You are on page 1of 1

INTRA-FORCE TECHNOLOGIES IFT

Construction Innovations

Project Pre-start Checklist (S&I)

Information to be made available prior to Design Works:

1. ACAD files : a. Engineer’s PT dwgs


b. Architect’s Concrete outline

2. Any Construction Details not documented in Engineer’s PT Dwgs

3. Construction Programme

4. Short-term Construction Programme – 3-week ‘Look-ahead’

5. Builder’s Site Staff Details

Unit 7/ 25 Howleys Road, Notting Hill Vic 3168, Australia


T: 03 9543 6377 F: 03 9543 7279 Email: info@intraforcetech.com.au
ABN: 20 150 091 160 ACN: 150 091 160

You might also like