You are on page 1of 1

Month: March Year: 2020

Name: Designation:
Staff No: Dept / Div / Project: Mechanical

Normal Hours OT Hours Hour Details Total Hours


Date Day
In Out In Out Task Activity N OT Task Activity N OT Task Activity N OT Task Activity N OT N OT
2020-03-01 Sunday
2020-03-02 Monday
2020-03-03 (Tuesday
2020-03-04 Wednesday
2020-03-05 Thursday
2020-03-06 Friday r
2020-03-07 Saturday
2020-03-08 Sunday
2020-03-09 Monday
2020-03-10 Tuesday
2020-03-11 Wednesday
2020-03-12 Thursday
2020-03-13 Friday
2020-03-14 Saturday
2020-03-15 Sunday
2020-03-16 Monday
2020-03-17 Tuesday
2020-03-18 Wednesday
2020-03-19 Thursday
2020-03-20 Friday
2020-03-21 Saturday
2020-03-22 Sunday
2020-03-23 Monday
2020-03-24 Tuesday
2020-03-25 Wednesday PLC Project -Mechanical Division's first Roll Call at PLC Project -Discuss with Veritas ID on the impacts PLC Project -Preparing calculation on grease PLC Project -Working on revised construction
08:58am during MCO. due to the additional Smokeing Room interceptor sizing. drawings fro Sanitary Plumbing System.
-Discuss with Veritas ID on the impacts in ELT Building -Preparing calculation on grease
due to the additional Smokeing Room in -Respond to Contractor's queries on interceptor sizing.
ELT Building. testing requirements for Sprinkler --Respond to Contractor's queries on
system. testing requirements for Hose Reel
system.
-PMC would like to change the
numbering format of all revised
construction drawings. this involves
contract matter and thus, have written to
the project managind division, airport to
seek for the way forward.

2020-03-26 Thursday PLC Project -Working on revised construction PLC Project -Respond to Contractor's queries on PLC Project -Reply to Ir. Kok's email regarding the PLC Project -Discuss with Veritas & Structure on the
drawings fro Sanitary Plumbing System, our construction drawings for Fire day which the Mechanical COW can placements of the Grease Interceptors.
e.g.planning on the placement of the Hydrant e.g. operation of purging and report to work during MCO period after Some of the Grease Interceptors are too
Grease Interceptors. normal mode, provision of pre- discussing with Ir. Yoga on current huge and need floor standing structure
screened filters, etc. status of ProjectSite. supports.
-Email Form required to be filled up by -Prepare list of our revised construction
Site Staffs as requested by the Minco drawings (requested by Veritas DC)
HQ HSE to Site for their action. which we have forwarded to them on 24
-Working on revised construction March 2020.
drawings fro Sanitary Plumbing System, -There are few queries required to be
e.g rearrange the equipment in clarified with the supplier of Grease
Greywater Pump Room No. 1 in order Interceptor (GI), e.g. max. size of GI that
to have sufficient space for the Grease can be suspended directly from floor
Interceptor installation. slab above, to confirm whether Total
Weight as mentioned in the Catalogue
include the weight of waste water, etc,
and thus, have forwarded the list to
Engineer for him to send to the Supplier.

2020-03-27 Friday PLC Project -Follow up with RE on their reply to site PLC Project -Attend Online-Meeting with iPMT, PMC PLC Project -Attend Online-Meeting with iPMT, PMC
staff details requested by HSE Mr. and Veritas to discuss regarding the and Veritas to discuss regarding the
Ganthan. issuance of our revised construction issuance of our revised construction
-Working on revised construction drawings. drawings.
drawings fro Sanitary Plumbing System, -Received call from Client, Puan -Modified the spreadsheet of our
e.g. to put all Grease Grease Rozilah requesting for the spreadsheet evaluation on VRF equipment based on
interceptors in Sub-basement Greywater of our evaluation on VRF equipment inputs required by the Client and
Pump Room as manay as possible proposed by the Contractor. emailed to them for their review.
based on our discussion with Architect
yesterday.

2020-03-28 Saturday
2020-03-29 Sunday
2020-03-30 Monday PLC Project -Review material submission by SunCon PLC Project -Conference call with SunCon, PLC Project -Answar call from Site Mechanical RE to
in PEDMS. Minconsult Electrical and SunCon's discuss on the items related to
iBMS Specialist to discuss the Mechanical listed in MoM for tomorrow
integration requirements from Tehcnical Coordination Meeting.
mechanical's aspects.

2020-03-31 Tuesday PLC Project Attend On-line Technical Coordination


Meeting with iPMT, Veritas, Minconsult
and Suncon from 9.30am to 1pm.

Grand Total: 0 0
Submitted By Approved By Verified By

Name: Name: Name:


Date: Date: Date: