HAZARD DEFINITION AND DISCUSSIONS: In this clause efforts will be made to define

hazard. As is seen from the above, Hazard discussed above is with respect to health &

occupational Hazard. One thing is clear that exact definition of hazard changes from case to

case but main theme behind is the cause that has potential to bring out untoward situation!

1. In general term one can define Hazard as could be any  biological, chemical,

mechanical, environmental or physical agent has potential to cause harm or damage to

humans, other organisms, plant - machinery, asset or the environment in the absence of

its control. In other words, Hazard can be considered as a state with a set of conditions

of a system which together with other conditions in the environment, or in the

environment of the system will lead to an accident. For example H 2 leak from a turbo

generator, coming in contact with atmospheric air can cause fire/explosion near turbine

if it comes in contact fire or locally hot surface, so smoking is prohibited near that place.

2. In terms of industrial plants hazard can be defined as any condition produced by or in the

industry that may cause harm to property (plant – machinery, asset), human or

environment. As per HSE .gov.uk “A hazard is something (e.g. an object, a property of

a substance, a phenomenon or an activity) that can cause adverse effects”.

3. As per Center for chemical Process safety (CCPS) hazard is defined as “An inherent or

physical characteristics that have potential for causing damage to people, property or

environment, it is the combination of a hazardous material, an operating environment,

and certain unplanned event that could result an accident”.

4. As per ISO/IEC 51 or IEC 61508 hazard is defined as “ The potential source of harm”.

In IEC 61508 Harm has been defined as physical injury or damage to the health of

I/Page 1 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/
people either directly, or indirectly as a result of damage to property or to the

environment

5. In order to work as a team it is always recommended to identify and record all possible

hazards in the plant as well as at the work place. For such work identification it is better

to form a team comprising both experienced and fresh people. Experienced people are

familiar with the job and will help to identify the hazards, whereas fresh eyes may throw

light on new area of hazard. Following are the major points to be covered in hazard

identifications (ref: Canadian center for occupational health and safety--

CCOHS):

 All aspect of work  Look for foreseeable unusual

 Include all non routine activities (e.g. conditions

Maintenance, repair)  Include people “off site” (not regular)

 Accident or incident/near miss  Include assessment groups for

record different levels of risk

6. A few terms, normally encountered in connection with Plant hazard system study have

been given below:

 Accident: It is an undesired, unplanned (may not be unexpected always) event which

will result in specified level of loss (in terms of health, property, production, etc)

 Mishap: It stands for bad luck, misfortune etc. In terms of industry it could be an

accident which is associated with uncontrolled release of energy and toxic material

exposure.

 Near miss/incident is normally used in good sense meaning an event occurred, but it

involved very minor or no loss (in terms of health, property, production, etc)

 Safety: Freedom (or nearly freedom!) from accident/loss

7. Generally hazards are classified broadly as:


I/Page 2 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/
 Biological: Viruses, Bacteria,  Ergonomic: Repetitive movement

Animal, Plant  Physical : Radiation, Fire


 Chemical: Physical chemical toxic
 Psychological: Stress
property of the chemical
 Safety: Slipping etc.

8. When various hazards are identified, initially, it is better to study them carefully to

assign risk level associated with each of these hazards i.e. to rank them according to their

severity. Following are a few guidelines towards such activities (based on CCOHS):

 Product information/manufacturer’s  Expertise from Health and safety

data engineer (HSE)

 Past experience  Previous hazard reports (accident/near

 Applicable standards miss/incident) and hazard statistics

 Industrial codes and practices  Use any hazard check list is helpful

 Health and safety material about (e.g. EN1050)

hazard  Work environment

 Information from Govt. or reputed  Skill and experience of worker

organization  Systems being followed

 Test results  Range of foreseeable conditions

9. It is practice to identify the hazard control and follow up action as a part of Hazard

identification and preliminary hazard analysis (discussed in details in the next chapter).

In order to hazard control one has to look for safety interfaces also. So, following points

need to form a part of initial hazard study especially for industrial /process plants, so that

entire spectrum is well covered:

 Hazardous component identification

I/Page 3 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/
 Possible malfunction of equipment,  Operating procedure, regular test,

system including software maintenance diagnostic features,

 Safety interface including software  Safety related equipment, safe guard

 Operating condition and environment items,

constraints if any  Possible alternate approach if

 Available facilities & support possible & emergency procedure

equipment and support system

10. Listed below are some of the sources of Hazard encountered in industry.

 Sources and propagation of stored  Fire /explosion

energy in the form of Chemical,  Human error ( e.g. operating error)

Electrical, & Mechanical  Software error

 Mechanical moving parts  Noise of different forms

 Nuclear radiation  Toxic and corrosive liquids and gas

 Biological hazard ( bacterial growth)

11. Network security threat is another big hazard in modern day’s practice. For example,

Supervisory control and data acquisition (SCADA) the vital infrastructure support in

major industrial set ups nowadays faces great threat from security threats. Major security

threats come on account of

 Control Networking  In secured remote connections

 Standardization and open systems  Availability of public information to

hackers.

