You are on page 1of 48

Project: Rehabilitation of Paniqui - Moncada Via Ventinilla Provincial Road

Location: Brgy. Ventinilla, Paniqui, Tarlac


Date Started: November 22, 2019.
Project Duration: 133 C.D.
Period Covered: November 22 - January 31, 2020
NOVEMBER DECEMBER
22-30 1-31
F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T
ITEM NO. OF % WT. AS OF
DESCRIPTION QUANTITY UNIT UNIT COST BID AMOUNT % WT. WK.1 WK.2 WK.3 WK.4 WK.5

00
NO. DAYS THIS DATE
I EARTHWORKS

100(3a) Individual Removal of Tress,


Small (150-300mm Ø)
9.00 each ₱ 1,303.22 ₱ 11,728.96 0.08%
2 As Per Plan
0.04
00 0.04
0 Actual
0.04
00 0.04

100(3b) Individual Removal of Tress,


Small (301-500mm Ø)
4.00 each ₱ 2,853.08 ₱ 11,412.32 0.07%
2 As Per Plan
0.035
00 0.035
0 Actual
0.035
00 0.035

100(3d) Individual Removal of Tress,


Small (701-900mm Ø)
1.00 each ₱ 7,469.28 ₱ 7,469.28 0.05%
2 As Per Plan
0.025
00 0.025
0

2
Actual

As Per Plan
0.025
00 0.025

100(4) Individual Removal of Tress, 2.00 each ₱ 15,263.56 ₱ 30,527.12 0.20%


0.1 0.1
Large (Above 900mm Ø)
0 Actual
0.1
00000 0.1

100(1) Removal of Structure and


Obstruction
1.00 l.s ₱ 66,844.82 ₱ 66,844.82 0.43%
5 As Per Plan
00000 0.43
0 Actual
000000000000000000000000000
0.086

100(3a)
Removal of Dilapidated
Concrete Pavement
4563.00 sq.m ₱ 291.52 ₱ 1,330,191.83 8.62%
53 As Per Plan
000000000000000000000000000
0.651 1.138 1.138 1.138
0 Actual
###
###
###
###
###
###
###
###
0.762
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 1.334 1.334 1.334

102 Roadway Excavation 599.00 cu.m ₱ 83.95 ₱ 50,285.97 0.33%


63

0
As Per Plan

Actual
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 0.037 0.037 0.037

0.056 0.056 0.056


40 As Per Plan
103(1) Structure Excavation 156.00 cu.m ₱ 288.17 ₱ 44,954.55 0.29%
0 Actual

15 As Per Plan
103 (6) Pipe Culvert & Drain 28.00 cu.m ₱ 158.68 ₱ 4,442.94 0.03%
Excavation
0 Actual
00000000000
104 Embankment 1013.00 cu.m ₱ 416.51 ₱ 421,924.23 2.73%
58 As Per Plan
00000000000 0.094 0.329
0 Actual
000000000000000000000 0.019 0.675

105(1b) Subgrade Preparation 9240.00 sq.m ₱ 17.87 ₱ 165,127.03 1.07%


96

0
As Per Plan

Actual
000000000000000000000
0.056 0.078 0.078

0.05 0.07 0.07


II SUBBASE COURSE
0000000000000000000
200 Aggregate Sub-base Course 2783.00 cu.m ₱ 901.03 ₱ 2,507,572.87 16.25%
119

0
As Per Plan

Actual
0000000000000000000
0.410 0.956 0.956

0.643 1.501 1.501


III CONCRETE PAVEMENT

311 PCCP 6958.88 sq.m ₱ 1,371.81 ₱ 9,546,271.62 61.87%


76

0
As Per Plan

Actual
0000000000
0.444 0.296
IV REINF. STEEL / STRUCTURAL
CONCRETE
18 As Per Plan
404 Reinforcing Steel 2122.00 kgs. ₱ 84.38 ₱ 179,045.11 1.16%
0 Actual

20 As Per Plan
405 Structural Concrete 19.26 cu.m ₱ 11,228.50 ₱ 216,260.94 1.40%
0 Actual
DRAINAGE & SLOPE
V PROTECTION
10 As Per Plan
500(1)a1 RCPC, 610mm Ø 2.00 l.m ₱ 4,924.90 ₱ 9,849.79 0.06%
0 Actual

