier-Pier Span Nos.

(ea) (ea) (ea) (ea) (m) (m3/ea) (t/ea) Conc. (m3) Rebar(t) and pier W L H (m) cu.m cu.m cu.m (m3) (t) (m) (m3) (t) (m3) (t)

P628 4 40 45.2 4.5 180.9 18.1 1 B-16-NP-02 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30 7.5 36.2 9.05 4.6 x 3.0 682-627 1 a

P627 4 40 45.2 4.5 180.9 18.1 1 B-16-NP-01 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30 7.5 36.2 9.05 4.6 x 3.0 627-626 1 a
M
o P626 Sta. 4 38 67.1 6.7 268.5 26.8 1 S16-SP-07 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 626-625 1 a
tiJ P625 Sta. 4 38 67.1 6.7 268.5 26.8 1 S16-SP-06 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 625-624 1 a
h
ee P624 Sta. 4 37 65.4 6.5 261.4 26.1 1 S16-SP-05 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 624-623 1 a
l P623 Sta. 4 37 65.4 6.5 261.4 26.1 1 S16-SP-04 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 623-622 1 a
St
a P622 Sta. 4 37 65.4 6.5 261.4 26.1 1 S16-SP-03 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 622-621 1 a
ti P621 Sta. 4 37 65.4 6.5 261.4 26.1 1 S16-SP-02 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 621-620 1 a
o
n P620 Sta. 4 35 61.8 6.2 247.3 24.7 1 S16-SP-01 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 620-619 1 a

P619 4 40 45.2 4.5 180.9 18.1 1 B15-NP-29 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30 7.5 36.2 9.05 4.6 x 3.0 619-618 1 a

P618 4 40 45.2 4.5 180.9 18.1 1 B15-NP-28 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30 7.5 36.2 9.05 4.6 x 3.0 618-617 1 a

P617 4 36 40.7 4.1 162.8 16.3 1 B15-NP-27 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP B 2x2 6.3 25.3 6.3 41.4 10.4 4.6 x 3.0 617-616 1 c

P616 4 37 41.8 4.2 167.3 16.7 1 B15-NP-26 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 616-615 1 c

P615 4 38 43.0 4.3 171.8 17.2 1 B15-NP-25 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP B 2x2 6.2 24.9 6.2 41.4 10.4 4.6 x 3.0 615-614 1 a

P614 4 40 45.2 4.5 180.9 18.1 1 B15-NP-24 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 614-613 1 a

P613 4 40 45.2 4.5 180.9 18.1 1 B15-NP-23 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 613-612 1 a

P612 4 40 45.2 4.5 180.9 18.1 1 B15-NP-22 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 612-611 1 b

P611 B/C 4 40 45.2 4.5 180.9 18.1 1 B15-NP-21 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 611-610 1 d
Bala
nce P610 B/C 4 39 148.2 14.8 592.7 59.3 1 B15-SB-20 9.90 9.90 2.50 9.9 x 9.9 x 2.5 306.0 15.3 10.2 245.0 36.8 SB BC 3x3 8.0 72.0 18.0 610-609 1 d
Canti
P609 B/C 4 37 140.6 14.1 562.3 56.2 1 B15-SB-19 9.90 9.90 2.50 9.9 x 9.9 x 2.5 306.0 15.3 10.2 245.0 36.8 SB BC 3x3 8.0 72.0 18.0 609-608 1 d
liver
P608 4 35 39.6 4.0 158.3 15.8 1 B15-NP-18 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 608-607 1 a

P607 4 35 39.6 4.0 158.3 15.8 1 B15-AP-17 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP L 2x2 8.1 32.2 8.1 36.0 9.0 4.6 x 3.0 607-606 1 a

P606 4 35 39.6 4.0 158.3 15.8 1 B15-AP-16 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP K 2x2 8.1 32.3 8.1 35.6 8.9 4.6 x 3.0 606-605 1 a

P605 4 36 40.7 4.1 162.8 16.3 1 B15-AP-15 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP J 2x2 7.7 30.8 7.7 34.3 8.6 4.6 x 3.0 605-604 1 a

P604 4 37 41.8 4.2 167.3 16.7 1 B15-NP-14 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 604-603 1 a

P603 4 37 41.8 4.2 167.3 16.7 1 B15-NP-13 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 603-602 1 a

P602 4 37 41.8 4.2 167.3 16.7 1 B15-NP-12 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 602-601 1 a

P601 4 37 41.8 4.2 167.3 16.7 1 B15-NP-11 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 601-600 1 a

P600 4 37 41.8 4.2 167.3 16.7 1 B15-NP-10 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 600-599 1 a

P599 4 37 41.8 4.2 167.3 16.7 1 B15-NP-09 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP C 2x2 7.0 28.1 7.0 41.4 10.4 4.6 x 3.0 599-598 1 c

P598 4 37 41.8 4.2 167.3 16.7 1 B15-NP-08 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP C 2x2 6.7 26.9 6.7 41.4 10.4 4.6 x 3.0 598-597 1 a

P597 4 37 41.8 4.2 167.3 16.7 1 B15-NP-07 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 597-596 1 a

P596 B/C 4 37 41.8 4.2 167.3 16.7 1 B15-NP-06 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 596-595 1 d
Bala
nce P595 B/C 4 45 171.0 17.1 683.9 68.4 1 B15-SB-05 9.90 6.00 2.00 9.9 x 9.9 x 2.5 156.6 9.4 6.3 245.0 36.8 SB BC 3x3 8.0 72.0 18.0 595-594 1 d
Canti
P594 B/C 4 45 171.0 17.1 683.9 68.4 1 B15-SB-04 9.90 9.90 2.50 9.9 x 9.9 x 2.5 306.0 15.3 10.2 245.0 36.8 SB BC 3x3 8.0 72.0 18.0 594-593 1 d
liver
P593 4 46 52.0 5.2 208.0 20.8 1 B15-NP-03 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 593-592 1 b

P592 4 46 52.0 5.2 208.0 20.8 1 B15-NP-02 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 592-591 1 b

P591 4 46 52.0 5.2 208.0 20.8 1 B15-NP-01 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 591-590 1 b
Pr
es P590 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-07 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 590-589 1 a
s P589 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-06 7.50 7.50 2.60 7.50 x 7.50 x 2.60 183.8 8.9 5.9 146.3 21.9 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 589-588 1 a
Cl
u P588 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-05 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 588-587 1 a
b P587 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-04 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 587-586 1 a
St
a P586 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-03 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 586-585 1 a
ti P585 Sta. 4 29 51.2 5.1 204.9 20.5 1 S15-SP-02 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 585-584 1 a
o
n P584 Sta. 4 28 49.5 4.9 197.8 19.8 1 S15-SP-01 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 584-583 1 a

P583 4 30 33.9 3.4 135.6 13.6 1 B14-NP-34 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 583-582 1 a

P582 4 30 33.9 3.4 135.6 13.6 1 B14-NP-33 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP C 2x2 6.5 26.1 6.5 41.4 10.4 4.6 x 3.0 582-581 1 c

P581 L 6 38 29.8 3.0 179.0 17.9 1 B14-PP-32 8.00 5.00 2.00 8x5x2 106.6 6.4 4.3 80 12 PP I 1.5 x 2.5 5.4 20.3 5.1
Portal 153.3 38.3 2.6 x 3 x (16.1) 581-580 1 c
P581 R 6 38 29.8 3.0 179.0 17.9 1 B14-PP-32 8.00 5.00 2.00 8x5x2 106.6 6.4 4.3 80 12 PP I 1.5 x 2.5 5.4 20.3 5.1

P580 4 32 36.2 3.6 144.7 14.5 1 B14-AP-31 6.00 6.00 2.50 6 X 6 x 2.50 115.3 5.8 3.8 90 13.5 AP I 2x3 7.1 42.7 10.7 38.8 9.7 4.6 x 3.0 580-579 1 a

P579 4 37 41.8 4.2 167.3 16.7 1 B14-CP-30 6.40 6.40 2.50 6.40 x 6.40 x 2.50 130.7 6.5 4.4 102.4 15.4 CP E 2x3 6.0 36.1 9.0 47.4 11.8 4.6 x 3.0 579-578 1 c

P578 L 4 29 22.8 2.3 91.1 9.1 1 B14-PP-29 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP G 1.5 x 2.5 6.4 23.9 6.0
Portal 128.2 32.0 2.2 x 3 x (13.01) 578-577 1 a
P578 R 4 29 22.8 2.3 91.1 9.1 1 B14-PP-29 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP G 1.5 x 2.5 6.4 23.9 6.0

P577 4 34 38.4 3.8 153.7 15.4 1 B14-NP-28 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 577-576 1 a

P576 4 34 38.4 3.8 153.7 15.4 1 B14-NP-27 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 576-575 1 a

P575 4 30 33.9 3.4 135.6 13.6 1 B14-AP-26 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP P 2x2 7.2 28.7 7.2 34.6 8.6 4.6 x 3.0 575-574 1 a

P574 L 4 30 23.6 2.4 94.2 9.4 1 B14-PP-25 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP F 1.5 x 2.5 6.6 24.7 6.2
Portal 116.5 29.1 2 x 3 x (12.36) 574-573 1 c
P574 R 4 30 23.6 2.4 94.2 9.4 1 B14-PP-25 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP F 1.5 x 2.5 6.6 24.7 6.2

P573 L 4 32 25.1 2.5 100.5 10.0 1 B14-PP-24 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP E 1.5 x 2.5 5.7 21.3 5.3
Portal 107.3 26.8 2.1 x 3 x (11.2) 573-572 1 c
P573 R 4 32 25.1 2.5 100.5 10.0 1 B14-PP-24 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP E 1.5 x 2.5 5.7 21.3 5.3

P572 L 6 38 29.8 3.0 179.0 17.9 1 B14-PP-23 8.00 5.00 2.00 8x5x2 106.6 6.4 4.3 80 12 PP H 1.5 x 2.5 4.4 16.5 4.1
Portal 161.9 40.5 2.6 x 3 x (17.2) 572-571 1 c
Rev.0 Remakes : All detail mention in table as per tender drawing documment a=น ้อยกว่า 30 c = น ้อยกว่า 40
5/24/2018 b=น ้อยก่วา 35 d = balance cantiliver
Pier No. Bored Pile Footing Pier Pier Head and Cross Beam Span Type of Viaduct

Dia. 1.0 Dia. 1.2 Dia. 1.5 Dia. 2.2 length Concrete Rebar Total No Type of footing Size WxLxH Excavation Brick Chip Blinding Concrete Rebar Type WxL Height Concrete Rebar Concrete Rebar Wx L Pier-Pier Span Nos.

(ea) (ea) (ea) (ea) (m) (m3/ea) (t/ea) Conc. (m3) Rebar(t) and pier W L H (m) cu.m cu.m cu.m (m3) (t) (m) (m3) (t) (m3) (t)
Portal 161.9 40.5 2.6 x 3 x (17.2) 572-571 1 c
P572 R 6 38 29.8 3.0 179.0 17.9 1 B14-PP-23 8.00 5.00 2.00 8x5x2 106.6 6.4 4.3 80 12 PP H 1.5 x 2.5 4.4 16.5 4.1

P571 4 34 38.4 3.8 153.7 15.4 1 B14-AP-22 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP H 2x2 6.0 24.1 6.0 41.4 10.4 4.6 x 3.0 571-570 1 a

P570 4 34 38.4 3.8 153.7 15.4 1 B14-NP-21 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 570-569 1 a

P569 4 35 39.6 4.0 158.3 15.8 1 B14-NP-20 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 569-568 1 a

P568 4 35 39.6 4.0 158.3 15.8 1 B14-NP-19 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 568-567 1 a

P567 4 35 39.6 4.0 158.3 15.8 1 B14-NP-18 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 567-566 1 a

P566 4 35 39.6 4.0 158.3 15.8 1 B14-NP-17 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 566-565 1 a

P565 4 35 39.6 4.0 158.3 15.8 1 B14-AP-16 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP G 2x2 6.6 26.4 6.6 40.6 10.1 4.6 x 3.0 565-564 1 c

P564 L 4 34 26.7 2.7 106.8 10.7 1 B14-PP-15 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP D 1.5 x 2.5 5.1 19.1 4.8
Portal 105.7 26.4 2.4 x 3 x (11.21) 564-563 1 c
P564 R 4 34 26.7 2.7 106.8 10.7 1 B14-PP-15 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP D 1.5 x 2.5 5.1 19.1 4.8

P563 4 40 45.2 4.5 180.9 18.1 1 B14-AP-14 6.00 6.00 2.60 6 x 6 x 2.60 119.2 5.8 3.8 93.6 14.04 AP F 2x3 6.2 37.4 9.3 42.5 10.6 4.6 x 3.0 563-562 1 b

P562 4 32 36.2 3.6 144.7 14.5 1 B14-NP-13 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 562-561 1 b

P561 L 4 31 24.3 2.4 97.3 9.7 1 B14-PP-12 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP C 1.5 x 2.5 6.4 24.0 6.0
Portal 108.6 27.1 2.4 x 3 x (10.84) 561-560 1 c
P561 R 4 31 24.3 2.4 97.3 9.7 1 B14-PP-12 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP C 1.5 x 2.5 6.4 24.0 6.0

P560 4 30 33.9 3.4 135.6 13.6 1 B14-AP-11 6.00 6.00 2.20 6 x 6 x 2.20 103.8 5.8 3.8 79.2 11.88 AP E 2 x 2.5 6.5 32.4 8.1 40.9 10.2 4.6 x 3.0 560-559 1 a

