VERSOVA – BANDRA SEA LINK Project (VBSL)

Unit Test Script


UNIT TEST / INTEGRATION TEST SCRIPT

TEST SCRIPT: Project Creation & WBS Creation


MODULE: PS
PROCESS: Project Creation & WBS Creation
Scope: The Project Structure:
In the first instance, a structure of events must be created. This structure is called a Work Breakdown Structure (WBS). Each WBS is connected to
the one below it, but they can be placed beside one another to form a matrix, as shown in Elements of a Project. Collectively, they are called
‘Operative Projects’. A WBS can be copied from what is termed a ‘Template’ or ‘Standard Project, or from another Operative Project.

Owned By: Daniel premassis G Date Created: 29-04-2021


Tested By: Date Tested:
Document: Project Creation & WBS Creation

Change History:
Date Modified Modified By Brief Description of Change

Cross References

Document Description Document name LAN Path


Business Process Flow

This document can be utilized for unit testing, module testing, and integration testing documentation.
For the testing to be complete all issues occurred should be logged in this document, and solutions should be in place.

Page 1 of 6 4/29/2021 08:14:00 AM


Prepared by: ABM, itelligence
VERSOVA – BANDRA SEA LINK Project (VBSL)
Unit Test Script
UNIT TEST / INTEGRATION TEST SCRIPT

SECTION I: OVERVIEW
1.1 Scenario Objective/Description
MSRDC – For VBSL project, Firstly, you create the Project Definition. Then, each WBS is created independently and given a Level Number,
which determines where in the hierarchy it is placed. Each WBS carries lots of information, such as Organization, Dates, Special Settings,
Project Type, who is responsible etc. All of this is discussed in detail later.
VBSL project considering Schedule – H for EPC work. There are other projects to be created for other than EPC work like Authority Engineer
Work, System Integrator Work etc.

1.2 Functions tested


Project and WBS hierarchy created.

Organizational Data:

Company Code 2000 Plant 2000 Sales Organization <<Optional>>


Controlling Area 2000 Purchasing Org. <<Optional>> Division <<Optional>>
Operating Concern <<Optional>> Purchasing Group <<Optional>> Distribution Channel <<Optional>>
Chart of Accounts VBSL Storage Location <<Optional>> Shipping point <<Optional>>

1.3 Master Data

Page 2 of 6 4/29/2021 08:14:00 AM


Prepared by: ABM, itelligence
VERSOVA – BANDRA SEA LINK Project (VBSL)
Unit Test Script
UNIT TEST / INTEGRATION TEST SCRIPT

1.4 Prerequisites
WBS hierarchy should be ready in the form of Schedule H.

1.5 Acceptance Criteria/Key Success Factors


Successfully created the Project and WBS hierarchy .

2. STEPS
No. BUSINESS PROCESS STEPS T-CODE/- INPUT DATA / SPECIAL OUTPUT DATA / RESULT TESTER / TEAM / OK /
PROGRAM INFORMATION ROLE ERROR
010 Create Project definition CJ20N VBCO PS

020 Please select the following PS


Input project name VBCO
 Create- project
VBSL Project Profile
 Project profile
Save.
030 Open Project CJ20N VBCO PS

Click on overview-Basic Data Tab VBCO.RW


VBCO.MB
Enter the schedule H, hierarchy as required. VBCO.OW

Click on responsibilities Tab

Enter person responsible Engg Team

Click on overview Data Tab

Page 3 of 6 4/29/2021 08:14:00 AM


Prepared by: ABM, itelligence
VERSOVA – BANDRA SEA LINK Project (VBSL)
Unit Test Script
UNIT TEST / INTEGRATION TEST SCRIPT

No. BUSINESS PROCESS STEPS T-CODE/- INPUT DATA / SPECIAL OUTPUT DATA / RESULT TESTER / TEAM / OK /
PROGRAM INFORMATION ROLE ERROR
Select check box
PE Planning Element
ACC act Account assignment on
requirement
Save.

040 Conclude test and report results Off-line PS OK

3. ERROR REPORT

Enter error messages and notes, and/or attach screen dumps at end of document.
Note:
Category: 1 = Master Data Change, 2 = Configuration Correction, 3 = Bug Correction, 4 = Other
Priority: 1 = Serious show stopper, 2 = Need modification but not immediate,
3 = Cosmetic change

Step# Detailed Description of Errors/Functional Issue Category Priority

4. ERROR RESOLUTION
Step# Action taken Action taken Resolution Status
by date
O = Open
R = Resolved

Page 4 of 6 4/29/2021 08:14:00 AM


Prepared by: ABM, itelligence
VERSOVA – BANDRA SEA LINK Project (VBSL)
Unit Test Script
UNIT TEST / INTEGRATION TEST SCRIPT

Page 5 of 6 4/29/2021 08:14:00 AM


Prepared by: ABM, itelligence
VERSOVA – BANDRA SEA LINK Project (VBSL)
Unit Test Script
UNIT TEST / INTEGRATION TEST SCRIPT

5. TECHNICAL SIGNOFF
Date Person Module Signature Comments

6. BUSINESS SIGNOFF
Date Person - USER Department Signature Comments