With this knowledge efforts will be made to find what is hazard analysis? Hazard analysis

uncovers the hazards exist in the workplace (in this case industrial plant) focusing on the

system/project. As discussed above, in hazard analysis risk (defined in next clause)

I/Page 4 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/
based decisions are taken to develop means to quantify, track, develop mitigation means

& control hazards, follow up action, verify effectiveness & communicate.

RISK DEFINITION: As discussed above risk is the likelihood that a hazard can cause

actual damage. In this case also efforts will be made to find some good definitions.

1. As per HSE.govt.UK risk can be defined as “A risk is the likelihood that a hazard will

actually cause its adverse effects, together with a measure of the effect. It is a two-part

concept and you have to have both parts to make sense of it”.

2. According to EPA “EPA considers risk to be the chance of harmful effects to human

health or to ecological systems resulting from exposure to an environmental stressor. A

Stressor is any physical, chemical or biological entity that can induce an adverse

response. Stressors may adversely affect specific natural resources or entire ecosystems

including plants and animals as well as the environment with which they interact.”

3. As per ISO guide 73(2009) Risk is the “effect of uncertainty on object.” With associated

notes, some of them are:

 Note 1: An effect is a deviation from the expected—positive and /or negative.

 Note 2: Objectives can have different aspects such as financial, health and safety, and

environmental goals and can apply at different levels such as strategic, organization-

wide project, product, and process.

 Note 3: Risk is often characterized by reference to potential events, consequences, or a

combination of these and how they can affect the achievement of objectives.

 Note 4: Risk is often expressed in terms of combination of the consequences of an event

(including changes in the circumstance) and associated likelihood of occurrence.

 Note 5: Uncertainty is the state, even partial, of deficiency of information related to,

understanding or knowledge of , an event, its consequence, or likelihood.

I/Page 5 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/
4. There is also another definition of risk as per ISO /IEC guide 51 / IEC61508 which is

rather straight forward. According to these, risk is “the combination of probability of

occurrence of harm and the severity of that harm.”

5. Risk can be conceived as a hazard level combined with likelihood of hazard leading to

an accident and dependent on latency of exposure. The definition will be clearer when

smoker example is considered. All smokers do not suffer from lung cancer but there is

high probability of getting exposed to the likelihood. Again the chances are increased for

the person smoking more cigarettes. Similarly a person exposed to asbestos dust, will

have a chance for Mesothelioma, and higher the exposure more will be chance of getting

affected.

RISK DISCUSSIONS: There are two kinds of risks; one is raw (inherent) risks which

represent the risk before taking any control or mitigation action. Second category risks

are the residual risks i.e. the risks which could be faced after putting in place controls or

mitigation actions (ref Fig 1.0-2). From clause 2.3, it has been found that risk is a

combination of likelihood of hazard, Severity, exposure time etc. In this discussion same

has been brought in to show interference of each factor so that various terms in

connection with risk assessment could be explained. Correct way of combining them is

normally unknown also parameters of each of them are not known. Through risk

assessment and analysis same is determined. Risk components are therefore Severity,

Latency (or exposure) period and Likelihood of Hazard occurrence and likelihood

hazard leads to an accident. Fig I/2.4-1 shows the four factors and their combination will

generate a new risk value.

I/Page 6 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/

Fig I/2.4-1 risk component combination

There are a few factors which affect the risk component some of them are:

 Hazard complexity  Scale

 Exposure  New vs old technology replacement

 Energy  New technology and their pace of

 Automation change

Under this clause short discussion on Risk frequency, categorization, assessment, etc

shall be highlighted (based on CCOHS, British standard), whereas details for all these

are available in subsequent discussions.

1. Risk frequency: This defines the likelihood of the risk i.e. in other words; it stands for

the probability of risk. There are a few categories and these are

 Very likely : at least once in six  Unlikely: may be once in life time

months  Very unlikely: May be 1%

 Likely: at least once a year

Typical examples are shown here. Risk frequency data, release data are available in HSE

(UK), OREDA, OGP etc. publications also.


I/Page 7 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/
2. Severity: It is loosely used to indicate the impact of risk i.e. consequence. These are

slightly harmful (e.g. superficial cut, minor cut etc.), harmful (e.g. burns, serious pains,

minor fracture) and extremely harmful (e.g. major fracture, amputation). There are some

other ways to categorize also. Such categorizations are listed below:

 Minor : Minor system damage  Critical: minor injury to personnel,

without causing injury fire or release of chemical to

 Major : e.g. low level exposure to environment

personnel, activates public alarm  Catastrophic: major injury, death big

leakage (e.g. Bhopal gas leak)

3. Risk level (Based on action and time): The level of risks are often categorized based on

the potential (harm refer clause no. 3.1.4 for further discussions with example). The

categories are termed as listed below:

 Very Low: These risks are acceptable may not need any action

 Low: No control may be necessary unless these are available at very low cost

 Medium: Suitable considerations shall be there to see if it risk can be lowered- where

applicable to a tolerable level within a defined time limit. However due considerations

shall be given for the additional cost for risk reduction. Whenever the risk is associated

with harmful consequence, it is necessary to make sure that risk reduction controls are

properly maintained.