P559 4 29 32.8 3.3 131.1 13.1 1 B14-NP-10 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 559-558 1 b

P558 4 29 32.8 3.3 131.1 13.1 1 B14-NP-09 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 558-557 1 a

P557 4 27 30.5 3.1 122.1 12.2 1 B14-NP-08 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 557-556 1 a

P556 4 26 29.4 2.9 117.6 11.8 1 B14-NP-07 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 556-555 1 a

P555 4 26 29.4 2.9 117.6 11.8 1 B14-NP-06 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 555-554 1 a

P554 4 25 28.3 2.8 113.0 11.3 1 B14-NP-05 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 554-553 1 a

P553 4 25 28.3 2.8 113.0 11.3 1 B14-NP-04 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 553-552 1 a

P552 4 25 28.3 2.8 113.0 11.3 1 B14-NP-03 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 552-551 1 a

P551 4 25 28.3 2.8 113.0 11.3 1 B14-NP-02 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 551-550 1 a

P550 4 25 28.3 2.8 113.0 11.3 1 B14-NP-01 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 550-549 1 a

P549 Sta. 4 28 49.5 4.9 197.8 19.8 1 S14-SP-07 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 549-548 1 a
TS P548 Sta. 4 36 63.6 6.4 254.3 25.4 1 S14-SP-06 7.50 7.50 2.60 7.50 x 7.50 x 2.60 183.8 8.9 5.9 146.3 21.9 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 548-547 1 a
C
St P547 Sta. 4 33 58.3 5.8 233.1 23.3 1 S14-SP-05 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 547-546 1 a
a P546 Sta. 4 33 58.3 5.8 233.1 23.3 1 S14-SP-04 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 546-545 1 a
ti
o P545 Sta. 4 33 58.3 5.8 233.1 23.3 1 S14-SP-03 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 545-544 1 a
n P544 Sta. 4 29 51.2 5.1 204.9 20.5 1 S14-SP-02 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 544-543 1 a

P543 Sta. 4 29 51.2 5.1 204.9 20.5 1 S14-SP-01 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 543-542 1 a

P542 4 31 35.0 3.5 140.2 14.0 1 B13-NP-22 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP C 2x2 6.5 26.1 6.5 41.4 10.4 4.6 x 3.0 542-541 1 c

P541 L 4 33 25.9 2.6 103.6 10.4 1 B13-PP-21 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP B 1.5 x 2.5 5.8 21.7 5.4
Portal 119.0 29.7 2 x 3 x (13.7) 541-540 1 c
P541 R 4 33 25.9 2.6 103.6 10.4 1 B13-PP-21 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP B 1.5 x 2.5 5.8 21.7 5.4

P540 L 4 33 25.9 2.6 103.6 10.4 1 B13-PP-20 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP A 1.5 x 2.5 5.8 21.7 5.4
Portal 119.0 29.7 2 x 3 x (13.7) 540-539 1 c
P540 R 4 33 25.9 2.6 103.6 10.4 1 B13-PP-20 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP A 1.5 x 2.5 5.8 21.7 5.4

P539 4 34 38.4 3.8 153.7 15.4 1 B13-AP-19 6.00 6.00 2.20 6 x 6 x 2.20 103.8 5.8 3.8 79.2 11.88 AP D 2x2 6.0 24.0 6.0 36.4 9.1 4.6 x 3.0 539-538 1 c

P538 4 34 38.4 3.8 153.7 15.4 1 B13-NP-18 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP B 2x2 5.2 20.9 5.2 41.4 10.4 4.6 x 3.0 538-537 1 a

P537 4 33 37.3 3.7 149.2 14.9 1 B13-NP-17 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 537-536 1 a

P536 4 34 38.4 3.8 153.7 15.4 1 B13-NP-16 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 536-535 1 a

P535 4 34 38.4 3.8 153.7 15.4 1 B13-NP-15 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 535-534 1 a

P534 4 34 38.4 3.8 153.7 15.4 1 B13-NP-14 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 534-533 1 a

P533 4 34 38.4 3.8 153.7 15.4 1 B13-NP-13 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 533-532 1 a

P532 4 32 36.2 3.6 144.7 14.5 1 B13-NP-12 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 532-531 1 a

P531 4 32 36.2 3.6 144.7 14.5 1 B13-NP-11 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 531-530 1 a

P530 4 32 36.2 3.6 144.7 14.5 1 B13-NP-10 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 530-529 1 a

P529 4 32 36.2 3.6 144.7 14.5 1 B13-NP-09 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 529-528 1 a

P528 4 32 36.2 3.6 144.7 14.5 1 B13-NP-08 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 528-527 1 a

P527 4 32 36.2 3.6 144.7 14.5 1 B13-NP-07 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 527-526 1 a

P526 4 32 36.2 3.6 144.7 14.5 1 B13-NP-06 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 526-525 1 a

P525 4 32 36.2 3.6 144.7 14.5 1 B13-AP-05 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP O 2x2 7.2 28.8 7.2 34.3 8.6 4.6 x 3.0 525-524 1 a

P524 4 32 36.2 3.6 144.7 14.5 1 B13-AP-04 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP N 2x2 7.0 28.1 7.0 36.0 9.0 4.6 x 3.0 524-523 1 a

P523 4 32 36.2 3.6 144.7 14.5 1 B13-AP-03 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP M 2x2 7.1 28.4 7.1 35.4 8.8 4.6 x 3.0 523-522 1 a

P522 4 32 36.2 3.6 144.7 14.5 1 B13-NP-02 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP C 2x2 6.5 26.1 6.5 41.4 10.4 4.6 x 3.0 522-521 1 e

P521 4 32 36.2 3.6 144.7 14.5 1 B13-NP-01 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP B 2x2 4.9 19.7 4.9 41.4 10.4 4.6 x 3.0 521-520 1 b

Sh P520 Sta. 4 32 56.5 5.7 226.1 22.6 1 S13-SP-07 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 520-519 1 a

ah P519 Sta. 4 31 54.8 5.5 219.0 21.9 1 S13-SP-06 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 519-518 1 a
ba
g P518 Sta. 4 34 60.1 6.0 240.2 24.0 1 S13-SP-05 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 518-517 1 a
St P517 Sta. 4 34 60.1 6.0 240.2 24.0 1 S13-SP-04 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 517-516 1 a
a
ti P516 Sta. 4 34 60.1 6.0 240.2 24.0 1 S13-SP-03 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 516-515 1 a
o P515 Sta. 4 29 51.2 5.1 204.9 20.5 1 S13-SP-02 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 515-514 1 a
n
Sh
ah Rev.0 Remakes : All detail mention in table as per tender drawing documment a=น ้อยกว่า 30 c = น ้อยกว่า 40
ba
g 5/24/2018 b=น ้อยก่วา 35 d = balance cantiliver
St Pier No. Bored Pile Footing Pier Pier Head and Cross Beam Span Type of Viaduct
a
Dia. 1.0 Dia. 1.2 Dia. 1.5 Dia. 2.2 length Concrete Rebar Total No Type of footing Size WxLxH Excavation Brick Chip Blinding Concrete Rebar Type WxL Height Concrete Rebar Concrete Rebar Wx L Pier-Pier Span Nos.
ti
o (ea) (ea) (ea) (ea) (m) (m3/ea) (t/ea) Conc. (m3) Rebar(t) and pier W L H (m) cu.m cu.m cu.m (m3) (t) (m) (m3) (t) (m3) (t)
n
P514 Sta. 4 28 49.5 4.9 197.8 19.8 1 S13-SP-01 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 514-513 1 a

P513 4 28 31.7 3.2 126.6 12.7 1 B12-NP-36 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 513-512 1 a

P512 4 28 31.7 3.2 126.6 12.7 1 B12-NP-35 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 512-511 1 a

P511 4 28 31.7 3.2 126.6 12.7 1 B12-NP-34 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 511-510 1 a

P510 4 29 32.8 3.3 131.1 13.1 1 B12-NP-33 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP B 2x2 7.2 28.9 7.2 41.4 10.4 4.6 x 3.0 510-509 1 c

P509 4 29 32.8 3.3 131.1 13.1 1 B12-NP-32 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP C 2x2 7.2 28.9 7.2 41.4 10.4 4.6 x 3.0 509-508 1 a

P508 4 29 32.8 3.3 131.1 13.1 1 B12-NP-31 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 508-507 1 a

P507 4 28 31.7 3.2 126.6 12.7 1 B12-NP-30 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 507-506 1 a

P506 4 28 31.7 3.2 126.6 12.7 1 B12-NP-29 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 506-505 1 a

P505 4 28 31.7 3.2 126.6 12.7 1 B12-NP-28 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 505-504 1 a

P504 4 28 31.7 3.2 126.6 12.7 1 B12-NP-27 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.5 38.1 9.5 36.2 9.05 4.6 x 3.0 504-503 1 a

P503 4 28 31.7 3.2 126.6 12.7 1 B12-NP-26 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.5 38.1 9.5 36.2 9.05 4.6 x 3.0 503-502 1 a

P502 4 29 32.8 3.3 131.1 13.1 1 B12-NP-25 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.5 38.1 9.5 36.2 9.05 4.6 x 3.0 502-501 1 a

P501 4 29 32.8 3.3 131.1 13.1 1 B12-NP-24 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 9.5 38.1 9.5 36.2 9.05 4.6 x 3.0 501-500 1 a

P500 4 29 32.8 3.3 131.1 13.1 1 B12-NP-23 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP C 2x2 9.0 36.1 9.0 41.4 10.4 4.6 x 3.0 500-499 1 c

P499 4 29 32.8 3.3 131.1 13.1 1 B12-NP-22 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP B 2x2 7.4 29.7 7.4 41.4 10.4 4.6 x 3.0 499-498 1 a

P498 4 29 32.8 3.3 131.1 13.1 1 B12-NP-21 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 10.0 40.1 10.0 36.2 9.05 4.6 x 3.0 498-497 1 a

P497 4 27 30.5 3.1 122.1 12.2 1 B12-NP-20 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 10.0 40.1 10.0 36.2 9.05 4.6 x 3.0 497-496 1 a

P496 4 26 29.4 2.9 117.6 11.8 1 B12-NP-19 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 10.0 40.1 10.0 36.2 9.05 4.6 x 3.0 496-495 1 a

P495 4 25 28.3 2.8 113.0 11.3 1 B12-NP-18 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 10.5 42.1 10.5 36.2 9.05 4.6 x 3.0 495-494 1 a

P494 4 24 27.1 2.7 108.5 10.9 1 B12-NP-17 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 10.5 42.1 10.5 36.2 9.05 4.6 x 3.0 494-493 1 a

P493 4 27 30.5 3.1 122.1 12.2 1 B12-NP-16 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP C 2x2 9.5 38.1 9.5 41.4 10.4 4.6 x 3.0 493-492 1 c

P492 4 26 29.4 2.9 117.6 11.8 1 B12-NP-15 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP B 2x2 8.7 34.9 8.7 41.4 10.4 4.6 x 3.0 492-491 1 a

P491 4 27 30.5 3.1 122.1 12.2 1 B12-AP-14 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP C 2x2 10.7 42.7 10.7 34.6 8.6 4.6 x 3.0 491-490 1 a

P490 4 29 32.8 3.3 131.1 13.1 1 B12-AP-13 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP B 2x2 11.1 44.2 11.1 35.8 9.0 4.6 x 3.0 490-489 1 a

P489 4 39 44.1 4.4 176.3 17.6 1 B12-CP-12 6.00 6.00 2.50 6 x 6 x 2.50 115.3 5.8 3.8 90 13.5 CP D 2x3 10.3 61.9 15.5 42.8 10.7 4.7 x 3 489-488 1 a

P488 4 42 47.5 4.7 189.9 19.0 1 B12-CP-11 6.00 6.00 2.50 6 x 6 x 2.50 115.3 5.8 3.8 90 13.5 CP C 2x3 10.7 64.3 16.1 48.3 12.1 5.3 x 3 488-487 1 a

P487 4 42 47.5 4.7 189.9 19.0 1 B12-CP-10 6.00 6.00 2.50 6 x 6 x 2.50 115.3 5.8 3.8 90 13.5 CP B 2x3 11.2 67.3 16.8 48.3 12.1 5.3 x 3 487-486 1 a

P486 4 40 45.2 4.5 180.9 18.1 1 B12-CP-09 6.00 6.00 2.50 6 x 6 x 2.50 115.3 5.8 3.8 90 13.5 CP A 2x3 11.3 67.6 16.9 45.6 11.4 5x3 486-485 1 a

P485 4 36 40.7 4.1 162.8 16.3 1 B12-AP-08 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP A 2x2 12.6 50.5 12.6 35.1 8.8 4.6 x 3.0 485-484 1 a

P484 4 36 40.7 4.1 162.8 16.3 1 B12-NP-07 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 12.5 50.1 12.5 36.2 9.05 4.6 x 3.0 484-483 1 b

P483 4 38 43.0 4.3 171.8 17.2 1 B12-NP-06 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP C 2x2 11.5 46.1 11.5 41.4 10.4 4.6 x 3.0 483-482 1 c

P482 4 36 40.7 4.1 162.8 16.3 1 B12-NP-05 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP B 2x2 9.9 39.7 9.9 41.4 10.4 4.6 x 3.0 482-481 1 b

P481 4 27 30.5 3.1 122.1 12.2 1 B12-NP-04 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 12.0 48.1 12.0 36.2 9.05 4.6 x 3.0 481-480 1 a

P480 4 28 31.7 3.2 126.6 12.7 1 B12-NP-03 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP A 2x2 12.5 50.1 12.5 36.2 9.05 4.6 x 3.0 480-479 1 d
Bala
nce P479 6 30 114.0 11.4 683.9 68.4 1 B12-SB-02 9.90 15.40 3.00 9.9 x 15.4 x 3 551.5 23.6 15.8 457.4 68.6 SB BC 3x3 8.0 72.0 18.0 479-478 1 d
Canti
P478 6 30 114.0 11.4 683.9 68.4 1 B12-SB-01 9.90 15.40 3.00 9.9 x 15.4 x 3 551.5 23.6 15.8 457.4 68.6 SB BC 3x3 8.0 72.0 18.0 478-477 1 d
liver
P477

P477 scope under ?

