KOTHAGUDEM THERMAL POWER STATION, STAGE V

PULVERISED COAL GCV, SIEVE & COMBUSTIBLES ANALYSIS DATE: _________

% Bottom Ash & Fly Ash Combustibles on GCV on : Kcal/Kg (Design: 3030 Kcal/Kg)
% Unburnt in Bottom Ash % Unburnt in Fly Ash
<5% <1%
UNIT IX:

UNIT X:
CLASSIFIER SIEVE ANALYSIS on ___________
50 mesh 100 mesh 200 mesh
Classifier >99% >90% >70%
9

9
Unit IX
9
9
10
10
Unit X
10
10

SHIFT WISE GCV/MILLS IN SERVICE

Unit IX Unit X
1st Shift / /

2nd Shift / /

3rd Shift / /

UNIT–IX
PERIODICAL EQUIPMENT
CHANGEOVER REGISTER

UNIT–X
PERIODICAL EQUIPMENT
CHANGEOVER REGISTER
KTPS V STAGE
AE/SHIFT
WORK ALLOCATION REGISTER
MONTHLY SCHEDULE FOR EQUIPMENT CHANGEOVER

1st Wednesday CWPs & BCWPs

2nd Wednesday BFPs & CEPs

Vacuum Pump, Oil Vapour Exhaust Fan, Seal Steam


3rdWednesday Exhaust Blower, AC Seal Oil Pump, Bearing Chamber
Exhaust blower

th
Lube oil pumps of ID, FD, PA, APHs & HFO pump
4 Wednesday
(Note: LDO pump changeover during every Unit Startup)