TECHNICAL SUPPORT REQUEST Department* O2J Name* HUYNH VAN NHIEN

Content request* *: Compulsory

CFD Heatload Requested Date* 23-Dec-19


Visit jobsite/customer/seminar Equipment list / VRV xpress Requested finish Date* (Sale) 24-Dec-19

Technical question/analysis AC drawing (Basic) Job type New

Make materials AC drawing (Detail) EX JOB number : …………………
Others : ………………… Ventilation system Attachment : …………………

Project Information:

Pham Van Duc:


Project Name* VIVA SQUARE hoa và không dấu Project type*
Inquiry
Viết ✘New Renovate Other
Project Address Đồng Nai From* Design standard
Owner name LDG Application* : Villa
Consultant name : ………………………………………………………………………………………………………… Total floor number : …………………
Contractor name : ………………………………………………………………………………………………………… Typical Area (m2) : …………………
Dealer name : …………………………………………………………………………………………………………
AirCon solutions for
Status Construction start from (mm/yyyyy) :……………………………………
Commercial Center
Handover at (mm/yyyyy) :……………………………………

Design informaton

1) Conditions 2) Equipments*
Temperature :…………………. RA PA Vent fan
Relative humidity :…………………. SA VRV VAM, VKM
(Standard : Room Temp 25oC, 55% RH) Multi Control PAU
(Standard : Outside Temp 35oC)
3) Project direction 4) Height (floor to ceiling) 5) Heat gain
Direction :…………………. Direction :…………………. Person :………………….
(Standard : West for largest glass area direction) Equipments :………………….
6) Building Material:
Outer Wall: Thickness : mm. Roof: Thickness : mm.
Inner Wall: Thickness : mm. - Insulated: Thickness : mm.
Glass: Thickness : mm. Floor Thickness : mm.
(Standard : Clear Glass/ No Curtain/ Roof with Insulated 1" Thichness)

Information/comment

Other
`

<Techinical support answer> Feedback from request side


Quality (A B C D E)
PIC name: THANH DAO
Estimaled finish date: ………………… Speed (A B C D E)
JOB NUMBER: 19041
comment:
Checked by: …………………
Finish date: …………………
Attachement: ………………… V5
FY 19

NO. MONTH JOB-No. ENGINEERING REQUEST FROM DEPARTMENT


SUPPORT
1 19041 THANH DAO HUYNH VAN NHIEN O2J
PROJECT NAME APPLICATON STATUS RECEIVE
VIVA SQUARE Villa New 23-Dec-19