Total 80 432 112 28 29,050 2,905 160 14,796 2,219 5,620 1,405 6,335 1,584 151

Summary Detail a = 111 span


1 Pile 652 nos. (excluding screw pile) Total Concrete 55,800 m3 (excluding precast segment , station CC and PF , cast in-stu span) b = 10 span
2 Number of Footing and Pier 160 nos. Total Rebar 8,113 ton c = 20 span (in-stu 40 m) 151 span
3 Detail of Pier Type span number d = 9 span (3 balance )
Assymmetry Pier (AP) 16 ea. e = 1 span ( in-stu 45 m)
Catilever Pier (CP) 5 ea.
Normal Pier (NP) 87 ea.
e = น ้อยกว่า 45
antiliver
Span Length Bored Pile
(m) Dia. 1.0

1-3

30

30

30

30

30

30

30

30

30

30

30

40

40

30

30

30

35

45

70

45

28

30

25

25

30

30

30

30

30

40

30

30

45

70

45

32

32

32

30

30

30

30

30

30

20

23

40

40

30

40

30

30

30

30

40

40

40
e = น ้อยกว่า 45
antiliver
Span Length Bored Pile
(m) Dia. 1.0

1-3
40

30

30

30

30

30

30

40

40

35

35

40

30

32

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

28.25

40

40

40

40

30

30

30

30

30

30

30

30

30

30

30

30

30

27

30

30

45

32

30

30

30

30

30

30
e = น ้อยกว่า 45
antiliver
Span Length Bored Pile
(m) Dia. 1.0

1-3
22.88

23

30

30

40

25

30

30

30

30

30

30

30

25

40

30

30

30

30

30

30

40

25

30

30

30

30

30

30

26.16

35

40

35

28.6

45

70

45

4,921.9 -

180.5 m3 *111 span 20,147 m3


200 m3 * 10 span 2,000 m3
250 m3 * 20 span 5,000 m3
1000 m3 * 3 span 3,000 m3
300 m3 * 1 span 300 m3
30,447 m3
Cutting & Bending machine 15
Generator- 200 kva 5
Tower Crane 1
Generator- 250 kva 11
Ecxcavator PC200 7
Mobile Crane 25 ton 7
Truck Crane 5 ton , 10 wheel 5
Dump Truck 10 Wheel 16
Air Compressor - 175 CFM 9
Ecxcavator PC200 Wheel type 2
Mobile Crane 50 ton 5
Generator 350 KVA 6
Backhoe Virbo 1
JCB 3
Conrete Boom Pump ( 36 m ) 2
Hydrolic Breaker for PC 200 2
Motor Grader 1
Soil compactor 1
backup Generator 500 KVA (office and Camp ) 3

plant concrete M2.5 2

transit mixer 24

generator 400 Kva 2

generator 350 kva 2


Manpower Commencement Date expected start on 1 July 2018
2018
Unit
7 8 9 10 11
Item. Description Q'ty
Jul Aug Sep Oct Nov
E-M
1 2 3 4 5
Working Group A

Motijheel Sta.
Working Group B

Working Group C

Press club Sta.

Working Group D

TSC Sta.

Shahbag Sta.

Working Group E
1 Working Group A
1.1 Chief front en. 41 month 1 1 1 1 1
1.2 Civil en 63 month 1 1 1 1 1
1.3 Technician Structure 70 month 1 1 1 1 1
1.4 Headman and Labours Structure 1130 month 10 10 10 10 10
1.5 Technician Formworks 59 month 1
1.6 Headman and Labours Formworks 429 month 7
1.7 General Housekeeping 210 month
1.8 Site Store , Site documment and other 239 month 5
1.9 Unit rate Sub-contractor (local) 20

2 Working Group B
2.1 Chief front en. 42 month 1 1 1 1 1
2.2 Civil en 71 month 1 1 1 1 1
2.3 Technician Structure 71 month 1 1 1 1 1
2.4 Headman and Labours Structure 1135 month 10 10 10 10 10
2.5 Technician Formworks 64 month 1
2.6 Headman and Labours Formworks 443 month 7
2.7 General Housekeeping 265 month
2.8 Site Store , Site documment and other 246 month 5
2.9 Unit rate Sub-contractor (local) 20

3 Working Group C
3.1 Chief front en. 34 month 1 1 1
3.2 Civil en 58 month 1 1 1 1 1
3.3 Technician Structure 58 month 1 1 1 1 1
3.4 Headman and Labours Structure 865 month 5
3.5 Technician Formworks 54 month 1
3.6 Headman and Labours Formworks 408 month 7
3.7 General Housekeeping 265 month
3.8 Site Store , Site documment and other 212 month 5
3.9 Unit rate Sub-contractor (local) month 20

4 Working Group D
4.1 Chief front en. 40 month 1 1 1
4.2 Civil en 71 month 1 1 1 1 1
4.3 Technician Structure 71 month 1 1 1 1 1
4.4 Headman and Labours Structure 1090 month 5
4.5 Technician Formworks 64 month 1
4.6 Headman and Labours Formworks 443 month 7
4.7 General Housekeeping 265 month
4.8 Site Store , Site documment and other 246 month 5
4.9 Unit rate Sub-contractor (local) 20

5 Working Group E
5.1 Chief front en. 40 month 1 1 1
5.2 Civil en 71 month 1 1 1 1 1
5.3 Technician Structure 71 month 1 1 1 1 1
5.4 Headman and Labours Structure 1090 month 5
5.5 Technician Formworks 64 month 1
5.6 Headman and Labours Formworks 443 month 7
5.7 General Housekeeping 265 month
5.8 Site Store , Site documment and other 246 month 5
5.9 Unit rate Sub-contractor (local) 20

Extra Balance Cantiliver 3 Location


Chief front en. 23 month 1 1 1 1
En 42 month 1 1 2
Technician 104 month 2 2
Labours 410 month
Sub-contractor ( local )

6 Motijheel Sta.
6.1 Chief front 34 month 1 1 1
6.2 Civil en 30 month 1 1 1
6.3 Architect 28 month
6.4 Technician 88 month 1 1 1
6.5 Headman and Labours 795 month 5 5 5
6.6 General Housekeeping 245 month
6.7 Site Store , Site documment and other 166 month
6.8 Unit rate Sub-contractor (local)
6.9 E&M

7 Press club Sta.


7.1 Chief front 31 month
7.2 Civil en 26 month
7.3 Architect 28 month
7.4 Technician 85 month
7.5 Headman and Labours 780 month
7.6 General Housekeeping 245 month
7.7 Site Store , Site documment and other 166 month
7.8 Unit rate Sub-contractor ( local)
7.9 E&M

8 TSC Sta.
8.1 Chief front 34 month 1 1 1
8.2 Civil en 30 month 1 1 1
8.3 Architect 28 month
8.4 Technician 88 month 1 1 1
8.5 Headman and Labours 795 month 5 5 5
8.6 General Housekeeping 245 month
8.7 Site Store , Site documment and other 166 month
8.8 Unit rate Sub-contractor (local)
8.9 E&M

9 Shahbag Sta.
9.1 Chief front 31 month
9.2 Civil en 26 month
9.3 Architect 28 month
9.4 Technician 85 month
9.5 Headman and Labours 780 month
9.6 General Housekeeping 245 month
9.7 Site Store , Site documment and other 166 month
9.8 Unit rate Sub-contractor ( local)
9.9 E&M

Summary 1 - 5 ( Sub-Structure )
Chief front en. 197 month 2 2 5 5 5
Civil en 334 month 5 5 5 5 5
Technician Structure 341 month 5 5 5 5 5
Headman and Labours Structure 5,310 month 20 20 20 20 35
Technician Formworks 305 month 0 0 0 0 5
Headman and Labours Formworks 2,166 month 0 0 0 0 35
General Housekeeping 1,270 month 0 0 0 0 0
Site Store , Site documment and other 1,189 month 0 0 0 0 25
Unit rate Sub-contractor (local) 0 0 0 0 100

Summary 6 - 9 ( Station )
Chief front 130 month 0 0 2 2 2
Civil en 112 month 0 0 2 2 2
Architect 112 month 0 0 0 0 0
Technician 346 month 0 0 2 2 2
Headman and Labours 3,150 month 0 0 10 10 10
General Housekeeping 980 month 0 0 0 0 0
Site Store , Site documment and other 664 month 0 0 0 0 0
Unit rate Sub-contractor ( local) month 0 0 0 0 0
E&M - month 0 0 0 0 0

10 Pool Department for site service


10.1 Survey Chief + en ( 1 + 2 ) 111 month 1 1 1 2 2
10.2 Technician + autocad 270 month 2 2 2 2 4
10.3 instrument + labours 905 month 5 5 5 5 10
10.4 Chief en. ( electrical + mechanical ) 39 month 1 1 1
10.5 EN ( electrical + mechanical ) 74 month 1 2
10.6 Technician + Helper (1+2) 935 month 5 10
10.7 chief en. Technical 42 month 1 1 1 1 1
10.8 tenhnical engineer 72 month 1 1 1 1 2
10.9 Autocad 96 month 1 1 3
10.10 Main store 303 month 3 3 5 5
10.11 Cook + helper (1+2) 426 month 3 3 6 6 6
10.12 House keeping 541 month 3 3 3 5 8
10.13 Chief safety 42 month 1 1 1 1 1
10.14 Safety officer 269 month 1 1 1 2 3
10.15 QA 113 month 1 1 1 2 3
10.16 Camp Boss 75 month 1 1 2 2

11 Main office
11.1 Account 246 month 2 4 6 6 6
11.2 Admin 192 month 1 3 3 5 5
11.3 Payroll 119 month 1 3 3 3 3
11.4 Cost 84 month 2 2 2 2 2
11.5 Procurement 156 month 2 2 2 4 4
11.6 Commercial / QS (4+1) 198 month 3 3 3 5 5
11.7 IT 79 month 1 1 2 2 2
11.8 office boy 192 month 2 2 2 5 5
ected start on 1 July 2018
2019
12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
sub - structure works
station works
sub-structure works
sub-structure works

sub-structure works
station works

sub-structure works

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10 10 20 40 40 40 40 40 40 40 40 40 40 40 40 40
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 15 15 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
30 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10 10 20 40 40 40 40 40 40 40 40 40 40 40 40 40
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 15 15 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
30 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10 10 20 40 40 40 40 40 40 40 40 40 40 40 40 40
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 15 15 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
30 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10 10 20 40 40 40 40 40 40 40 40 40 40 40 40 40
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 15 15 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
30 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10 10 20 40 40 40 40 40 40 40 40 40 40 40 40 40
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 15 15 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
30 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40

Balance cantiliver works


1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 4 6 6 6 6 6 6 6 6 6 6 6 6 6
15 15 25 25 25 25 25 25 25 25 25 25 25 25 25
50 50 50 50 50 50 50 50 50 50 50 50 50

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
1 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3
10 20 20 30 30 30 30 30 30 30 30 30 30 30 30 30
5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
1 3 6 6 6 6 6 6 6 6 6 6 6 6 6 6
5 10 20 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 2 2 3 3 3 3 3 3 3 3
10 20 20 30 30 30 30 30 30 30 30
5 5 10 10 10 10 10 10 10 10
1 3 6 6 6 6 6 6 6 6 6
5 10 20 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
1 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3
10 20 20 30 30 30 30 30 30 30 30 30 30 30 30 30
5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
1 3 6 6 6 6 6 6 6 6 6 6 6 6 6 6
5 10 20 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 2 2 3 3 3 3 3 3 3 3
10 20 20 30 30 30 30 30 30 30 30
5 5 10 10 10 10 10 10 10 10
1 3 6 6 6 6 6 6 6 6 6
5 10 20 40 40 40 40 40 40 40

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
5 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
5 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
50 50 100 200 200 200 200 200 200 200 200 200 200 200 200 200
5 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
35 35 75 75 75 75 75 75 75 75 75 75 75 75 75 75
25 25 25 50 50 50 50 50 50 50 50 50 50 50 50 50
25 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
150 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

2 2 2 2 2 4 4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 4
0 0 0 2 2 2 2 2 4 4 4 4 4 4 4 4
2 4 4 6 6 8 10 10 12 12 12 12 12 12 12 12
20 40 40 60 60 80 100 100 120 120 120 120 120 120 120 120
0 10 10 20 20 20 30 30 40 40 40 40 40 40 40 40
2 6 12 12 12 14 18 24 24 24 24 24 24 24 24 24
0 10 20 40 80 80 90 100 120 160 160 160 160 160 160 160
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
6 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
15 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
25 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
6 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
8 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 6 8 8 8 8 8 8 8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
2020 2021
4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
misc. works
n works
misc. works
misc. works
station works
misc. works
n works
station works
misc. works

