REKAPITULASI S

Ja

NO NAMA UNIT KERJA GROUP


1 Nofdianto Facility Planning & Facility
2 Adityo Fuad Ibrahim Safety Planning & Facility
3 Ridwan Rizkiawan Operation C Operation
4 Nuzuluddin Romadoni Operation A Operation
5 Haerudin Operation D Operation
6 Ahmad Satibi Operation D Operation
7 Firmanullah Operation D Operation
8 Ahmad Alfian Operation D Operation
9 Panji Purbo Laksono Operation D Operation
10 Zaenudin Operation D Operation
11 Arif Rahman Hakim Operation D Operation
12 Rudi Gunawan Operation D Operation
13 Irfan Maulana Operation C Operation
14 Rochmat Yuniarto Operation C Operation
15 Yogi Saputra Operation C Operation
16 Syeprinaldi Operation C Operation
17 Imam Mahhdi Operation C Operation
18 Alan Gunawan Facility planning & Facility
19 Widhi Satya Nugraha Mechanic Maintenance
20 Sudrajat Mechanic Maintenance
21 Feri Budiman Safety Planning & Facility
22 Ilhamsyah Safety Planning & Facility
23 Feri Budiman Safety Planning & Facility
24 Fery Ahrita Sembiring Operation C Operation
25 Fery Ahrita Sembiring Operation C Operation
26 Irfan Maulana Operation C Operation
27 Irfan Maulana Operation C Operation
28 Rifqi Planning Planning & Facility
29 Ahmad Zainudin Planning Planning & Facility
30 Ilhamsyah Planning Planning & Facility
31 Mifhatul Ulum Mechanic mAINtenance
32 Sangsang Electric Maintenance
33 Diki Kapriadi Electric Maintenance
34 Baginta I&C Maintenance
35 Gery Uhono I&C Maintenance
36 Bayu Sumahan I&C Maintenance
TOTAL

Operation 19
Mechanical 3
Electrical 2
I&C 3
Planning & facility 9
Procurement 0
HRD 0
Finance 0
Total 36
REKAPITULASI SUMBANG SARAN
Jan-20

JUDUL
Pemanfaatan tabung gas freon
Mencegah paparan babhan kimia mengenai outdoor ac
Mengganti ukuran pipa vennting blowdown pit dan menambahkan fan
Install M/V setelah bypass MOV Condensor LCV
Membuatkan Annunciator untuk common
Pembuatan roiof valve unutk chip filter shutoff valve sistem
Penambahan Annunciator alarm untuk CO Boiler stack gas
Install aux steam header press c/v di c/v cmd deviation
Buatkan pijakan di Mov tic header sea water
Tambah kanopi fan motor IDF supaya air hujan tidak masuk ke dalam motor, IDF
Install venting line pada pompa acid cleaning
Pembuatan diagram boiler konfisi start ip & Shutdown
Pembuangan air drain vassal di panjangin
pemasangan canopy di FDF dan IDF Motor
Modification burner firing gas COG (Aux Boiler)
Bypass Line vent gas 5th floor boiler
#2 bfwp faceplate di graphic main flow diagram agar bisa di buka
Modification Tray air conditioner at admin Building
Repair of Condensor vacuum pump Impeller
Fabrication & Install Pipe for discharge sump pump to drainage
Membuat form peminjaman
Pemasangan exhaus farn 2 unit di tools room turbin laintai 2
Memodifikasi trolly gas untuk mengelas dengan menambahkan pengikat
Buat Kanopi jendela turbin building lebih tertutup
Tambahkan Drain Line ke pit untuk PG Drain di sampling rack
Strainer BFWP diganti modifikasi seperti CCCW Strainer
Pasang Lampu di area menuju Vassal Tank Syphone
Penerapan program cara berkomunikasi efektif
Pencegahan Kerugian Perusahaan dengan cara correction cost terhadap invoice
Memudahkan pekerjaan membuka dan menutup manhole pada header BFG
mODIFICATION SUPPORT PLATE AT lp bYPASS SPRAY CONTROL VALVE #1 & #2
Pemasangan sump pump di area cable pit dekat admin
Modification cooling fan aux TR No 5
Memasang Filter pada lubang drain sampling rack system
Protection Sistem DCS
Penggantian Silica Analyzer BB ke merk silica analyzer kntec di demin plant
TOTAL
Atasan Panitia Panitia Rata-
NILAI JML (RP) KET. 1 2 Rata
6 30,000 69 69.00
7 20,000 55 55.00
7 20,000 55 55.00
6 30,000 65 65.00
6 30,000 62 62.00
6 30,000 63 63.00
6 30,000 62 62.00
7 20,000 55 55.00
6 30,000 62 62.00
7 20,000 59 59.00
6 30,000 62 62.00
7 20,000 59 59.00
7 20,000 30 30.00
6 30,000 60 60.00
6 30,000 60 60.00
6 30,000 60 60.00
6 30,000 62 62.00
5 50,000 74 74.00
7 20,000 50 50.00
6 30,000 65 65.00
7 20,000 50 50.00
7 20,000 51 51.00
7 20,000 51 51.00
7 20,000 45 45.00
6 30,000 60 60.00
7 20,000 45 45.00
7 20,000 55 55.00
7 20,000 53 53.00
6 30,000 67 67.00
7 20,000 46 46.00
6 30,000 60 60.00
6 30,000 62 62.00
6 30,000 61 61.00
6 30,000 60 60.00
6 30,000 66 66.00
6 30,000 60 60.00
950,000
z
REKAPITULA

