Winding Resistance
EQA Group
Rev. No.: 00 Work Instruction For WINDING Doc. No: EQA-WI-23
Rev. Date: 01-01-2003 RESISTANCE Test Page No. 1 of 3
1. RECORD OF REVISIONS
Rev. Date Details Prepared Reviewed Approved
No. by by by
00 01.01.0 First Time issued for QMS Engineer SH AGM
3
2 SCOPE
The test procedure guides the EQA engineer in carrying out winding resistance measurement for
inductive winding of Generator, Motor, or Power Transformer.
3. INPUTS
Sr. No. Activity / Documents
3.1 Supply Requirements:
1. 1, 230 V, 50 Hz with switch facility rated at least 15A.
3.2 Instrument Requirements:
1. Digital low resistance ohm meter exclusive for inductive winding .
4. REFERENCE :
4.1 Manufacturer manual.
4.2 Earlier Test record.
6. PREREQUISITES
Sr. No. Activity
6.1 Ensure that the equipment under test is de-energised. For system equipment, ensure that the
maintenance engineer has taken the necessary permits and isolated the transformer.
6.2 Ensure that no parallel circuits are connected to the equipment under test and there are no
shorts. In the case of neutral grounded equipment, ensure disconnection of neutral if testing
is carried with scope DLRO ,for Biddle DLRO neutral disconnection is not required.
Ensure proper polarity of current and of potential leads.
Ensure disconnection of power cable to equipment before carrying the test.
(In some cases if the terminal box is compound filled or difficult to open or requires lot of
re-insulation after measurement, the resistance measurement can be done along with the
cables from the SWGR end ).
6.3 Interconnecting Transformers of Gas Insulated Sub-stations with SF6 to oil bushings are
tested through earth switches (QE3). In such cases, ensure that the earth switches are closed
and earthing strips removed.
6.4 Ensure the terminals are properly cleaned. Ensure current terminal is clamped properly.
Avoid potential leads connection on clamp bolts.
The Tata Power Company Ltd. EQA Group
Rev. No.: 00 Work Instruction For WINDING Doc. No: EQA-WI-23
Rev. Date: 01-01-2003 RESISTANCE Test Page No. 2 of 3
7. ACTIVITIES
Sr. No. Activity / Documents
7.1 Make and confirm the circuit connections as in figure-A.
7.2 Note down the winding temperature.
7.3 Switch on the ac supply to DLRO , Select proper range before switching on measurement
switch .
7.4 Record the winding resistance and convert resistance to 75 deg C.
R (234.5 75)
R75 t
( 234.5 t )
where Rt is the resistance measured at temperature tC.
7.5 Repeat the test on other phases and at other taps as required.
7.6 Discharge the winding after the test.
8. RECORDS
Sr. No. Activity / Documents
8.1 Relevant portion of test formats: EQA-FM-TR, EQA-FM-GR, EQA-FM-MO.
9. LIMITS
Sr. No. Activity / Documents
9.1 Deviation between phases: 2%.
Deviation with factory value (after temperature corrections): 3%.
P1 P2
C1 C2
- -
+ +
1Ø ac
supply
Potential
Measurement
Current
switch
DLRO
Fig A Winding Resistance of Motor / Generator / Transformer
C1 P1 P2 C2
C1 P1 P2 C2
Connection for Delta connected winding Connection for Star connected winding