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1
40 40 40 40 40 40 40 40 40 20 20 20 20 20 20 10
2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1
15 15 15 15 15 15 15 15 15 7 7 7 7 7 7 7
10 10 10 10 5 5 5 5 5
8 8 8 8 8 8 8 8 8 5 5 5 5 3 3 3
40 40 40 40 40 20 20 20 20 20 20 20 20 20 20 20

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1
40 40 40 40 40 40 40 40 40 20 20 20 20 20 20 10
2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1
15 15 15 15 15 15 15 15 15 7 7 7 7 7 7 7
10 10 10 10 10 10 10 10 10 5 5 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 5 5 3 3 3
40 40 40 40 40 40 40 20 20 20 20 20 20 20 20 20

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 1 1 1 1 1 1 1 1
40 40 20 20 20 20 20 20 20 20 20 10 10 10 10
2 2 2 2 2 2 2 1 1 1 1 1 1 1 1
15 15 15 15 15 15 15 15 15 7 7 7 7 7 7
10 10 10 10 10 10 10 10 10 5 5 5 5 5 5
8 8 8 8 8 8 8 5 5 5 3 3 3 1 1
40 40 20 20 20 20 20 20 20 10 10 10 10 10 10

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1
40 40 40 40 40 40 40 40 40 20 20 20 20 20 20 10
2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1
15 15 15 15 15 15 15 15 15 7 7 7 7 7 7 7
10 10 10 10 10 10 10 10 10 5 5 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 5 5 3 3 3
40 40 40 40 40 40 40 20 20 20 20 20 20 20 20 20

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1
40 40 40 40 40 40 40 40 40 20 20 20 20 20 20 10
2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1
15 15 15 15 15 15 15 15 15 7 7 7 7 7 7 7
10 10 10 10 10 10 10 10 10 5 5 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 5 5 3 3 3
40 40 40 40 40 40 40 20 20 20 20 20 20 20 20 20

1 1 1
2 2 2
6 4 4
25 15 15
50

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 2 2 2 2
30 30 30 30 30 30 30 30 30 20 20 10 10 5 5
10 10 10 10 10 10 10 10 10 5 5 5
6 6 6 6 6 6 6 6 6 6 6 3 3 3 3
40 40 40 40 40 40 40 40 40 20 20 20 20 10 10

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
30 30 30 30 30 30 30 30 30 30 30 30 30 30 20 20
10 10 10 10 10 10 10 10 10 10 10 10 10 10 5 5
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
40 40 40 40 40 40 40 40 40 40 40 40 40 40 20 20

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 2 2 2 2
30 30 30 30 30 30 30 30 30 20 20 10 10 5 5
10 10 10 10 10 10 10 10 10 5 5 5
6 6 6 6 6 6 6 6 6 6 6 3 3 3 3
40 40 40 40 40 40 40 40 40 20 20 20 20 10 10

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
30 30 30 30 30 30 30 30 30 30 30 30 30 30 20 20
10 10 10 10 10 10 10 10 10 10 10 10 10 10 5 5
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
40 40 40 40 40 40 40 40 40 40 40 40 40 40 20 20

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4
10 10 10 10 10 10 10 9 9 8 8 8 8 8 5 4
10 10 10 10 10 10 10 9 9 9 9 9 9 9 5 4
200 200 180 180 180 180 180 180 180 100 100 90 90 90 90 40
10 10 10 10 10 10 10 9 9 8 8 8 5 5 5 4
75 75 75 75 75 75 75 75 75 35 35 35 35 35 35 28
50 50 50 50 45 45 45 45 45 20 20 20 20 20 20 0
40 40 40 40 40 40 40 37 37 34 32 23 23 13 13 12
200 200 180 180 180 160 160 100 100 90 90 90 90 90 90 80

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2
4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2
12 12 12 12 12 12 12 12 12 12 12 10 10 10 10 6
120 120 120 120 120 120 120 120 120 100 100 80 80 70 50 40
40 40 40 40 40 40 40 40 40 30 30 30 20 20 10 10
24 24 24 24 24 24 24 24 24 24 24 18 18 18 18 12
160 160 160 160 160 160 160 160 160 120 120 120 120 100 60 40
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
8 8 8 8 8 8 8 8 8 8 6 6 6 6 6 6
30 30 30 30 30 30 30 30 30 30 15 15 15 10 10 10
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
30 30 30 30 30 30 30 30 30 25 25 25 15 15 15 15
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1
3 3 3 3 3 3 3 3 3 2 2 2 2 1 1 1
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
12 12 12 12 12 12 12 12 12 12 12 12 12 12 8 8
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 8 8 8 8 8 8 8 8 8 8 8 8 6 6 6
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Rev. 0
2021
8 9 10 11 12
Remarks.
Aug Sep Oct Nov Dec
38 39 40 41 42

1 1 1 1
1 1
1 1 1 1
10 10 5 5
1 1
7 7

3 3 1 1

1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
10 10 5 5 5
1 1 1 1
7 7 7 7

3 3 1 1 1
20 20
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
10 10 5 5 5
1 1 1 1
7 7 7 7

3 3 1 1 1
20 20

1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
10 10 5 5 5
1 1 1 1
7 7 7 7

3 3 1 1 1
20 20

1 1 1 1

1 1 1 1
2 2 2 2
10 10 5 5
5
3 3 3 3
20 20 10 10

1 1 1 1

1 1 1 1
2 2 2 2
10 10 5 5
5
3 3 3 3
20 20 10 10

4 4 4 4 3
4 4 3 3 3
4 4 4 4 3
40 40 20 20 15
4 4 3 3 0
28 28 21 21 0
0 0 0 0 0
12 12 4 4 3
60 60 0 0 0

2 2 2 2 0
0 0 0 0 0
2 2 2 2 0
4 4 4 4 0
20 20 10 10 0
10 0 0 0 0
6 6 6 6 0
40 40 20 20 0
0 0 0 0 0

2 2 2 1 1
6 3 3 2 2
10 10 10 5
1 1 1 1
2 2 1 1 1
10 10 10 10
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
8 8 6 6 6
8 6 6 6 6
10 10 10 8 8
1 1 1 1 1
6 4 4 2 1
2 2 2 2 1
1 1 1 1 1

6 6 6 6 6
3 3 3 3 3
2 2 2 2 2
2 2 2 2 2
4 4 2 2 2
5 5 3 3 3
2 2 1 1 1
5 5 2 2 2
Consideration Nationality
Code Group name maximun requiement Thai
(Person) (Person)

Summary 1 - 5 ( Sub-Structure )
A Chief front en. 5 5
A Civil en 10 7
B Technician Structure 10 7
C Headman and Labours Structure 200 50
B Technician Formworks 10 7
C Headman and Labours Formworks 75 25
C General Housekeeping 50 5
B Site Store , Site documment and other 40 10
0 Unit rate Sub-contractor (local) 200 0

Summary 6 - 9 ( Station )
A Chief front 4 4
A Civil en 4 4
A Architect 4 4
B Technician 12 6
C Headman and Labours 120 40
C General Housekeeping 40 4
B Site Store , Site documment and other 24 8
0 Unit rate Sub-contractor ( local) 160 0
E&M

Balance Cantiliver 3 Location


A Chief front en. 1 1
A En 2 2
B Technician 6 3
C Labours 25 10
0 Sub-contractor ( local ) 50 0

Pool Department for site service


A Survey Chief + en ( 1 + 2 ) 3 3
B Technician + autocad 8 8
C instrument + labours 30 6
A Chief en. ( electrical + mechanical ) 1 1
A EN ( electrical + mechanical ) 2 2
B Technician + Helper (1+2) 30 10
A chief en. Technical 1 1
A tenhnical engineer 2 2
B Autocad 3 1
B Main store 8 4
B Cook + helper (1+2) 12 4
0 House keeping 15 0
A Chief safety 1 1
B Safety officer 8 4
A QA 3 2
0 Camp Boss 2 0

Main office
A Account 6 3
A Admin 5 2
B Payroll 3 1
B Cost 2 2
B Procurement 4 2
B Commercial / QS (4+1) 5 3
B IT 2 1
0 office boy 5 0

total 1213 265

summary as planning actual


Type of camp building
(person) (person)
A = Thai Engineer 44 50
B = Thai Staff 81 100
C = Thai Labours 140 200
Local manpower 948 1000
total 1213 1350
Nationality
Local
(Person)

0
3
3
150
3
50
45
30
200

0
0
0
6
80
36
16
160

0
0
3
15
50

0
0
24
0
0
20
0
0
2
4
8
15
0
4
1
2

3
3
2
0
2
2
1
5

948

building
(nos) Remarks
1 40 person/building
3 40 person/building
3 80 person/building
0 all local position JV not provide accommodation salary already inclusive
7
Footing
Pier No.
Type WxLxH

P628 NP 6x6x2

P627 NP 6x6x2

P626 SP 7.50 x 7.50 x 2.50

P625 SP 7.50 x 7.50 x 2.50

P624 SP 7.50 x 7.50 x 2.50

P623 SP 7.50 x 7.50 x 2.50

P622 SP 7.50 x 7.50 x 2.50

P621 SP 7.50 x 7.50 x 2.50

P620 SP 7.50 x 7.50 x 2.50

P619 NP 6x6x2

P618 NP 6x6x2

P617 NP 6x6x2

P616 NP 6x6x2

P615 NP 6x6x2

P614 NP 6x6x2

P613 NP 6x6x2

P612 NP 6x6x2

P611 NP 6x6x2

P610 SB 9.9 x 9.9 x 2.5

P609 SB 9.9 x 9.9 x 2.5

P608 NP 6x6x2

P607 AP 6x6x2

P606 AP 6x6x2

P605 AP 6x6x2

P604 NP 6x6x2

P603 NP 6x6x2

P602 NP 6x6x2

P601 NP 6x6x2

P600 NP 6x6x2

P599 NP 6x6x2

P598 NP 6x6x2

P597 NP 6x6x2

P596 NP 6x6x2

P595 SB 9.9 x 9.9 x 2.5

P594 SB 9.9 x 9.9 x 2.5

P593 NP 6x6x2
P592 NP 6x6x2

P591 NP 6x6x2

P590 SP 7.50 x 7.50 x 2.50

P589 SP 7.50 x 7.50 x 2.60

P588 SP 7.50 x 7.50 x 2.50

P587 SP 7.50 x 7.50 x 2.50

P586 SP 7.50 x 7.50 x 2.50

P585 SP 7.50 x 7.50 x 2.50

P584 SP 7.50 x 7.50 x 2.50

P583 NP 6x6x2

P582 NP 6x6x2

P581 L PP 8x5x2

P581 R PP 8x5x2

P580 AP 6 X 6 x 2.50

P579 CP 6.40 x 6.40 x 2.50

P578 L PP 5x5x2

P578 R PP 5x5x2

P577 NP 6x6x2

P576 NP 6x6x2

P575 AP 6x6x2

P574 L PP 5x5x2

P574 R PP 5x5x2

P573 L PP 5x5x2

P573 R PP 5x5x2

P572 L PP 8x5x2

P572 R PP 8x5x2

P571 AP 6x6x2

P570 NP 6x6x2

P569 NP 6x6x2

P568 NP 6x6x2

P567 NP 6x6x2

P566 NP 6x6x2

P565 AP 6x6x2

P564 L PP 5x5x2

P564 R PP 5x5x2

P563 AP 6 x 6 x 2.60

P562 NP 6x6x2

P561 L PP 5x5x2

P561 R PP 5x5x2

P560 AP 6 x 6 x 2.20

P559 NP 6x6x2
P558 NP 6x6x2

P557 NP 6x6x2

P556 NP 6x6x2

P555 NP 6x6x2

P554 NP 6x6x2

P553 NP 6x6x2

P552 NP 6x6x2

P551 NP 6x6x2

P550 NP 6x6x2

P549 SP 7.50 x 7.50 x 2.50

P548 SP 7.50 x 7.50 x 2.60

P547 SP 7.50 x 7.50 x 2.50

P546 SP 7.50 x 7.50 x 2.50

P545 SP 7.50 x 7.50 x 2.50

P544 SP 7.50 x 7.50 x 2.50

P543 SP 7.50 x 7.50 x 2.50

P542 NP 6x6x2

P541 L PP 5x5x2

P541 R PP 5x5x2

P540 L PP 5x5x2

P540 R PP 5x5x2

P539 AP 6 x 6 x 2.20

P538 NP 6x6x2

P537 NP 6x6x2

P536 NP 6x6x2

P535 NP 6x6x2

P534 NP 6x6x2

P533 NP 6x6x2

P532 NP 6x6x2

P531 NP 6x6x2

P530 NP 6x6x2

P529 NP 6x6x2

P528 NP 6x6x2

P527 NP 6x6x2

P526 NP 6x6x2

P525 AP 6x6x2

P524 AP 6x6x2

P523 AP 6x6x2

P522 NP 6x6x2

P521 NP 6x6x2

P520 SP 7.50 x 7.50 x 2.50


P519 SP 7.50 x 7.50 x 2.50

P518 SP 7.50 x 7.50 x 2.50

P517 SP 7.50 x 7.50 x 2.50

P516 SP 7.50 x 7.50 x 2.50

P515 SP 7.50 x 7.50 x 2.50

P514 SP 7.50 x 7.50 x 2.50

P513 NP 6x6x2

P512 NP 6x6x2

P511 NP 6x6x2

P510 NP 6x6x2

P509 NP 6x6x2

P508 NP 6x6x2

P507 NP 6x6x2

P506 NP 6x6x2

P505 NP 6x6x2

P504 NP 6x6x2

P503 NP 6x6x2

P502 NP 6x6x2

P501 NP 6x6x2

P500 NP 6x6x2

P499 NP 6x6x2

P498 NP 6x6x2

P497 NP 6x6x2

P496 NP 6x6x2

P495 NP 6x6x2

P494 NP 6x6x2

P493 NP 6x6x2

P492 NP 6x6x2

P491 AP 6x6x2

P490 AP 6x6x2

P489 CP 6 x 6 x 2.50

P488 CP 6 x 6 x 2.50

P487 CP 6 x 6 x 2.50

P486 CP 6 x 6 x 2.50

P485 AP 6x6x2

P484 NP 6x6x2

P483 NP 6x6x2

P482 NP 6x6x2

P481 NP 6x6x2

P480 NP 6x6x2

P479 SB 9.9 x 15.4 x 3


P478 SB 9.9 x 15.4 x 3

P477

Summary of Footing Size


W x L x H (m)
1 5x5x2 14
2 6x6x2 99
3 6 x 6 x 2.2 2
4 6 x 6 x 2.5 5
5 6 x 6 x 2.6 1
6 6.4 x 6.4 x 2.5 1
7 7.5 x 7.5 x 2.5 26
8 7.5 x 7.5 x 2.6 2
9 8x5x2 4
10 9.9 x 15.4 x 3 2
11 9.9 x 9.9 x 2.5 4
total 160