12 As Per Plan
500(1)a4 RCPC, 1070mm Ø 4.00 l.m ₱ 6,515.68 ₱ 26,062.71 0.17%
0 Actual

VI ROAD SIGNS

6 As Per Plan
605(3) Informative Sign, Rectangle 1.00 unit ₱ 16,717.31 ₱ 16,717.31 0.11%
0 Actual

6 As Per Plan
605 Warning Sign, Diamond 4.00 unit ₱ 7,562.51 ₱ 30,250.05 0.20%
0 Actual

5 As Per Plan
612(1) Reflectorized Thermoplastic 248.82 l.m ₱ 1,116.90 ₱ 277,905.98 1.80%
Pavement Markings
0 Actual

VII
FACILITIES FOR THE
ENGINEER
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
A.1.1(8) Provision of Field Office for
the Engineer (Rental Basis)
5.00 mo. ₱ 5,667.62 ₱ 28,338.09 0.18%
133
###
###
###
###
###
As Per Plan
###
###
###
###
###
###
###
###
0.004
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.009
###
###
###
###
### 0.009 0.009 0.009

Provision of
0

3
000
Actual

As Per Plan
0.003 0.008 0.008 0.008 0.008

Furnitures/Fixtures, Equip. 0.86


A.1.1(11) and Appliances for the Field 1.00 l.s ₱ 132,580.96 ₱ 132,580.96 0.86%
Office for the Engineer 0 Actual

VIII OTHER GENERAL


REQUIREMENTS
00
B-5 Project Billboard 2.00 unit ₱ 6,296.84 ₱ 12,593.67 0.08%
2
00
As Per Plan
0.08
0
###
###
###
Actual
###
###
###
###
###
###
###
0.082
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
B-7 Occupational Safety and
Health Program 1.00 l.s ₱ 100,295.27 ₱ 100,295.27 0.65%
133
###
###
###
###
As Per Plan
###
###
###
###
###
###
0.015
###
###
###
###
###
###
###
###
###
###
###
0.034
###
###
###
###
###
###
###
###
###
###
###
### 0.034 0.034 0.034
0
###
Actual
###
###
###
###
###
###
###
0.005
###
###
###
###
###
###
###
###
###
###
###
0.013
###
###
###
###
###
###
###
###
###
###
###
### 0.013 0.013 0.013

B-8 Traffic Management 1.00 l.s ₱ 80,623.33 ₱ 80,623.33 0.52%


131
###
###
As Per Plan
###
###
###
###
###
###
0.004
###
###
###
###
###
###
###
###
###
###
###
0.028
###
###
###
###
###
###
###
###
###
###
###
### 0.028 0.028 0.028
0
000
Actual
0.001 0.009 0.009 0.009 0.009

B-9 Mobilization/Demobilization 1.00 l.s ₱ 120,273.25 ₱ 120,273.25 0.78%


7
000
As Per Plan
0.334

₱ 15,429,550.00 100.00%
0
0
00
Actual

00000000000000
0.39
000000000000000000000000000000000000000000000000
0
WEEKLY PROJECTION 1.50% 1.35% 1.71% 2.37% 2.61%
ACC. WEEKLY PROJECTION 1% 3% 5% 7% 10%
AS PLAN
AS PLAN
MONTHLY PROJECTION 9.55%
ACC. MONTHLY PROJECTION 9.55%
WEEKLY ACTUAL PROJECTION 0.58% 1.32% 2.11% 3.63% 3.96%
ACC. WEEKLY ACTUAL PROJECTION 1% 2% 4% 8% 12%
ACTUAL
MONTHLY ACTUAL PROJECTION 11.61%
ACC. MONTHLY ACTUAL PROJECTION 11.61%

Prepared by:

JESUS HIPOLITO
HIMULICO CONSTRUCTION & SUPPLY CORPORATION
CONTRACTOR
JANUARY
1-31
W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W
WK.6 WK.7 WK.8 WK.9 WK.10 WK.11 WK.12 W

00

00000000000000000000000000
000000 00000000000000
1.138 1.138 1.138 1.138

##
###
###
###
###
###
1.144
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
1.047
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 1.165 0.499

###
###
###
###
###
0.037
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.037
###
###
###
###
###
###
###
###
###
###
###
###
###
### 0.037 0.037 0.037 0.037

0.048
###
###
###
###
###
0.034
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.032
###
###
###
### 0.022 0.014 0.010

0.051 0.051 0.051 0.051 0

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.008 0.014 0.008

00000000000000000000000000000000000000000000000
000000 000000000000000000000000000000
0.329 0.329 0.329 0.329 0.329 0.329 0.329

00000000000000000000000000000000000000000000000000
0.579 0.347 0.270 0.185 0.122 0.087

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0###
0.078
0###
0.078
###
###
###
###
###
###
###
###
###
###
###
###
###
### 0.078 0.078 0.078 0.078 0.078 0