 High: Good amount of effort is applied to reduce risk on an urgent basis within a defined

time frame. It is essential to give due considerations towards the choice amongst

suspending or restricting the activity or to apply interim control measure till the main

risk reduction control is implemented. Whenever the risk is associated with harmful

consequence, it is necessary to make sure that risk reduction controls are properly

maintained.
I/Page 8 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/
 Very high: unacceptable. Substantial improvements in risk reduction control measures

are necessary to reduce the risk to the acceptable level. Activities need to be halted until

risk reduction control is implemented. Otherwise, work shall remain prohibited.

 Risk associated with very harmful consequence need risk assessment & analysis.

 The above categorizations are qualitative in nature. For quantitative calculations one

may need to take the help of probability and associated software which are also from

various agencies for different applications (e.g. shell, DNV etc have proprietary software

for their use).

4. Control measure: Control measure, preferred actions are to climb up the hill as shown in

fig I/2.4.4-1 (based on Health and safety authority-www.hsa.ie/eng).

Fig I/2.4.4-1 Control measure for risk control

As shown in the drawing there are several steps listed below arranged in decreasing

order of preference:
I/Page 9 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/
 Elimination of hazard: Total elimination is not always possible but some time possible

e.g. if unleaded petrol is used attendants are not in the hazard of lead contamination

 Substitute: Sometimes to eliminate hazard particular material/ system for example is

vulnerable can be substituted by other. On account of health hazard DEHA is substituted

for hydrazine to scavenge oxygen from boiler water.

 Isolating: Isolating the hazard is achieved by restricting plant and equipment. For

example in case of hazardous area process transmitters use flame proof enclosure or use

IS circuit so that hazard does not reach electrical circuit or sufficient energy does not

reach the hazardous area

 Engineering control: By redesigning the process and put barrier. Machinery guard is an

example of the same.

 Administrative control: Adaptation of safe control practices and procedure through

appropriate training etc.

 Personal protective equipment: Gloves, helmet etc. are used towards this.

5. Risk Target: this is a term often found in connection with Plant Hazard analysis. A risk

target is measure that expresses the consequence of a risk in relevant terms of the project

and organization concerned.

6. Risk Analysis: As per IE 60300-3-9 Risk analysis is “systematic use of available

information to identify hazard and to estimate the risk to individuals, populations,

property or the environment.” So essentially risk analysis find, organize and categorize

sets of risks.

7. Risk Assessment: Risk assessment is one step further. This can be defined in terms of

the following basic activities:

 Identification of hazard  Find appropriate the way to control &

 Analysis and evaluation of risk mitigate hazard


I/Page 10 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/
The main aim of risk assessment is to remove hazard, or reduce the risk level by

adapting necessary control measures, to move towards safety. Importance of risk

assessment cannot be overestimated, because it provides a number of helpful things to

prevent loss of assets (here asset stands for personnel, plant machinery, property ,

environment all). Major advantage shall include but not limited to:

 Make personnel at all levels knowledgeable about loss of asset due to hazard

 It makes them aware of all possible potential hazards their likelihood of occurrence,

severity, level of risk etc.

 Identify risk level for each of personnel, asset, environment etc.

 Assess the existing control measures and gives new suggestions for change to protect

asset

 When done at early design stage (may be with little extra investment), then future

damages are saved to a great amount (e.g. good save for frequent loss of production,

and /or loss of property due to say fire, explosion and /or environmental protection).

 Categorization of risk and help to take appropriate control measure.

8. Risk assessment procedure is an elaborate process but mainly covers the following major

points. Detailed discussions on the same have been presented in clause 3 in chapter II.

 Hazard Identification  Actual and potential exposure of

 Evaluation of risk; Likelihood, personnel (latency, frequency,

severity and level of risk intensity)

 Standard operating conditions  Environmental impact

 Emergency situation (nonstandard  Design Engineering control

operation)  Documentation

 Review of all associated information

I/Page 11 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-
Analysis-and-Safety-Instrumentation-
Systems/Swapan-Basu/isbn-9780128037638/

I/Page 12 of 13

Plant hazard analysis and safety instrumentation system


http://store.elsevier.com/Plant-Hazard-Analysis-
and-Safety-Instrumentation-Systems/Swapan-
Basu/isbn-9780128037638/
9. Risk management: As per ISO guide 73, risk management stands for “coordinated activities to

direct and control an organization with regard to risk” defined above.