B = 4 ea / 1 set , high of

แผ่นมุมทัง้ 4 ขนาด 1 m X 1 m

A = 4 ea / 1 set , high of formwork = 2.5 m

Remarks
As per working programme total requirement = 10 set ( 2 set /front)
Code

NP1

NP1

SP1

SP1

SP1

SP1

SP1

SP1

SP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

SB1

SB1

NP1

AP1

AP1

AP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

SB1

SB1

NP1
NP1

NP1

SP1

SP2

SP1

SP1

SP1

SP1

SP1

NP1

NP1

PP2

PP2

AP3

CP2

PP1

PP1

NP1

NP1

AP1

PP1

PP1

PP1

PP1

PP2

PP2

AP1

NP1

NP1

NP1

NP1

NP1

AP1

PP1

PP1

AP4

NP1

PP1

PP1

AP2

NP1
NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

SP1

SP2

SP1

SP1

SP1

SP1

SP1

NP1

PP1

PP1

PP1

PP1

AP2

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

AP1

AP1

AP1

NP1

NP1

SP1
SP1

SP1

SP1

SP1

SP1

SP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

AP1

AP1

CP1

CP1

CP1

CP1

AP1

NP1

NP1

NP1

NP1

NP1

SB2
SB2

ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea

B = 4 ea / 1 set , high of formwork = 2.5 m

D = 4 ea / 1 set , high of formwork = 2.5 m

4.0 m 2.5 m 3.0 m

C
D
B
C = 4 ea / 1 set , high of formwork = 2.5 m

et ( 2 set /front)
work = 2.5 m
Pier
Pier No.
Type WxL
P628 NP 2x2
P627 NP 2x2
P626 SP 2x3
P625 SP 2x3
P624 SP 2x3
P623 SP 2x3
P622 SP 2x3
P621 SP 2x3
P620 SP 2x3
P619 NP 2x2
P618 NP 2x2
P617 NP 2x2
P616 NP 2x2
P615 NP 2x2
P614 NP 2x2
P613 NP 2x2
P612 NP 2x2
P611 NP 2x2
P610 SB 3x3
P609 SB 3x3
P608 NP 2x2
P607 AP 2x2
P606 AP 2x2
P605 AP 2x2
P604 NP 2x2
P603 NP 2x2
P602 NP 2x2
P601 NP 2x2
P600 NP 2x2
P599 NP 2x2
P598 NP 2x2
P597 NP 2x2
P596 NP 2x2
P595 SB 3x3
P594 SB 3x3
P593 NP 2x2
P592 NP 2x2
P591 NP 2x2
P590 SP 2x3
P589 SP 2x3
P588 SP 2x3
P587 SP 2x3
P586 SP 2x3
P585 SP 2x3
P584 SP 2x3
P583 NP 2x2
P582 NP 2x2
P581 L PP 1.5 x 2.5
P581 R PP 1.5 x 2.5
P580 AP 2x3
P579 CP 2x3
P578 L PP 1.5 x 2.5
P578 R PP 1.5 x 2.5
P577 NP 2x2
P576 NP 2x2
P575 AP 2x2
P574 L PP 1.5 x 2.5
P574 R PP 1.5 x 2.5
P573 L PP 1.5 x 2.5
P573 R PP 1.5 x 2.5
P572 L PP 1.5 x 2.5
P572 R PP 1.5 x 2.5
P571 AP 2x2
P570 NP 2x2
P569 NP 2x2
P568 NP 2x2
P567 NP 2x2
P566 NP 2x2
P565 AP 2x2
P564 L PP 1.5 x 2.5
P564 R PP 1.5 x 2.5
P563 AP 2x3
P562 NP 2x2
P561 L PP 1.5 x 2.5
P561 R PP 1.5 x 2.5
P560 AP 2 x 2.5
P559 NP 2x2
P558 NP 2x2
P557 NP 2x2
P556 NP 2x2
P555 NP 2x2
P554 NP 2x2
P553 NP 2x2
P552 NP 2x2
P551 NP 2x2
P550 NP 2x2
P549 SP 2x3
P548 SP 2x3
P547 SP 2x3
P546 SP 2x3
P545 SP 2x3
P544 SP 2x3
P543 SP 2x3
P542 NP 2x2
P541 L PP 1.5 x 2.5
P541 R PP 1.5 x 2.5
P540 L PP 1.5 x 2.5
P540 R PP 1.5 x 2.5
P539 AP 2x2
P538 NP 2x2
P537 NP 2x2
P536 NP 2x2
P535 NP 2x2
P534 NP 2x2
P533 NP 2x2
P532 NP 2x2
P531 NP 2x2
P530 NP 2x2
P529 NP 2x2
P528 NP 2x2
P527 NP 2x2
P526 NP 2x2
P525 AP 2x2
P524 AP 2x2
P523 AP 2x2
P522 NP 2x2
P521 NP 2x2
P520 SP 2x3
P519 SP 2x3
P518 SP 2x3
P517 SP 2x3
P516 SP 2x3
P515 SP 2x3
P514 SP 2x3
P513 NP 2x2
P512 NP 2x2
P511 NP 2x2
P510 NP 2x2
P509 NP 2x2
P508 NP 2x2
P507 NP 2x2
P506 NP 2x2
P505 NP 2x2
P504 NP 2x2
P503 NP 2x2
P502 NP 2x2
P501 NP 2x2
P500 NP 2x2
P499 NP 2x2
P498 NP 2x2
P497 NP 2x2
P496 NP 2x2
P495 NP 2x2
P494 NP 2x2
P493 NP 2x2
P492 NP 2x2
P491 AP 2x2
P490 AP 2x2
P489 CP 2x3
P488 CP 2x3
P487 CP 2x3
P486 CP 2x3
P485 AP 2x2
P484 NP 2x2
P483 NP 2x2
P482 NP 2x2
P481 NP 2x2
P480 NP 2x2
P479 SB 3x3
P478 SB 3x3
P477

Summary of Pier Size


W x L (m)
1 1.5 x 2.5 18
2 2x2 100
3 2 x 2.5 1
4 2x3 35
5 3x3 6
total 160
Code
NPP1
NPP1
SPP1
SPP1
SPP1
SPP1
SPP1
SPP1
SPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
SBP1
SBP1
NPP1
APP1
APP1
APP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
SBP1
SBP1
NPP1
NPP1
NPP1
SPP1
SPP1
SPP1
SPP1
SPP1
SPP1
SPP1
NPP1
NPP1
PPP1
PPP1
APP3
CPP1
PPP1
PPP1
NPP1
NPP1
APP1
PPP1
PPP1
PPP1
PPP1
PPP1
PPP1
APP1
NPP1
NPP1
NPP1
NPP1
NPP1
APP1
PPP1
PPP1
APP3
NPP1
PPP1
PPP1
APP2
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
SPP1
SPP1
SPP1
SPP1
SPP1
SPP1
SPP1
NPP1
PPP1
PPP1
PPP1
PPP1
APP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
APP1
APP1
APP1
NPP1
NPP1
SPP1
SPP1
SPP1
SPP1
SPP1
SPP1
SPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
NPP1
APP1
APP1
CPP1
CPP1
CPP1
CPP1
APP1
NPP1
NPP1
NPP1
NPP1
NPP1
SBP1
SBP1

ea.
ea.
ea.
ea.
ea.
ea.
Summary piling Program
Project commencement date start from 6 June 2018 Rev. 0
Y 2018 2019
Item. Description Q'ty Unit Zone plan M October November December January February March April May June July August September October November December Remarks.
materials W 840 841 842 843 844 845 846 847 848 849 850 851 852 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953
1 Piling Rig 1
Dia. 1200 mm. Weekly 4 4 3 4 4 4 4 4 3 3 3 1.2 m L = 40 m
Sch.
P628 ---> P627 Cum. 1.5 m L = 45 m
1.1 40 nos.
P619 ---> P612 Conc. 184 184 138 184 184 184 184 184 138 138 138 2.2 m L = 45 m
mat.
Rebar 18 18 14 18 18 18 18 18 14 14 14 1.0 m L = 34 m
Zone 1
Dia. 1500 mm. Weekly 3 3 3 3 3 3 3 3 3 1
Sch.
P626 ---> P620 Cum.
1.2 28 nos.
Conc. 238.5 239 239 239 239 239 239 239 239 80
mat.
Rebar Test Pile = 1.5 m 24 24 24 24 24 24 24 24 24 8
Dia. 1200 mm. Weekly 2 3 3 3 3 3 3 3 3 2 2 3 3 3 3 3 2 1
Sch.
P527 ---> P521 Cum.
1.3 48 nos.
P513 ---> 509 Conc. 92 138 138 138 138 138 138 138 138 92 92 138 138 138 138 138 138 46
mat.
Rebar 9 14 14 14 14 14 14 14 14 9 9 14 14 14 14 14 14 5
Zone 2
Dia. 1500 mm. Weekly 1 3 3 3 3 3 3 3 3 2 1
Sch.
P520 ---> P514 Cum.
1.4 28 nos.
Conc. 80 239 239 239 239 239 239 239 239 159 80
mat.
Rebar 8 24 24 24 24 24 24 24 24 16 8
2 Piling Rig 2
Dia. 1200 mm. Weekly 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 1
Sch.
P611 Cum.
2.1 52 nos.
P608 ---> P597 Conc. 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 46
mat.
Rebar 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 5
Zone 1
Dia. 2200 mm. Weekly 2 2 2 2
Sch.
P610 ---> P609 Cum.
2.2 8 nos. Test Pile = 2.2 m
Conc. 342 342 342 342
mat.
Rebar 34 34 34 34
Dia. 1200 mm. Weekly 3 3 3 3 3 3 3 3 3 3 3 3 2 2
Sch.
P508 ---> P499 Cum.
2.3 40 nos. Zone 2
Conc. 138 138 138 138 138 138 138 138 138 138 138 138 92 92
mat.
Rebar 14 14 14 14 14 14 14 14 14 14 14 14 9 9
3 Piling Rig 3
Dia. 1200 mm. Weekly 4 4 4 4 3 4 1
Sch.
P596 Cum.
3.1 24 nos.
P593 ---> P591 Conc. 184 184 184 184 138 184 46
mat.
P583 ---> P582 Rebar 18 18 18 18 14 18 5
Dia. 2200 mm. Weekly 2 2 2 2
Sch.
P595 ---> P594 Cum.
3.2 8 nos.
Conc. 342 342 342 342
mat.
Rebar 34 34 34 34
Zone 1
Dia. 1500 mm. Weekly 3 3 3 3 3 3 3 3 3 1
Sch.
P590 ---> P584 Cum.
3.3 28 nos.
Conc. 239 239 239 239 239 239 239 239 239 80
mat.
Rebar 24 24 24 24 24 24 24 24 24 8
Dia. 1000 mm. Weekly 5 6 1
Sch.
PP581 Cum.
3.4 12 nos.
Conc. 134 160 27
mat.
Rebar 14 16 3
Dia. 1200 mm. Weekly 3 3 3 3 3 3 3 3 3 3 3 3 3 1
Sch.
P537 ---> P528 Cum.
3.5 40 nos. Zone 2
Conc. 138 138 138 138 138 138 138 138 138 138 138 138 138 46
mat.
Rebar 14 14 14 14 14 14 14 14 14 14 14 14 14 5
4 Piling Rig 4
Dia. 1200 mm. Weekly 2 2 4 3 3 3 3 3 1
Sch.
P580 ---> P579 Cum.
4.1 24 nos.
P577 ---> P575 Conc. 92 92 184 138 138 138 138 138 46
mat.
P571 Rebar 9 9 18 14 14 14 14 14 5
Zone 1
Dia. 1000 mm. Weekly 4 4 5 5 5 5 3 3 2
Sch.
PP578 Cum.
4.2 36 nos.
PP574 ---> PP572 Conc. 107 107 134 134 134 134 80 80 53
mat.
Rebar 10.8 11 14 14 14 14 8 8 5
Dia. 2200 mm. Weekly 3 3 3 3
Sch.
P478 ---> P479 Cum.
4.3 12 nos.
Conc. 513 513 513 513
mat.
Rebar 51 51 51 51
Zone 2
Dia. 1200 mm. Weekly 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 2 1
Sch.
P480 ---> P498 Cum.
4.4 76 nos.
Conc. 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 92 92 92 46
mat.
Rebar 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 9 9 9 5
5 Piling Rig 5
Dia. 1200 mm. Weekly 1 3 3 3 3 3 3 3 2 3 3 2 1 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2 3 3 2
Sch.
P570 ---> P565 , P563 ---> P562 Cum.
5.1 88 nos.
P560 ---> P550 , P542 Conc. 46 138 138 138 138 138 138 138 92 138 138 92 46 138 138 138 138 138 138 138 138 138 138 138 138 138 92 92 92 92 138 138 92
mat.
PP539 ---> PP538 Rebar 5 14 14 14 14 14 14 14 9 14 14 9 5 14 14 14 14 14 14 14 14 14 14 14 14 14 9 9 9 9 14 14 9
Dia. 1000 mm. Weekly 1 4 3 2 4 2 4 4 4 4
Sch.
PP564 Cum.
5.2 32 nos. Zone 1 Test Pile = 1.2 m Test Pile = 1.0 m
PP561 Conc. 27 107 80 53 107 53 107 107 107 107
mat.
PP541 ---> PP540 Rebar 3 11 8 5 11 5 11 11 11 11
Dia. 1500 mm. Weekly 1 3 3 3 3 3 3 3 3 2 1
Sch.
P549 ---> P543 Cum.
5.3 28 nos.
Conc. 80 239 239 239 239 239 239 239 239 159 80
mat.
Rebar 8 24 24 24 24 24 24 24 24 16 8