0.06 0.189 0.295 0.154 0.049 0.035


00000000000000000000000000000000000000000000000000
000000 000000000000000000000000000000
0.956 0.956 0.956 0.956 0.956 0.956 0.956 0

1.286 2.097 2.920 1.501 0.438 0.313


000000000000000000000000000000000
000000000000000000000000000000 1.628 5.699 5.699 5.699 5.699 5

4.074 7.13 5.263 3.863 2.759


000000000000000000
0.129 0.451 0.451 0.129

00000000000000000000
0.49 0.49 0.42

###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.018
###
###
###
### 0.042

000000000000
0.024 0.04

00000000
0.043 0.099 0.028

0.063 0.106

##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
######
0.009
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.009
###
###
###
###
###
###
###
###
###
###
###
### 0.009 0.009 0.009 0.009 0.009 0

0.007 0.011 0.015 0.012 0.010 0.007

00
0.687
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 0 0 0 0 0 0 0 0 0 0 0 0 0###
0.034
0###
###
###
0.034
###
###
###
###
###
###
###
###
###
###
###
### 0.034 0.034 0.034 0.034 0.034 0

##
###
###
###
###
###
###
###
0.011
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.059
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.097
###
### 0.061 0.034 0.024

###
###
###
###
###
### 0 0 0 0 0 0 0 0 0 0 0 0 0###
0.028
0###
###
###
0.028
###
###
###
###
###
###
###
###
###
###
###
### 0.028 0.028 0.028 0.028 0.028 0

0.008 0.055 0.091 0.055 0.028 0.020

0
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
000
2.61% 2.61% 4.24% 8.56% 8.32% 8.20% 7.73% 6
12% 15% 19% 27.57% 36% 44% 52% 5
FEBRUARY MARCH APRIL
1-29 1-31 1-2
TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH
WK.13 WK.14 WK.15 WK.16 WK.17 WK.18 WK.19 WK.20

##
###
###
###
###
###
###
###
###
0.051 0.036

0000000000000000000000000
0.078 0.078 0.078 0.078

00000000000000000000000000000000000000000000000000
0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.546

0000000000000000000000000000000000000000000
5.699 5.699 5.699 5.699 5.699 5.699 3.256

000000
0.11

000000
0.2

00000
0.36 1.44

##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.005

##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.020

##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.016

0000
0.446

0
00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
0
6.86% 6.84% 6.80% 6.80% 6.73% 6.73% 4.95% 2.47%
59% 66% 72% 79% 86% 93% 97.53% 100%
27.18% 14.15%
85.85% 100.00%
Project: Rehabilitation of Paniqui - Moncada Via Ventinilla Provincial Road
Location: Brgy. Ventinilla, Paniqui, Tarlac
Date Started: November 22, 2019.
Project Duration: 133 C.D.
Period Covered: November 22 - January 31, 2020
NOVEMBER DECEMBER JANUARY
22-30 1-31 1-31
F SSUM TWTHF SSUM TWTHF SSUM TWTHF SSUM TWTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T
NO. OF % WT. AS OF THIS WK.1

###
###
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST BID AMOUNT % WT. WK.2 WK.3 WK.4 WK.5 WK.6 WK.7 WK.8 WK.9 W
DAYS DATE
I EARTHWORKS

###
###
2 As Per Plan
Individual Removal of Tress, Small (150- 0.04 0.04
100(3a) 9.00 each ₱ 1,303.22 ₱ 11,728.96 0.08%
300mm Ø)

###
###
0 Actual
0.04 0.04

###
###
2 As Per Plan
Individual Removal of Tress, Small (301- 0.035 0.035
100(3b) 500mm Ø) 4.00 each ₱ 2,853.08 ₱ 11,412.32 0.07%

###
###
0 Actual
0.035 0.035

###
###
2 As Per Plan
Individual Removal of Tress, Small (701- 0.025 0.025
100(3d) 900mm Ø) 1.00 each ₱ 7,469.28 ₱ 7,469.28 0.05%

###
###
0 Actual
0.025 0.025

###
###
2 As Per Plan
Individual Removal of Tress, Large (Above 0.1 0.1
100(4) 2.00 each ₱ 15,263.56 ₱ 30,527.12 0.20%
900mm Ø)

###
###
###
###
###
0 Actual
0.1 0.1

###
###
###
###
###
5 As Per Plan
0.43
100(1) Removal of Structure and Obstruction 1.00 l.s ₱ 66,844.82 ₱ 66,844.82 0.43%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.086

