You are on page 1of 3

CLIENT: Project at Vedanta LANJIGARH SITE

TPI: M/s BVIL


STRUCTURAL ERECTION CHECK LIST (COMPATIBALITY MODE)
S.NO Description of inspection Acceptance Criteria

COLUMNS
Review material test certificates/Manufacturer Test Review TC/MTC’s
certificates of all the structural members & bought out
1
items as per drawing.

2 Random Visual Inspection of Structural Columns before


Random visual check
erection &
As per ISO /Drg
Verification of mark No.
Review the civil clearance report of that particular site
3 before handling the structural mechanical erection jobs. Civil Handover Protocol

d)ECL(Established column line) + 5mm


4
e)ELP(Established level plane) + 5mm

After erection of structural columns full tightening of Torque values


5
double nuts with washers (Ensure locking of nuts)
Alignment of columns,
.Elevation: +/- 5mm.
a) Elevation, check with reference to civil reference
Verticality: 1 mm/ M for Column,
6 b) Verticality in both longitudinal and transversal
10 mm Max
direction,
Ensure that all the structural members are erected properly
as per grid wise.
Span check between columns
S= +.(P/10+6) S= Allowable span tolerance in mm
7
(check with measuring tape with 8kg load) P=Span in meters

Diagonal check
Allowable tolerance + 10 mm
D= S2+W2
8
S= Span, W=column to column distance

ROOF GIRDER
Random Visual inspection of roof girders to be carried out Random visual check
9
before erection with ref mark no. As per ISO/Drg
10 Torque values
Torquring check for roof girder assembly
11 Random hole to hole dimension check for roof girder end As per Drg
plate
After erection of roof girders and fixing of portal check
12 proper tightening of all nuts with washers As per Approved Specification

CRANE GIRDER

Marking of rail centre on crane girder (with centre punch)


13 AS per Drawing
before erection
Check the condition of girders connection bolts, nuts and
14 As per Approved Specification
washers.
Tolerance: + 5mm
15 Elevation of crane girder
Axis checking is to be carried out by Theodolite at every
12mtr with reference to the master girder axis in both Axis: + 5mm
16
corresponding rows

Span at every 2mtr distance at both the corresponding


rows S= Allowable span tolerance in mm
17
S= +.(P/10+6) P=Span in meters

Diagonal check at every 2 mtr distance at both the


corresponding rows Allowable tolerance + 10 mm
18
D= S2+W2
S= Span, W=Every 2 meter distance
Check girder to girder offset
19 As per Drawing
Random check the welding of CB plate with column post
20 and ensure that girders are properly fixed on the CB plate. As per drawing

Random Check of walkway plate bolting and erection


21 As per drawing
welding

RAILS
21 Check rail support clamp bolting As per drawing
22 Rail Elevation Tolerance: + 5mm
Axis checking is to be carried out by Theodolite at every
12mtr with reference to the master girder axis in both Axis: + 5mm
23
corresponding rows

Span at every 6 mtr distance at both the corresponding


rows S= Allowable span tolerance in mm
24
S= +.(P/10+6) P=Span in meters

25 Diagonal check at every 6mtr distance at both the Allowable tolerance + 10 mm


corresponding rows

D= S2+W2
S= Span, W=Every 6 meter distance
Check rail to rail offset and rail to rail gap
26 As per approved drawing

Check proper placement of bracings as per drawing grid


wise. Check Purlins, tie rods, sag rods, monitor post and
27 As per Drawing
other structural members are properly placed as per grid
wise or not.

Check the surface preparation, painting with the calibrated As per ISO Standard
Elcho meter. Before proceeding for paint check for
structural members, review the documents like surface
28
preparation and painting procedure, Paint batch TC’s
should be reviewed with the original.

Note: The above Tolerance limits are based on Standard codes and approved Drawings.