Weekly 7 7 13 13 15 15 15 15 14 18 17 17 17 17 17 15 16 15 17 18 18 13 14 15 15 13 15 15 15 14 15 15 15 15 15 13 12 12 11 10 8 8 10 10 10 9 8 7 4
Sch.
Cum. 7 14 27 40 55 70 85 100 114 132 149 166 183 200 217 232 248 263 280 298 316 329 343 358 373 386 401 416 431 445 460 475 490 505 520 533 545 557 568 578 586 594 604 614 624 633 641 648 652
Sub Total 652 nos.
Conc. M3 322 572 848 771 963.5 1,041 1,041 1,041 1,077 857 830 888 888 820 748 713 837 724 1,157 1,107 1,087 954 644 690 690 598 690 690 690 644 724 825 892 892 892 800 754 754 708 628 469 402 383 383 383 337 368 368 184
mat.
Rebar Ton 32 57 84 76.8 97 104 104 104 108 87 84 90 90 82 75 71 84 73 115 112 109 96 65 70 70 61 70 70 70 65 73 83 90 90 90 81 76 76 71 63 47 40 39 39 39 34 37 37 19
No. Pile nos 40 74 69 65 68 70 59 75 58 36 34 4 0 652
Monthly Production Concrete M3 2,513 5,163 3,463 3,118 4,075 3,576 2,714 4,225 3,644 1,637 1,456 184 0 35,767
Rebar Ton 250 517 351 312 409 361 275 426 367 165 147 19 0 3,599
Summary Weekly Pilecap Program
Pilecap Type 1) Assymmetry Pier (AP) 2) Catilever Pier (CP)
Type works. Q'ty
Item. Description AP CP NP PP SP SB Unit

1 Front A

1.1 P628 - P627 , P619 - P612 , P527 - P526 , P522 - P521 14 nos.
1.2 P626 - P620 , P520 - P516 12 nos.
1.3 P525 - P523 3 nos.
total nos.
Concrete M3
materials
Rebar Ton
2 Front B

2.1 P611 , P608 , P604 - P597 , P508 - P499 20 nos.


2.2 P610 - P609 2 nos.
2.3 P607 - P605 3 nos.
total nos.
Concrete M3
materials
Rebar Ton
3 Front C

3.1 P596 , P593 - P591 , P583 - P582 , P537 - P528 16 nos.


3.2 P595 - P594 2 nos.
3.3 P590 - P584 7 nos.
3.4 P581 2 nos.
total nos.
Concrete M3
materials
Rebar Ton
4 Front D

4.1 P580 , P575 , P571 , P485 , P490 - P491 6 nos.


4.2 P579 , P486 - P489 5 nos.
4.3 P578 , P574 - P572 8 nos.
4.4 P577 - P576 , P480 - P484 , P492 - P498 14 nos.
4.5 P478 - P479 2 nos.
total nos.
Concrete M3
materials
Rebar Ton
5 Front E
5.1 P570 - P566 , P562 , P559 - P550 , P542 , P538 , P513 - P509 23 nos.
5.2 P565 , P563 , P560 , P539 4 nos.
5.3 P564 , P561 , P541 - P540 8 nos.
5.4 P549 - P543 7 nos.
5.5 P515 - P514 2 nos.
total nos.
Concrete M3
materials
Rebar Ton

Summary 16 5 87 18 28 6 nos.

Monthly
2) Catilever Pier (CP) 3) Normal Pier (NP) 4) Portal Pier (PP) 5) Station Pier (SP)
No. Y
Pier plan M Jan Feb Mar Apr
W 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

14 Sch. Weekly 1 1
12 Sch. Weekly 1 1 1 1 1
3 Sch. Weekly
29 1 1 1 1 1 1 1
72 72 141 141 141 141 141
10.8 10.8 21.6 21.6 21.6 21.6 21.6

20 Sch. Weekly 1 1
2 Sch. Weekly 1 1
3 Sch. Weekly 1 1
25 1 1 1 1 1 1
72 245 245 72 72 72
11 37 37 11 11 11

16 Sch. Weekly 1 1 1 1
2 Sch. Weekly 1 1
7 Sch. Weekly
2 Sch. Weekly
27 1 1 1 1 1 1
72 245 245 72 72 72
11 37 37 11 11 11

6 Sch. Weekly 1 1
5 Sch. Weekly 1
8 Sch. Weekly 1 1
14 Sch. Weekly 1 1
2 Sch. Weekly
35 1 1 1 1 1 1 1
90 102 50 50 72 72 72
14 15 8 8 11 11 11
23 Sch. Weekly 1 1 1 1 1
4 Sch. Weekly 1
8 Sch. Weekly 1
7 Sch. Weekly
2 Sch. Weekly
44 1 1 1 1 1 1 1
72 72 72 72 72 72 50
11 11 11 11 11 11 8

160 Sch. no. 0 3 0 4 1 4 1 4 1 4 1 4 1 4 1

Weekly Conc 0 234 0 318 72 508 245 508 245 357 72 357 72 335 72

Rebar 0 35 0 48 11 77 37 77 37 55 11 55 11 51 11
Pilecap No. 8 10 10 10
Monthly Concrete 624 1,505 857 860
Rebar 95 228 131 132
6) Special Bridge (SB) Balance Cantiliver
2019
Apr May Jun Jul Aug
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

1 1 1 1 1 1 1 1
1 1

1 1 1 1 1 1 1 1 1 1
141 141 72 72 72 72 72 72 72 72
21.6 21.6 11 11 11 11 10.8 10.8 11 11

1 1 1 1 1 1 1 1

1
1 1 1 1 1 1 1 1 1
72 72 72 72 72 72 72 72 72
11 11 11 11 11 11 11 11 11

1 1

1 1 1 1 1 1 1
1
1 1 1 1 1 1 1 1 1 1
141 141 141 141 141 141 141 72 72 80
22 22 22 22 22 22 22 11 11 12

1 1 1 1 1 1
1
1 1
1 1 1 1 1 1 1 1 1 1
50 50 50 50 80 80 72 457 457 72
8 8 8 8 12 12 11 69 69 11
1 1 1 1 1
1 1
1 1 1

1 1 1 1 1 1 1 1 1 1
50 79 72 50 50 79 72 72 72 72
8 12 11 8 8 12 11 11 11 11

4 1 4 1 4 1 4 1 4 1 4 1 4 1 4 1 4 1 4 0

382 72 411 72 335 72 313 72 343 72 372 72 357 72 673 72 673 72 296 0

59 11 63 11 52 11 49 11 53 11 57 11 55 11 101 11 102 11 45 0
10 14 10 11 9
860 1,203 859 1,246 1,041
132 186 132 189 158
Sep Oct Nov Dec Jan
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3

1 1 1 1
1 1
1 1 1

1 1 1 1 1 1 1 1 1
72 72 72 72 72 72 72 141 141
11 11 11 11 11 11 11 22 22

1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1
72 72 72 72 72 72 72 72 72 72
11 11 11 11 11 11 11 11 11 11

1 1 1 1 1 1 1 1 1

1
1 1 1 1 1 1 1 1 1 1
80 72 72 72 72 72 72 72 72 72
12 11 11 11 11 11 11 11 11 11

1 1
1 1 1 1

1 1 1 1

1 1 1 1 1 1 1 1 1 1
72 72 72 72 72 90 90 90 90 72
11 11 11 11 11 14 14 14 14 11
1 1 1 1 1 1

1 1 1 1

1 1 1 1 1 1 1 1 1 1
72 72 72 72 72 72 141 141 141 141
11 11 11 11 11 11 22 22 22 22

3 1 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2

224 72 216 144 216 144 216 144 216 144 234 144 303 144 303 144 372 144 354 144

34 11 33 22 33 22 33 22 33 22 36 22 47 22 47 22 58 22 55 22
9 13 10 10 11
656 936 825 963 1,068
100 143 127 149 165
2
Jan Feb Mar Apr May Jun
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 1 1

1 1 1
141 141 141
22 22 22

1
72
11

1 1 1 1 1 1 1

1 1 1 1 1 1 1 1
72 72 72 72 72 72 72 72
11 11 11 11 11 11 11 11
1 1
1
1 1 1 1
1 1 1

1 1 1 1 1 1 1 1 1 1
141 141 141 72 50 50 50 50 79 72
22 22 22 11 8 8 8 8 12 11

3 1 3 0 3 0 2 0 2 0 2 0 2 0 2 0 1 0 1 0

354 72 354 0 354 0 144 0 122 0 122 0 122 0 122 0 79 0 72 0

55 11 55 0 55 0 22 0 19 0 19 0 19 0 19 0 12 0 11 0
11 6 4 4 4 2
1,068 708 266 244 273 282
165 110 41 38 42 44
2020
Jun Jul Aug Sep Oct
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
1 1 1 1 1

1 1
1 1 1 1 1 1 1
141 141 72 72 72 72 72
22 22 11 11 11 11 11

1 0 1 0 1 0 1 0 1 0 1 0 1

141 0 141 0 72 0 72 0 72 0 72 0 72

22 0 22 0 11 0 11 0 11 0 11 0 11
2 2 2 1 160
282 144 144 72 14,778
44 22 22 11 2,265
Rev. 0

Oct Nov Dec Remarks.


44 45 46 47 48 49 50 51 52
160 nos
14,778 m3
2,265 ton
IDM0604 Viaduct completed

CP05 Start CP06 = 14Km163.592


Pier Type 1) Assymmetry Pier (AP) SB SB NP NP NP NP NP AP

2) Catilever Pier (CP) P477 P478 P479 P480 P481 P482 P483 P484 P485

3) Normal Pier (NP) 45 70 45 28.6 35 40 35 26.16 30


4) Portal Pier (PP)
5) Special Bridge (SB) balance cantiliver

6) Station Pier (SP) 1 1 1 1 1 1 1 1 1

Y M w Pier number P477 P478 P479 P480 P481 P482 P483 P484 P485

182 52
181 51
Dec 42
180 50
179 49
178 48
177 47
Nov 41
176 46
175 45
174 44
173 43
Oct 40 172 42
171 41
170 40
169 39
168 38
Sep 39
167 37
166 36
165 35
164 34
Aug 38
163 33
162 32
161 31
160 30
July 37 159 29
158 28
157 27
21
156 9
155 8
Jun 36
154 7
153 6
152 5
151 4
May 35 150 3
149 2
148 1
147 17

Apr 34
146 16
Apr 34
145 15
144 14
143 13
142 12
Mar 33
141 11
140 10
139 9
138 8
Fab 32
137 7
136 6
135 5
134 4
Jan 31 133 3
132 2 IMD 0603 = 924 Days
131 1
130 52
129 51 IMD 0604 = 896 Days
Dec 30
128 50
127 49
126 48
125 47
Nov 29
124 46
123 45
122 44
121 43
Oct 28 120 42
119 41
118 40
117 39 LG #2 = 20 spa
116 38
Sep 27
115 37
114 36
113 35
112 34
Aug 26
111 33
110 32
109 31
108 30
July 25 107 29
106 28
105 27
20
104 9
LG #2
103 8 IMD -0602 = 714 Days Assembly
Jun 24
102 7 closing segment
101 6
100 5
99 4
May 23
May 23 98 3
97 2
96 1
95 17
94 16
Apr 22 Segment casting = 2
93 15
92 14
91 13
90 12
Mar 21
89 11
88 10
87 9
86 8
Fab 20
85 7
84 6
83 5
82 4
Jan 19 81 3
80 2
79 1
78 52
77 51
Dec 18
76 50
75 49
74 48
73 47
Nov 17
72 46
71 45
70 44
69 43
Oct 16 68 42
borpil
67 41
e Rig
66 40 #4
65 39 total
64 38
scope
Sep 15 = 84
63 37 pile @
62 36 2
61 35 pile/d
ay
60 34
Aug 14 durati
59 33 on = 7
58 32 mont
57
h
31
56 30
July 13 55 29
54 28
53 27
19
52 9
51 8
Jun 12
19

