Atlas Copco Underground drill rigs

Positioning unit
Simba M2 C, M3 C/L3 C, M4 C and M2/M3/M4 C-ITH

Preparations
Diesel engine must be running.
See Driving instruction Hydraulic pressure switch must be in position ON.

Start control system (1) 3 Activate boom with button


on operator’s panel (3)
Left lever
1
Right lever
RCS
1 1 0 1

0 T
0

2
+ -

Activate operator panel with button


on operator’s panel (2)

Positioning left
Left lever Left lever + push button

Left lever + push button Right lever + push button

Llll
Atlas Copco Underground drill rigs
Positioning unit
Simba M2 C, M3 C/L3 C, M4 C and M2/M3/M4 C-ITH

Positioning right
Right lever Right lever + push button

After positioning
Turn off control system (4)

4
RCS
1 1 0 1

0 +
T

-
0

CAUTION! Turn off the hydraulic pressure switch after boom positioning.
9852 2083 01

Atlas Copco Rock Drills AB


ÖREBRO, Sweden
© Atlas Copco Rock Drills AB, 2007. All rights reserved