You are on page 1of 2

Atlas Copco Underground drill rigs

Boom positioning
BUT 45 with control system RCS 5

Preparations
Diesel engine must be running.
See Driving instruction Hydraulic pressure switch must be in position ON.

Boom levers Activate boom with buttons


Start control system (1) on operator’s panel (2)

1 2
RCS
1 0

1250033863
1 1

0 +
T

-
0

Positioning
Left lever Right lever

Left lever, slide button Right lever + push button


Atlas Copco Underground drill rigs
Boom positioning
BUT 45 with control system RCS 5

After positioning
Left lever Right lever
Turn off control system (3)

3
1 RCS 0
1 1

T
0 -
0
+

CAUTION! Turn off the hydraulic pressure switch after boom positioning.

9852 3338 01

Atlas Copco Rock Drills AB


ÖREBRO, Sweden
© Atlas Copco Rock Drills AB, 2013. All rights reserved

You might also like