Document Control
Version
Table of Contents
Abbreviations:
Initials Description
RFI Request for Inspection
QS Quantity Surveyor
This document describes the proposed (To-Be) Contractor Empanelment for EPC process of
MSRDC. The process flow described in this document is based on ‘AS-IS’ documents. The
detailed workflow of the To-Be process is mentioned in ‘Process Flow’ Section of this document.
The content of this document forms the basis for the system configuration and testing phase.
For the VBSL project, MSRDC – EPC will initiate the proposal for required material supplier /
contractor in SAP system. Authority Engineer’s team will validate the necessary documents, do
the factory inspection and forward the recommendation letter to MSRDC. On confirmation of
MSRDC’s Engineerring Team, the empanelment of the contractor will be confimred to the AE &
EPC.
2 AE’s Team checks the required AE’s Quality Engineer OpenText ZVEN_ROC
documents, Inspects the Contractor’s will check the necessary
Factory and Prepares the Site documents and confirm
Inspection Report. to EPC for Factory
Inspection.
The Same Factory Inspection report Factory Inspection will be SAP FIORI
has been submitted to MSRDC along done manually and
with all document details for Inspection report will be
Approval. uploaded in SAP.
3 Proposal’s file is physically forwarded SAP’s workflow will get SAP FIORI
for Approvals. triggered on updating the
Factory Inspection report
for approval.
4 Resident Engineer approves the On confirmation from SAP FIORI
proposal, and the same proposal is AE’s Resident Engineer,
forwarded to MSRDC’s Engineering next workflow will be
department along with Factory initiated through SAP to
Inspection report. MSRDC’s EE for
Contractor approval.
5. Gap Analysis
Business Partner Category : Vendors are categorized according to requirements and some of
the vendors having similar characteristics are grouped together and placed in one category.
IMG Path: SPRO → Cross Application → SAP Business Partner → Basic Setting → Business
Partner Role → Define BP Role Category groups
Sr. F/R/I/C/E/
Object No. Object Type Description FS Ref.*
No W**
1 MM_C_53 Enhancement Vendor File Initiation E
2 MM_W_54 Workflow Vendor File approval W
3 MM_C_55 Enhancement Recommendation Letter Form E
4 MM_F_56 Form Recommendation Letter F
5 MM_W_57 Workflow Proposal Approval with W
Recommendation Letter
6 Enhancement Vendor Approval E
MM_C_58
7 Workflow Vendor Approval W
MM_C_58
10. Reports
Sr. No. Report Description Format Standard Report SAP Transaction Code
Available Available
1. EPC’s Contractor No Yes ZEPC_CONT (MKVZ)
Status
2. EPC’s Source List No No ZEPC_SOC
City City
Account group Grouping of Contractor / supplier
Search term Search term
11. Assumptions