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
53 As Per Plan
Removal of Dilapidated Concrete 0.651 1.138 1.138 1.138 1.138 1.138 1.138 1.138
100(3a) 4563.00 sq.m ₱ 291.52 ₱ 1,330,191.83 8.62%
Pavement

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.762 1.334 1.334 1.334 1.144 1.047 1.165 0.499

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
63 As Per Plan
0.037 0.037 0.037 0.037 0.037 0.037 0.037 0
102 Roadway Excavation 599.00 cu.m ₱ 83.95 ₱ 50,285.97 0.33%

###
###
###
###
###
###
###
###
###
0 Actual
0.056 0.056 0.056 0.048 0.034 0.032 0.022 0
40 As Per Plan
0.051 0
103(1) Structure Excavation 156.00 cu.m ₱ 288.17 ₱ 44,954.55 0.29%

###
###
###
###
###
###
0 Actual

15 As Per Plan
0.008 0
103 (6) Pipe Culvert & Drain Excavation 28.00 cu.m ₱ 158.68 ₱ 4,442.94 0.03%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
58 As Per Plan
0.094 0.329 0.329 0.329 0.329 0.329 0
104 Embankment 1013.00 cu.m ₱ 416.51 ₱ 421,924.23 2.73%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.019 0.675 0.579 0.347 0.270 0.185 0

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
96 As Per Plan
0.056 0.078 0.078 0.078 0.078 0.078 0.078 0
105(1b) Subgrade Preparation 9240.00 sq.m ₱ 17.87 ₱ 165,127.03 1.07%
0 Actual

###
###
###
###
###
###
###
###
###
###
0.05

###
###
###
###
###
###
###
0.07

###
###
###
###
###
###
###
0.07

###
###
###
###
###
###
###
0.06

###
###
###
###
###
###
###
0.189

###
###
###
###
###
###
###
0.295

###
###
0.154 0
II SUBBASE COURSE

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
119 As Per Plan
0.410 0.956 0.956 0.956 0.956 0.956 0.956 0
200 Aggregate Sub-base Course 2783.00 cu.m ₱ 901.03 ₱ 2,507,572.87 16.25%
0 Actual
0.643 1.501 1.501 1.286

###
###
2.097

###
###
###
###
###
###
###
2.920

###
###
1.501 0
III CONCRETE PAVEMENT

###
###
###
###
###
###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
76 As Per Plan
1.628 5.699 5
311 PCCP 6958.88 sq.m ₱ 1,371.81 ₱ 9,546,271.62 61.87%
0 Actual
0.444 0.296 4.074

###
###
7.13

###
###
5.263 3
IV REINF. STEEL / STRUCTURAL CONCRETE

18 As Per Plan
0.129 0
404 Reinforcing Steel 2122.00 kgs. ₱ 84.38 ₱ 179,045.11 1.16%

###
###
0 Actual

20 As Per Plan
0
405 Structural Concrete 19.26 cu.m ₱ 11,228.50 ₱ 216,260.94 1.40%
0 Actual

500(1)a1
DRAINAGE & SLOPE PROTECTION

RCPC, 610mm Ø 2.00 l.m ₱ 4,924.90 ₱ 9,849.79 0.06%


10 As Per Plan
###
###
###
###
###
###
###
###
###
### 0.018 0

###
###
###
###
###
0 Actual
0.024 0

###
###
###
###
###
12 As Per Plan
0.043 0
500(1)a4 RCPC, 1070mm Ø 4.00 l.m ₱ 6,515.68 ₱ 26,062.71 0.17%
0 Actual
0.063 0
VI ROAD SIGNS

6 As Per Plan
605(3) Informative Sign, Rectangle 1.00 unit ₱ 16,717.31 ₱ 16,717.31 0.11%
0 Actual

6 As Per Plan
605 Warning Sign, Diamond 4.00 unit ₱ 7,562.51 ₱ 30,250.05 0.20%
0 Actual
5 As Per Plan
Reflectorized Thermoplastic Pavement
612(1) 248.82 l.m ₱ 1,116.90 ₱ 277,905.98 1.80%
Markings
0 Actual

VII

A.1.1(8)
FACILITIES FOR THE ENGINEER

Provision of Field Office for the Engineer


(Rental Basis)
5.00 mo. ₱ 5,667.62 ₱ 28,338.09 0.18%
133
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
As Per Plan
###
###
###
###
######
###
###
###
###
######
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
0.004

###
###
###
###
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0

###
###
###
0 Actual
0.003 0.008 0.008 0.008 0.008 0.007 0.011 0.015 0.012 0

###
###
Provision of Furnitures/Fixtures, Equip. 3 As Per Plan
0.86
A.1.1(11) and Appliances for the Field Office for the 1.00 l.s ₱ 132,580.96 ₱ 132,580.96 0.86%
Engineer 0 Actual