Jun 12
50 7
49 6 IMD 0601 = 336 Days
48 5
47 4
May 11 46 3
45 2
44 1
43 17
42 16
Apr 10
41 15
40 14
39 13
38 12
Mar 9
37 11
36 10
35 9
34 8
Fab 8
33 7
32 6
31 5
30 4
Jan 7 29 3
28 2
27 1
26 52
25 51
Dec 6
24 50
23 49
22 48
21 47
Nov 5
20 46
19 45 Test Pile should be start in the month of Nov18
18 44
17 43
Oct 4 16 42
15 41
14 40
18
13 39
12 38
Sep 3
11 37
10 36
9 35
8 34
Aug 2
7 33
6 32
5 31
4 30
July 1 3 29
July 1
2 28
1 27

CP06
SB SB NP NP NP NP NP AP
P477 P478 P479 P480 P481 P482 P483 P484 P485
45 70 45 28.6 35 40 35 26.16 30

balance cantiliver
14Km953.353
CP CP CP CP AP AP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP

P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505 P506 P507 P508

30 30 30 30 30 25 40 30 30 30 30 30 30 40 25 30 30 30 30 30 30 30 25

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505 P506 P507 P508
LG #1
Dismantling

LG #2
Dismantling

LG #2 = 20 span @ 5 day / sapn

Completion at least contimuous 2.5 KM length of viaduct


Segment casting = 20 span

borpil
e Rig
#4
total
scope
= 84
pile @ borpil
2 e Rig
pile/d #2
ay total
durati scope
on = 7 = 44
mont pile
h @2
pile/d
ay
durati
on =
3.5
mont
h
on =
3.5
mont
h
1 July 2018 commencement date

CP CP CP CP AP AP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP
P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505 P506 P507 P508
30 30 30 30 30 25 40 30 30 30 30 30 30 40 25 30 30 30 30 30 30 30 25
15Km676.250
NP NP NP NP NP SP SP SP SP SP SP SP NP NP AP AP AP NP NP NP NP NP NP

P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527 P528 P529 P530 P531

40 30 30 23 22.9 30 30 30 30 30 30 32 45 30 30 27 30 30 30 30 30 30 30

shahbag station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527 P528 P529 P530 P531
Viaduct Construction Completed. Will complete the remaining of Viaducts, Deck Furnitue

5 KM length of viaduct to allow the CP07 contractor for first installation of track works. will complete Viaducts, Deck Furniture
borpil
e Rig
#1
total
scope
= 76
pile @
2
pile/d
ay
durati
on = 6
mont
h
NP NP NP NP NP SP SP SP SP SP SP SP NP NP AP AP AP NP NP NP NP NP NP
P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527 P528 P529 P530 P531
40 30 30 23 22.9 30 30 30 30 30 30 32 45 30 30 27 30 30 30 30 30 30 30

shahbag station
IDM 0602 Viaduct complete startin

16Km491.053
NP NP NP NP NP NP NP AP PP PP NP SP SP SP SP SP SP SP NP NP NP NP NP

P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549 P550 P551 P552 P553 P554

30 30 30 30 30 30 40 40 40 40 28.25 30 30 30 30 30 30 30 30 30 30 30 30

TSC station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549 P550 P551 P552 P553 P554
Viaducts, Deck Furnitue (incl. MEP Works) starting from 16km491.503 to 14km163.592 where distance continuously equal 2,327

aducts, Deck Furniture (Incl. MEP Works) starting from 19KM085.503 to 16Km491.503 where distance continuously equal 2,59
Cross Beam

LG #1 = 80 span @ 5 day /span


Cross Beam

Segment casting = 80 span

Sub-structure group C

borpil
e Rig Sub-structure group E
#3
total Sub-structure group A
scope
= 40
pile @
2 Sub-structure group B
pile/d
ay
durati
on =
3.5
mont
h
borpile Rig # 5total scope = 148 pile @
2 pile/day duration = 11 month
1 July 2018 commencement da

NP NP NP NP NP NP NP AP PP PP NP SP SP SP SP SP SP SP NP NP NP NP NP
P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549 P550 P551 P552 P553 P554
30 30 30 30 30 30 40 40 40 40 28.25 30 30 30 30 30 30 30 30 30 30 30 30

TSC station
iaduct complete starting from 19km085.503 - 16Km491.503 continuously

NP NP NP NP NP AP PP NP AP PP AP NP NP NP NP NP AP PP PP PP AP NP NP

P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571 P572 P573 P574 P575 P576 P577

30 30 30 32 30 40 35 35 40 40 30 30 30 30 30 30 40 40 40 30 30 30 30

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571 P572 P573 P574 P575 P576 P577
ontinuously equal 2,327.911 km.

continuously equal 2,594 km.


80 span

Cross Beam

Cross Beam
LG #1
Cross Beam Assembly
Cross Beam
LG #1
Assembly

Cross Beam

borpil
e Rig
#4
total
scope
= 60
pile @
2
pile/d
ay
durati
on =
4.5
mont
h
8 commencement date

NP NP NP NP NP AP PP NP AP PP AP NP NP NP NP NP AP PP PP PP AP NP NP
P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571 P572 P573 P574 P575 P576 P577
30 30 30 32 30 40 35 35 40 40 30 30 30 30 30 30 40 40 40 30 30 30 30
17Km776.503
PP CP AP PP NP NP SP SP SP SP SP SP SP NP NP NP SB SB NP NP

P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592 P593 P594 P595 P596 P597

40 30 40 40 23 20 30 30 30 30 30 30 32 32 32 45 70 45 30 30

press club station balance cantiliver

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592 P593 P594 P595 P596 P597
LG #2
Dismantling

closing segment

Cross Beam

Segment castin

sub- structure Group C


LG #1
Assembly team 2
LG #1
Assembly

Cross Beam

borpile Rig
Sub-structure Group D pile/day d

borpile Rig # 3 total scope = 72 pile @


2 pile/day duration = 6 month
PP CP AP PP NP NP SP SP SP SP SP SP SP NP NP NP SB SB NP NP
P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592 P593 P594 P595 P596 P597
40 30 40 40 23 20 30 30 30 30 30 30 32 32 32 45 70 45 30 30

press club station balance cantiliver


NP NP NP NP NP NP NP AP AP AP NP SB SB NP NP NP NP NP NP NP

P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609 P610 P611 P612 P613 P614 P615 P616 P617

40 30 30 30 30 30 25 25 30 28 45 70 45 35 30 30 30 40 40 30

balance cantiliver

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609 P610 P611 P612 P613 P614 P615 P616 P617
LG #2 = 42 span @ 5 day / sapn

Segment casting = 42 span closing segment

Sub- structure Group B


Balance catiliver team

team1

borpile Rig # 1 total scope


pile/day duration = 5.5 m
borpile Rig # 2 total scope = 60 pile @ 2
pile/day duration = 5 month
1 July 2018 com

NP NP NP NP NP NP NP AP AP AP NP SB SB NP NP NP NP NP NP NP
P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609 P610 P611 P612 P613 P614 P615 P616 P617
40 30 30 30 30 30 25 25 30 28 45 70 45 35 30 30 30 40 40 30

balance cantiliver
end of contract CP06 = 19Km085.503
NP NP SP SP SP SP SP SP SP NP NP Pier type

P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628 Pier number

30 30 30 30 30 30 30 30 30 30 Span length (m)


total 4,922 m
motijheel station
1 1 1 1 1 1 1 1 1 1 sum 151 span

P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628 Pier number w M Y

52 182
51 181
42 Dec
50 180
49 179
48 178
47 177
41 Nov
46 176
45 175
44 174
43 173
42 172 40 Oct
41 171
40 170
39 169
38 168
39 Sep
37 167
36 166
35 165
34 164
38 Aug
33 163
32 162
31 161
30 160
29 159 37 July
28 158
27 157
21
9 156
8 155
36 Jun
7 154
6 153
5 152
4 151
3 150 35 May
2 149
1 148
17 147

34 Apr
16 146
34 Apr
15 145
14 144
13 143
12 142
33 Mar
11 141
10 140
9 139
8 138
32 Feb
7 137
6 136
5 135
4 134
3 133 31 Jan
IMD 0603 = 924 Days 2 132
1 131
52 130
IMD 0604 = 896 Days 51 129
30 Dec
50 128
49 127
48 126
47 125
29 Nov
46 124
45 123
44 122
43 121
42 120 28 Oct
41 119
40 118
39 117
38 116
27 Sep
37 115
36 114
35 113
34 112
26 Aug
33 111
32 110
31 109
30 108
29 107 25 July
28 106
27 105
20
9 104
IMD -0602 = 714 Days 8 103
24 Jun
7 102
6 101
5 100
4 99
23 May
3 98 23 May
2 97
1 96
17 95
16 94
22 Apr
15 93
14 92
13 91
12 90
21 Mar
11 89
10 88
9 87
8 86
20 Feb
7 85
6 84
5 83
4 82
3 81 19 Jan
2 80
1 79
52 78
51 77
18 Dec
50 76
49 75
48 74
47 73
17 Nov
46 72
45 71
44 70
43 69
42 68 16 Oct
41 67
40 66
39 65
38 64
15 Sep
37 63
36 62
35 61
34 60
14 Aug
33 59
32 58
31 57
30 56
29 55 13 July
LG #2
Assembly 28 54
27 53
19
9 52
8 51
12 Jun
Assembly
19

12 Jun
7 50
IMD 0601 = 336 Days 6 49
5 48
4 47
Sub-structure Group A 3 46 11 May
2 45
1 44
17 43
16 42
10 Apr
15 41
borpile Rig # 1 total scope = 68 pile @ 2
pile/day duration = 5.5 month 14 40
13 39
12 38
9 Mar
11 37
10 36
9 35
8 34
8 Feb
7 33
6 32
5 31
4 30
3 29 7 Jan
2 28
1 27
52 26
51 25
6 Dec
50 24
49 23
48 22
47 21
5 Nov
46 20
45 19
44 18
43 17
42 16 4 Oct
41 15
40 14
18
39 13
38 12
3 Sep
37 11
36 10
35 9
34 8
2 Aug
33 7
32 6
31 5
30 4
29 3 1 July
1 July
28 2
1 July 2018 commencement date 27 1

end of contract CP06


NP NP SP SP SP SP SP SP SP NP NP Pier type

P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628 Pier number
30 30 30 30 30 30 30 30 30 30 Span length (m)
total 4,922 m
motijheel station
CP05 Start CP06 = 14Km163.592
Pier Type 1) Assymmetry Pier (AP) SB SB NP NP NP NP NP

2) Catilever Pier (CP) P477 P478 P479 P480 P481 P482 P483 P484

3) Normal Pier (NP) 45 70 45 28.6 35 40 35 26.16


4) Portal Pier (PP)
5) Special Bridge (SB) balance cantiliver

6) Station Pier (SP) 1 1 1 1 1 1 1 1

Y M w Pier number P477 P478 P479 P480 P481 P482 P483 P484
total contract = 1274 Days
182 52
181 51
Dec 42
180 50
179 49 IMD 0607 = 1246 Days
178 48
177 47
Nov 41
176 46
175 45 IMD 0608 =1218 Days
174 44
173 43
Oct 40 172 42
171 41
170 40
169 39
168 38
Sep 39
167 37
166 36
165 35
164 34
Aug 38
163 33
162 32
161 31
160 30
July 37 159 29
158 28
157 27
21
156 9
155 8
Jun 36
154 7 IMD 0606 , 0609 = 1071 Days
153 6
152 5
151 4
May 35 150 3
149 2 IMD 0605 = 1043 Days
148 1
147 17

Apr 34
146 16
Apr 34
145 15
144 14
143 13
142 12
Mar 33
141 11
140 10
139 9
138 8
Fab 32
137 7
136 6
135 5
134 4
Jan 31 133 3
132 2 IMD 0603 = 924 Days
131 1
130 52
129 51 IMD 0604 = 896 Days
Dec 30
128 50
127 49
126 48
125 47
Nov 29
124 46
123 45
122 44
121 43
Oct 28 120 42
119 41
118 40
117 39
116 38
Sep 27
115 37
114 36
113 35
112 34
Aug 26
111 33
110 32
109 31
108 30
July 25 107 29
106 28
105 27
20
104 9
103 8 IMD -0602 = 714 Days
Jun 24
102 7 closing segment
101 6
100 5
99 4
May 23
May 23 98 3
97 2
96 1
95 17
94 16
Apr 22
93 15
92 14
91 13
90 12
Mar 21
89 11
88 10
87 9
86 8
Fab 20
85 7
84 6
83 5
82 4
Jan 19 81 3
80 2
79 1
78 52
77 51
Dec 18
76 50
75 49
74 48
73 47
Nov 17
72 46
71 45
70 44
69 43
Oct 16 68 42
67 41
66 40
65 39
64 38
Sep 15
63 37
62 36
61 35
60 34
Aug 14
59 33
58 32
57 31
56 30
July 13 55 29
54 28
53 27
19 LG #1
52 9 Assembly
51 8
Jun 12
19 LG #1
Assembly
Jun 12
50 7
49 6 IMD 0601 = 336 Days
48 5
47 4
May 11 46 3
45 2
44 1
43 17
42 16
Apr 10
41 15
40 14
39 13
38 12
Mar 9
37 11
36 10
35 9
34 8
Fab 8
33 7
32 6
31 5
30 4
Jan 7 29 3
28 2
27 1
26 52
25 51
Dec 6
24 50
23 49
22 48
21 47
Nov 5
20 46
19 45 Test Pile should be start in the month of Nov18
18 44
17 43
Oct 4 16 42
15 41
14 40
18
13 39
12 38
Sep 3
11 37
10 36
9 35
8 34
Aug 2
7 33
6 32
5 31
4 30
July 1 3 29
July 1
2 28
1 27

