Document Control
Title Environment, Health, Safety and Incident Reporting
Process Name Environment, Health, Safety and Incident Reporting
Sub Process Name Safety and Accident Reporting
Version:-
Table of Contents
Document Control.........................................................................................................................2
1. Description of Process and Business Objectives...............................................................4
2. Process flow.......................................................................................................................6
a. Safety Incident reporting....................................................................................................6
b. Safety Inspection Round:...................................................................................................6
3. Process Swimlane Diagram...............................................................................................7
4. Master Data Involved.........................................................................................................8
5. Previous process..............................................................................................................11
6. Frequency of the Process.................................................................................................11
7. Current System Used for the Process..............................................................................11
8. Output from the Process...................................................................................................11
9. Reports from the Process.................................................................................................11
10. References........................................................................................................................11
This document describes the existing (AS-IS) Safety and Accident process of MSRDC.
The process flow described in this document is based on various documents which are
mentioned in the ‘References’ section of this document. The detailed workflow of the
process is mentioned in ‘Process Flow’ Section of this document.
This ‘AS-IS’ business process document will form the basis and guideline for the
subsequent ‘To be solution mapping phase”.
The content of this document forms the basis and the guidelines for the subsequent
SRS Phase – To be document.
MSRDC and its SPVs intent to have Environment, Health and Safety process to be
applied for all Construction projects.
The contractors to follow Safety Plans for Safety at construction site which are to be in
compliance with IRC: SP: 55.
The Emergency Response Team (ERT) to start immediate rescue work and to inform
about the incident to the Safety Officer.
ERT to collect all the information on the cause/s of incident, impacts and measures that
have been applied.
The ERT team submits the report to Safety Officer. The Safety Officer to ensure the
completeness of information and in turn inform the Authority Engineer and SPV
(MSRDC).
The EPC contractor to ensure the compliance for EHS and to conduct regular Audit.
The EPC Contractor submits the Compliance and Audit reports to Authority Engineer
and SPV on periodic basis.
The Authority Engineer and SPV review the Compliance and Audit reports and instruct
the EPC contractor to take the required corrective measures.
The Contractor is to ensure safe conditions for the construction work and commuters.
The contractor will take care of unsafe conditions, lane closures, diversions, vehicle
breakdowns and accidents. The contractor to follow the relevant operating procedures
for removal of obstruction and debris. The procedures to conform to the provisions of
the contractor’s agreement with SPV (MSRDC), Applicable Laws, Applicable Permits
and Good Industry Practice.
The Contractor to maintain and operate a round-the-clock vehicle rescue post with one
mobile crane having the desired capacity to lift a truck and the rescue post to be located
at designated location. The Contractor to promptly remove any damaged vehicles and
debris from the Project to enable safe movement of traffic and to report all accidents to
the police forthwith.
At the end of each day, the Contractor will send Safety Incident Report to the Authority
Engineer. The report will state details of accidents and unusual occurrences on the
Project. The contractor will give a summary report at the end of the month.
The contractor to ensure compliance with Guidelines, Laws and Rules related to Safety
for the Health and Welfare of construction workers. The contract agreement it is
directed to follow the safety manual issued by NHAI.
2. Process flow
Sr.
No. Description Legacy Originator Dept.
system/Manual
1 Type of Incident Manual Safety Department
2 Various Causes Manual Safety Department
3 Work Zones Manual Maintenance Department
4 Safety Officer Manual Personnel Department
5 Standard Operating Manual Safety Department
Procedures and Checklists
Please provide the existing sample data in excel format for each master Data
5. Previous process
None
10. References