Professional Documents
Culture Documents
HAL37093
• A second up-logging pass is made.
• An optional third logging pass can be made after torque is Halliburton Free Point log in 4 1/2-in. drill pipe in a 14,000-ft
applied and released. The stretch and torque logging passes are (4,267-m) horizontal well. With a one-trip operation, the HFPT,
compared to the base pass. tractored downhole, quickly and accurately identifies free versus
stuck pipe in 2-ft increments.
• By comparing these measurements, the tool generates a
continuous log that quickly and precisely identifies free, partial, Back-Off and Severing Services
and stuck areas in 2-foot increments. • String shot and back off
Capabilities • Jet cutters
Free-Point Determination • Chemical cutters
springs to set
• Real-time operations and 24/7 satellite communications
Locations
3 in.
7.62 cm
© 2013 Halliburton. All rights reserved. Sales of Halliburton products and services will be in accord solely with the terms and conditions contained in the
contract between Halliburton and the customer that is applicable to the sale. H09115 10/13
www.halliburton.com