You are on page 1of 1

Nama : Moch Bima Awwaludin

Course : TPU IV Charlie

NIT : 30418062

Excessive Cabin Pressure Leakage

*Checklist after Inspection about areas for excessive leakage while the airplane BOEING 737

N PROCEDURE ENGINEER INSPECTOR


O INSPECTION INSPECTION
1. Verify that the EE cooling automatic flow
control valve is closed properly.
Some EE valves close at approximately 2.5 ±
0.5 psid. Some EE valves close at
approximately 0.9 ± 0.5 psid.
2. Verify that the bilge drains located along the
bottom centerline of the airplane are
closed properly. The bilge drain valves close
at approximately 2.0 psid.
3. Check all door and hatch seals for leakage.
4. Check the flight deck windows for leakage.
5. Check the forward outflow valve for leakage.
6. Check the cabin pressure outflow valve seal
for leakage.
7. Check the cabin pressure safety relief valves
for leakage
8. Check the cabin pressure negative relief valve
seal for leakage.
9. Check the water service panel seals for
leakage.
10. Check all air conditioning and APU duct
seals at pressure bulkhead penetrations
(located in the A/C bay, aft pressure dome,
right rear wheel well, and forward pack
bays) for leakage.
11. Check the structure in the forward and aft
wheel wells for leakage.
12. Check the control cable seals in pressure
bulkhead penetrations for excessive
leakage.

You might also like