Structural Painting Report

This structural painting report documents an inspection of painting done on columns, beams, girders, and trusses. It records the temperature and relative humidity at the time of inspection. It includes a table to log the drawing number, girder number, and coating layers applied - including primer, intermediate coats, and two finish coats. The inspector notes whether the painting was accepted, accepted with remarks, or advised for rectification. The report is signed off by the contractor and inspectors from Bureau Veritas and Vedanta Limited.

Uploaded by

galadrial
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views4 pages

Structural Painting Report

This structural painting report documents an inspection of painting done on columns, beams, girders, and trusses. It records the temperature and relative humidity at the time of inspection. It includes a table to log the drawing number, girder number, and coating layers applied - including primer, intermediate coats, and two finish coats. The inspector notes whether the painting was accepted, accepted with remarks, or advised for rectification. The report is signed off by the contractor and inspectors from Bureau Veritas and Vedanta Limited.

Uploaded by

galadrial
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Vedanta Limited

Consultant :- Bureau Veritas (India) Private Limited Protocol No, :------------------------------


Area /Unit :- Date :------------------------------
Contractor :- M/s
Item Painting checked :- Column/Beam/Girders/Truss etc Painting Shade :-------------------------

STRUCTURAL PAINTING REPORT

TEMPERATURE :_________________________________________DEG.C

RELATIVE HUMIDITY :_____________________________________

DRAWING NO Girde No, PRIMER INTERMEDIATE FINISHE COAT-1 FINISHE COAT-2 FINAL REMARKS
SL.NO. TOUCH UP COAT DFT

Inspected and Accepted Inspected and Accepted with Remarks


Insppected and advised for Rectification

CONTRACTOR BVIL VL
F/M/6