CP06
SB SB NP NP NP NP NP
P477 P478 P479 P480 P481 P482 P483 P484
45 70 45 28.6 35 40 35 26.16

balance cantiliver

Note
1 LG segment erection = 2 number
2 Balance cantiliver = 2 set substrure + 4 set form traveller
3 sub- structre works front will be mobilize = 5 group (formwork foot
4 borpile Rig = 5 Rig
5 Segment casting production require casting yards 03/04 provide pla
14Km953.353
AP CP CP CP CP AP AP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP

P485 P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505 P506 P507

30 30 30 30 30 30 25 40 30 30 30 30 30 30 40 25 30 30 30 30 30 30 30

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P485 P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505 P506 P507
Completion at least contimuous 2.5 KM length of viad
LG #1 erection = 43 span @ 5 days/span
duration = 8.5 month

Segment casting time duration = 13 month


borpile Rig # 1 total scope = 92 pile @ 2
pile/day duration = 7 month

Front A
1 July 2018 commencement date

AP CP CP CP CP AP AP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP
P485 P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505 P506 P507
30 30 30 30 30 30 25 40 30 30 30 30 30 30 40 25 30 30 30 30 30 30 30

set form traveller


e = 5 group (formwork footing 10 set , Pier NP 8 set , Pier SP = 4 , Pier CP = 2 set , Pier AP = 2 set , Portal pier PP = 4 set

ing yards 03/04 provide planning and estimation number of bed and formworks as CP06 time frame
15Km676.250
NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP AP AP AP NP NP NP NP NP

P508 P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527 P528 P529 P530

25 40 30 30 23 22.9 30 30 30 30 30 30 32 45 30 30 27 30 30 30 30 30 30

shahbag station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P508 P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527 P528 P529 P530
Viaduct Construction Completed. Will complete the remaining of Viaducts, Deck Furn

us 2.5 KM length of viaduct to allow the CP07 contractor for first installation of track works. will complete Viaducts, Deck Furni
LG #1
Dismantling

= 13 month

LG#2Assembly
borpil
e Rig
#2
total
scope
= 92
pile
@2
pile/d
ay
durati
on = 7

mont
h

Front B
NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP AP AP AP NP NP NP NP NP
P508 P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527 P528 P529 P530
25 40 30 30 23 22.9 30 30 30 30 30 30 32 45 30 30 27 30 30 30 30 30 30

shahbag station
16Km491.053
NP NP NP NP NP NP NP NP AP PP PP NP SP SP SP SP SP SP SP NP NP NP NP

P531 P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549 P550 P551 P552 P553

30 30 30 30 30 30 30 40 40 40 40 28.25 30 30 30 30 30 30 30 30 30 30 30

TSC station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P531 P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549 P550 P551 P552 P553
of Viaducts, Deck Furnitue (incl. MEP Works) starting from 16km491.503 to 14km163.592 where distance continuously equal 2

te Viaducts, Deck Furniture (Incl. MEP Works) starting from 19KM085.503 to 16Km491.503 where distance continuously equal
LG #2 erection = 70 span @ 5 day /span
Duration = 14 month

Cross Beam

Cross Beam
borpil
e Rig #
3 total
scope
= 88
pile @
2
pile/d
ay
durati
on =
6.8 Front C Front D
month
1 July 2018 commencemen

NP NP NP NP NP NP NP NP AP PP PP NP SP SP SP SP SP SP SP NP NP NP NP
P531 P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549 P550 P551 P552 P553
30 30 30 30 30 30 30 40 40 40 40 28.25 30 30 30 30 30 30 30 30 30 30 30

TSC station
NP NP NP NP NP NP AP PP NP AP PP AP NP NP NP NP NP AP PP PP PP AP NP

P554 P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571 P572 P573 P574 P575 P576

30 30 30 30 32 30 40 35 35 40 40 30 30 30 30 30 30 40 40 40 30 30 30

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P554 P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571 P572 P573 P574 P575 P576
nce continuously equal 2,327.911 km.

nce continuously equal 2,594 km.


pan @ 5 day /span

Segment time duration = 19 month


borpile Rig # 4 total scope = 152 pile @ 2
pile/day duration = 10.5 month

Front D
2018 commencement date

NP NP NP NP NP NP AP PP NP AP PP AP NP NP NP NP NP AP PP PP PP AP NP
P554 P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571 P572 P573 P574 P575 P576
30 30 30 30 32 30 40 35 35 40 40 30 30 30 30 30 30 40 40 40 30 30 30
17Km776.503
NP PP CP AP PP NP NP SP SP SP SP SP SP SP NP NP NP SB SB NP

P577 P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592 P593 P594 P595 P596

30 40 30 40 40 23 20 30 30 30 30 30 30 32 32 32 45 70 45 30

press club station balance cantiliver

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P577 P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592 P593 P594 P595 P596
LG #1
Dismantling

LG#2
LG#2 Dismantling
Dismantling
Balance catiliver tea
borpile Rig # 5 total scope = 100 pile @ 2
pile/day duration = 7.8 month

Front E
NP PP CP AP PP NP NP SP SP SP SP SP SP SP NP NP NP SB SB NP
P577 P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592 P593 P594 P595 P596
30 40 30 40 40 23 20 30 30 30 30 30 30 32 32 32 45 70 45 30

press club station balance cantiliver


NP NP NP NP NP NP NP NP AP AP AP NP SB SB NP NP NP NP NP NP

P597 P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609 P610 P611 P612 P613 P614 P615 P616

30 40 30 30 30 30 30 25 25 30 28 45 70 45 35 30 30 30 40 40

balance cantiliver

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P597 P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609 P610 P611 P612 P613 P614 P615 P616
LG #1
Dismantling

LG #1 erection = 29 span @ 5 days/span


duration = 5.5 month

Segment casting time duration = 9 month


borpile Rig # 2 total scope =
pile/day duration = 5 mon

borpile Rig # 1 total scope = 60 pile @ 2


pile/day duration = 4.5 month
NP NP NP NP NP NP NP NP AP AP AP NP SB SB NP NP NP NP NP NP
P597 P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609 P610 P611 P612 P613 P614 P615 P616
30 40 30 30 30 30 30 25 25 30 28 45 70 45 35 30 30 30 40 40

balance cantiliver
end of contract CP06 = 19Km085.503
NP NP NP SP SP SP SP SP SP SP NP NP Pier type

P617 P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628 Pier number

30 30 30 30 30 30 30 30 30 30 30 Span length (m)


total 4,922 m
motijheel station
1 1 1 1 1 1 1 1 1 1 1 sum 151 span

P617 P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628 Pier number w M Y
total contract = 1274 Days
52 182
51 181
42 Dec
50 180
IMD 0607 = 1246 Days 49 179
48 178
47 177
41 Nov
46 176
IMD 0608 = 1218 Days 45 175
44 174
43 173
42 172 40 Oct
41 171
40 170
39 169
38 168
39 Sep
37 167
36 166
35 165
34 164
38 Aug
33 163
32 162
31 161
30 160
29 159 37 July
28 158
27 157
21
9 156
8 155
36 Jun
IMD 0606 , 0609 = 1071 7 154
6 153
5 152
4 151
3 150 35 May
IMD 0605 = 1043 Days 2 149
1 148
17 147

34 Apr
16 146
34 Apr
15 145
14 144
13 143
12 142
33 Mar
11 141
10 140
9 139
8 138
32 Feb
7 137
6 136
5 135
4 134
3 133 31 Jan
IMD 0603 = 924 Days 2 132
1 131
52 130
IMD 0604 = 896 Days 51 129
30 Dec
50 128
49 127
48 126
47 125
29 Nov
46 124
45 123
44 122
43 121
42 120 28 Oct
41 119
40 118
39 117
38 116
27 Sep
37 115
on = 29 span @ 5 days/span
.5 month 36 114
35 113
34 112
26 Aug
33 111
32 110
31 109
30 108
29 107 25 July
28 106
27 105
20
9 104
IMD- 0602 = 714 Days 8 103
24 Jun
7 102
ng time duration = 9 month
6 101
LG #1
Assembly 5 100
4 99
23 May
LG #1
Assembly

3 98 23 May
2 97
1 96
17 95
16 94
22 Apr
15 93
14 92
13 91
12 90
21 Mar
11 89
10 88
9 87
8 86
20 Feb
7 85
6 84
5 83
4 82
3 81 19 Jan
2 80
1 79
52 78
51 77
18 Dec
50 76
49 75
48 74
47 73
17 Nov
46 72
45 71
44 70
43 69
42 68 16 Oct
41 67
borpile Rig # 2 total scope = 68 pile @ 2
40 66
pile/day duration = 5 month
39 65
38 64
15 Sep
37 63
36 62
35 61
34 60
14 Aug
33 59
32 58
31 57
30 56
29 55 13 July
28 54
27 53
19
9 52
8 51
12 Jun
19

12 Jun
7 50
IMD 0601 = 336 Days 6 49
5 48
4 47
3 46 11 May
2 45
1 44
17 43
16 42
10 Apr
15 41
14 40
13 39
12 38
9 Mar
11 37
10 36
9 35
8 34
8 Feb
7 33
6 32
5 31
4 30
3 29 7 Jan
2 28
1 27
52 26
51 25
6 Dec
50 24
49 23
48 22
47 21
5 Nov
46 20
45 19
44 18
43 17
42 16 4 Oct
41 15
40 14
18
39 13
38 12
3 Sep
37 11
36 10
35 9
34 8
2 Aug
33 7
32 6
31 5
30 4
29 3 1 July
1 July
28 2
1 July 2018 commencement date 27 1

end of contract CP06


NP NP NP SP SP SP SP SP SP SP NP NP Pier type

P617 P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628 Pier number
30 30 30 30 30 30 30 30 30 30 30 Span length (m)
total 4,922 m
motijheel station
IMD IMD IMD IMD
month 601 336 day 602 714 day 603 924 day 604
1 Jul 31 31 31 31 31 31 31
2 Aug 31 62 31 62 31 62 31
3 Sep 30 92 30 92 30 92 30
18
4 Oct 31 123 31 123 31 123 31
5 Nov 30 153 30 153 30 153 30
6 Dec 31 184 31 184 31 184 31
7 Jan 31 215 31 215 31 215 31
8 Feb 28 243 28 243 28 243 28
9 Mar 31 274 31 274 31 274 31
10 Apr 30 304 30 304 30 304 30
11 May 31 335 31 335 31 335 31
12 Jun 1 336 30 365 30 365 30
19
13 Jul 31 396 31 396 31
14 Aug 31 427 31 427 31
15 Sep 30 457 30 457 30
16 Oct 31 488 31 488 31
17 Nov 30 518 30 518 30
18 Dec 31 549 31 549 31
19 Jan 31 580 31 580 31
20 Feb 29 609 29 609 29
21 Mar 31 640 31 640 31
22 Apr 30 670 30 670 30
23 May 31 701 31 701 31
24 Jun 13 714 30 731 30
20
25 Jul 31 762 31
26 Aug 31 793 31
27 Sep 30 823 30
28 Oct 31 854 31
29 Nov 30 884 30
30 Dec 31 915 12
31 Jan 9 924
32 Feb
33 Mar
34 Apr
35 May
36 Jun
21
37 Jul
38 Aug
39 Sep
40 Oct
41 Nov
42 Dec
IMD IMD IMD IMD
896 day 605 1043 day 606 1071 day 607 1246 day 608 1218 day
31 31 31 31 31 31 31 31 31
62 31 62 31 62 31 62 31 62
92 30 92 30 92 30 92 30 92
123 31 123 31 123 31 123 31 123
153 30 153 30 153 30 153 30 153
184 31 184 31 184 31 184 31 184
215 31 215 31 215 31 215 31 215
243 28 243 28 243 28 243 28 243
274 31 274 31 274 31 274 31 274
304 30 304 30 304 30 304 30 304
335 31 335 31 335 31 335 31 335
365 30 365 30 365 30 365 30 365
396 31 396 31 396 31 396 31 396
427 31 427 31 427 31 427 31 427
457 30 457 30 457 30 457 30 457
488 31 488 31 488 31 488 31 488
518 30 518 30 518 30 518 30 518
549 31 549 31 549 31 549 31 549
580 31 580 31 580 31 580 31 580
609 29 609 29 609 29 609 29 609
640 31 640 31 640 31 640 31 640
670 30 670 30 670 30 670 30 670
701 31 701 31 701 31 701 31 701
731 30 731 30 731 30 731 30 731
762 31 762 31 762 31 762 31 762
793 31 793 31 793 31 793 31 793
823 30 823 30 823 30 823 30 823
854 31 854 31 854 31 854 31 854
884 30 884 30 884 30 884 30 884
896 31 915 31 915 31 915 31 915
31 946 31 946 31 946 31 946
28 974 28 974 28 974 28 974
31 1005 31 1005 31 1005 31 1005
30 1035 30 1035 30 1035 30 1035
8 1043 31 1066 31 1066 31 1066
5 1071 30 1096 30 1096
31 1127 31 1127
31 1158 31 1158
30 1188 30 1188
31 1219 30 1218
27 1246
IMD
609 1071 day
31 31
31 62
30 92
31 123
30 153
31 184
31 215
28 243
31 274
30 304
31 335
30 365
31 396
31 427
30 457
31 488
30 518
31 549
31 580
29 609
31 640
30 670
31 701
30 731
31 762
31 793
30 823
31 854
30 884
31 915
31 946
28 974
31 1005
30 1035
31 1066
5 1071