PROJECT MANAGEMENT CONSULTANCY FOR SHDP PHASE II DHARWAD CIRCLE

PWD-KARNATAKA
QUALITY ASSURANCE
SHDP

PROJECT MANAGEMENT CONSULTANCY FOR SHDP PHASE II


DHARWAD CIRCLE
QUALITY ASSURANCE DOC:C-033
Name of Division: Name of sub division:

Name of Road: Location:

Client: PIU-SHDP
INFRA SUPPORT ENGINEERING CONSULTANTS PVT.LTD
Consultant:
Contractor:

TEST FOR TACK/PRIME COAT SPRAYING RATE


(TRAY TEST)
As per MoRTH Clause 502 and Clause 503
Lab. Job No. Date Sampled

Test location Sampled by

Type of mix Date tested

Proposed use Tested by

Grade of bit. Station Represented

Area of tray Wt. of tray Wt. of tray with Wt. of mat. Spraying rate
T.No
(m) (gm) mat. (gm) (gm) Kg/10m2

Note: Specification Prime coat : 6-9 Kg/10 m2


Tack coat : 2.5 Kg/10 m2

Remarks: