MASTER LIST OF DELIEVERABLES
e 2 Electrical Equipment Location & Schematic Cable Routing with Sectional Details
e 2 Electrical Equipment Location & Schematic Cable Routing with Sectional Details at Ground floor
p 2 Location of UGT & Pump Room with Schematic Layout & Sectional Details at basement
p 2 Location of STP with Schematic Layout & Sectional Details at basement
p 2 Schematic for External Water Supply Looping Layout at ground floor
p 2 Schematic for External Stormwater Drainage Layout at ground floor
p 2 Schematic for External Sanitary Drainage Layout at ground floor-If applicable
p 2 Schematic Water Distribution System
p 2 Location for Solid Waste Management System at ground floor
p 2 Water Bodies Utility Room at 3rd podium
mep 3 Location of MEP Equipments with Schematic Layouts & Sectional Details at 3rd podium
mep 3 Coordinated External Services Layout at ground floor
mep 3 MEP Coordinated Layout at Floor Level
mep 3 MEP Coordinated Layout at Floor Level at ground floor
mep 3 MEP Coordinated Layout at Floor Level at 1st podium
mep 3 MEP Coordinated Layout at Floor Level at 2nd podium
mep 3 MEP Coordinated Layout at Floor Level at 3rd podium
mep 3 MEP Coordinated Services Layout at Ceiling Level
mep 3 MEP Coordinated Services Layout at ground Ceiling Level
mep 3 MEP Coordinated Services Layout at 1st podium Ceiling Level
mep 3 MEP Coordinated Services Layout at 2nd podium Ceiling Level
mep 3 MEP Coordinated Services Layout at 3rd podium Ceiling Level
Date
Received
Received
Received
Received
Received
Received
Incomplete
Incomplete
Received
Received
Received
Received
Not Receieved
Not Receieved
Not Receieved
Not Receieved
Received
Received
Received
Received
Received
Incomplete
Received
Received
Received
THE ICON BY RISLAND
AT THANE
MASTER LIST OF DELIEVERABLES
THE ICON BY RISLAND
AT THANE
MASTER LIST OF DELIEVERABLES
THE ICON BY RISLAND
AT THANE
MASTER LIST OF DELIEVERABLES
THE ICON BY RISLAND
AT THANE
MASTER LIST OF DELIEVERABLES
THE ICON BY RISLAND
AT THANE
MASTER LIST OF DELIEVERABLES
e 2 Electrical Equipment Location & Schematic Cable Routing with Sectional Details
e 2 Block Schematic for Electrical Distribution System
e 2 Block Schematic for ELV Systems (i.e. Fire Alarm, PA, Security, Voice, Data Etc.)
p 2 Location of OHT with Schematic Layout & Sectional Details at terrace floor
p 2 Schematic for External Water Supply Looping Layout at ground floor
p 2 Schematic for External Sanitary Drainage Layout at ground floor-If applicable
p 2 Schematic Water Distribution System
p 2 Location for Solid Waste Management System at ground floor
p 2 Location for Solar Water Heating at terrace floor
e 3 Location of Electrical Equipment & Cable Routing With Sectional Details at ground floor
e 3 Location of Electrical Equipment & Cable Routing With Sectional Details at podium-If applicable
mep 3 Location of MEP Equipments with Schematic Layouts & Sectional Details
mep 3 Location of MEP Equipments with Schematic Layouts & Sectional Details at ground floor
mep 3 Location of MEP Equipments with Schematic Layouts & Sectional Details at 1st podium
mep 3 Location of MEP Equipments with Schematic Layouts & Sectional Details at 2nd podium
mep 3 Location of MEP Equipments with Schematic Layouts & Sectional Details at 3rd podium
mep 3 Coordinated External Services Layout at ground floor
mep 3 MEP Coordinated Layout at Floor Level
mep 3 MEP Coordinated Layout at ground floor Level
mep 3 MEP Coordinated Layout at 1st podium Level
mep 3 MEP Coordinated Layout at 2nd podium Level
mep 3 MEP Coordinated Layout at 3rd podium Level
MEP Coordinated Layout at typical floor Level (4th to 6th, 8th to 11th, 13th to 16th, 18th to 21st,
mep 3
23rd to 30th)
mep 3 MEP Coordinated Layout at Refuse floor Level (7th, 12th, 17th, 22nd)
mep 3 MEP Coordinated Services Layout at Ceiling Level
mep 3 MEP Coordinated Services Layout at ground Ceiling Level
mep 3 MEP Coordinated Services Layout at 1st podium Ceiling Level
mep 3 MEP Coordinated Services Layout at 2nd podium Ceiling Level
mep 3 MEP Coordinated Services Layout at 3rd podium Ceiling Level
MEP Coordinated Services Layout at typical floor (4th to 6th, 8th to 11th, 13th to 16th, 18th to
mep 3
21st, 23rd to 30th) Ceiling Level
mep 3 MEP Coordinated Services Layout at Refuse floor (7th, 12th, 17th, 22nd) Ceiling Level
e 5 Location of Electrical Equipment & Cable Routing With Sectional Details at podium-If applicable
THE ICON BY RISLAND
AT THANE
MASTER LIST OF DELIEVERABLES
2
3
4
6
7
8
9
10
11
12
13
14
15
15
16
17
18
19
Activity
store room allocation to lift vendor
lift shaft handover with whitewash and electrical work, smoke window, I beam for lifting machines to lift vendor
material deleivery date for B2 wing 2 nos of lift
template installation
guide rail support installation
guide rail installation
machine installation in LMR
lift ELV cableing in shaft
lift cart bottom frame installation
Buffer installation
lift door frame installation
lift jams installation by civil agency
cutouts making for landing plate and service box in brick work
lift cart installation
rope installation
slow speed
testing and commissioning
Remark
lift material will require large space, better to be
given near respective lift shaft
dependent activity