NO NAMA UNIT KERJA GROUP


1 Nofdianto Facility Planning & Facility
2 Nofdianto Facility Planning & Facility
3 Adityo Fuad Ibrahim Safety planning & Facility
4 Sudrajat Mechanic Maintenance
5 Dicki Kapriadi Electric Maintenance
TOTAL

Operation 19
Mechanical 3
Electrical 2
I&C 3
Planning & facility 9
Procurement 0
HRD 0
Finance 0
Total 36
REKAPITULASI SUMBANG SARAN
Feb-20

JUDUL
Menyediakan Box & Pasir untuk TPS & OIL Storage
Membuat kotak penampung kebocoran HSD
Menyediakan pasangan socket di panel 3 phase
Improving #1 sampling rack drain line
Install Support for steam air heater ISO MOV #1 Boiler
TOTAL
Atasan Panitia Panitia Rata-
NILAI JML (RP) KET. 1 2 Rata
5 50,000 70 70.00
5 50,000 74 74.00
7 20,000 51 51.00
6 30,000 60 60.00
6 30,000 60 60.00
6 30,000 63 63.00
6 30,000 62 62.00
7 20,000 55 55.00
6 30,000 62 62.00
7 20,000 59 59.00
6 30,000 62 62.00
7 20,000 59 59.00
7 20,000 30 30.00
6 30,000 60 60.00
6 30,000 60 60.00
6 30,000 60 60.00
6 30,000 62 62.00
5 50,000 74 74.00
7 20,000 50 50.00
6 30,000 65 65.00
7 20,000 50 50.00
7 20,000 51 51.00
7 20,000 51 51.00
7 20,000 45 45.00
6 30,000 60 60.00
7 20,000 45 45.00
7 20,000 55 55.00
7 20,000 53 53.00
6 30,000 67 67.00
7 20,000 46 46.00
6 30,000 60 60.00
6 30,000 62 62.00
6 30,000 61 61.00
6 30,000 60 60.00
6 30,000 66 66.00
6 30,000 60 60.00
1,000,000
z
Nama January February March April May June July
Bambang Kurniawan
Group A
Firmanullah 1
Imam mahdi 1
M Yogi saputra 1
Agung nugroho
Ahmad satibi 1
Ridwan rizkiawan 1
Bagus firgiawan
Nuzuludin R 1
Group B
M Fajar bastian
Satibi setiawan
Rudi gunawan 1
Rochmat yuniarto 1
Muhammad sufandi
Depi niswan
Arief triasmei
Arif rahman hakim 1
Group C
Dana firlana
Syeprnaldi 1
Supriyadi
Zaenudin 1
Febri yayogi
Azhmi hermawan
Dhoni setiawan
Irfan maulana 3
Group D
Haerudin 1
Hari susanto
bayu sukma
ahmad alfian 1
Adi nuryadi
Rachmat nurhuda
Panji purbo laksono 1
Muhammad ilham
Zakky anshary
Andi Triantono
F.Fery Sembiring
Gindi nuansa
Maintenance
Sudrajat 1
Widhi SN 1
Dimas BS
Ulum
Diki
Sang sang
Syahrial
Gery uhono
Bayu S
Baginta
HR
Retno
Azis
Planning & Safety
Adityo Fuad I 1
Ahmad Zainudin 1
Alan Gunawan 1
Nofdianto 1
Bunyamin
Ilhamsyah 2
Feri Budiman 2
Rifqi 1
August Sept October NovemberDecember

You might also like