###
### ###
0.687
VIII OTHER GENERAL REQUIREMENTS

###
###
2 As Per Plan
0.08
B-5 Project Billboard 2.00 unit ₱ 6,296.84 ₱ 12,593.67 0.08%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.082

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
133 As Per Plan
0.015 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0
B-7 Occupational Safety and Health Program 1.00 l.s ₱ 100,295.27 ₱ 100,295.27 0.65%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.005 0.013 0.013 0.013 0.013 0.011 0.059 0.097 0.061 0

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
131 As Per Plan
0.004 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0
B-8 Traffic Management 1.00 l.s ₱ 80,623.33 ₱ 80,623.33 0.52%

###
###
###
0 Actual
0 0.009 0.009 0.009 0.009 0.008 0.055 0.091 0.055 0

###
###
###
7 As Per Plan
0.334
B-9 Mobilization/Demobilization 1.00 l.s ₱ 120,273.25 ₱ 120,273.25 0.78%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.39
₱ 15,429,550.00 100.00%

WEEKLY PROJECTION 1.5% 1.35% 1.71% 2.37% 2.61% 2.61% 2.61% 4.24% 8.56% 8
ACC. WEEKLY PROJECTION 1% 3% 5% 7% 10% 12% 15% 19% 27.57% 3
MONTHLY PROJECTION 9.55% 18.02%
ACC. MONTHLY PROJECTION 9.55% 27.57%
PROJECTED MONTHLY EXPENSES ₱1,473,120.99 ₱2,780,476.57
WEEKLY ACTUAL PROJECTION 0.58% 1.32% 2.11% 3.63% 3.96% 3.14% 8.80% 12.01% 7.84% 4
ACC. WEEKLY ACTUAL PROJECTION 1% 2% 4% 8% 12% 14.7% 23.55% 35.6% 43.401% 48
MONTHLY ACTUAL PROJECTION 11.61% 31.79%
ACC. MONTHLY ACTUAL PROJECTION 11.61% 43.401%
ACTUAL MONTHLY EXPENSES ₱1,790,900.64 ₱4,905,620.52

Prepared by:

JESUS HIPOLITO
HIMULICO CONSTRUCTION & SUPPLY CORPORATION
CONTRACTOR
JANUARY FEBRUARY MARCH APRIL
1-31 1-29 1-31 1-2
WTHF SSUM TWTHF SSUM TWTHF SSUM TWTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM TWTHF SSUM TWTH
WK.10 WK.11 WK.12 WK.13 WK.14 WK.15 WK.16 WK.17 WK.18 WK.19 WK.20

###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
### 0.037 0.037

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.014

0.051
0.010

0.051 0.051 0.051 0.036

###
###
###
###
###
###
###
###
### 0.014 0.008

###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###### 0.329 0.329 0.329

###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.122

0.078
0.087

0.078 0.078 0.078 0.078 0.078 0.078

###
###
###
###
###
###
###
###
###
###
###
###
0.049

###
###
###
###
###
###
###
0.035

###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.956###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.546

###
###
###
###
###
###
###
###
###
###
###
###
0.438

###
###
###
###
###
###
###
0.313

###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
5.699###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
5.699 5.699 5.699 5.699 5.699 5.699 5.699 5.699 3.256

###
###
###
###
###
###
###
###
###
###
###
###
3.863

###
###
2.759

0.451 0.451 0.129

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 0.49 0.49 0.42

###
###
###
###
###
###
###
### 0.042

###
###
###
###
###
###
###
###
###
###
0.04

0.099

0.106
0.028

###
###
###
###
###
### 0.11

###
###
###
###
###
### 0.2
###
###
###
###
### 0.36 1.44

###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
######
###
###
###
###
###
0.009

0.010
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.009

0.007
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.005

###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
######
###
###
###
###
###
0.034###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.034###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.020

###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.034

###
###
###
###
###
###
###
0.028###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.024

0.028###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.016

0.028 0.020

###
###
###
### 0.446

###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
8.32%
36%
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
8.20%
44%
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
7.73%
52%
6.86%
59%
6.84%
66%
6.80%
72%
6.80%
79%
6.73%
86%
6.73%
93%
4.95%
97.53%
2.47%
100%
31.11% 27.18% 14.15%
58.68% 85.85% 100.00%
₱4,800,060.51 ₱4,193,118.62 ₱2,183,081.90
4.70% 3.26%
48.10% 51.359%
7.96%
51.359%
Project: Rehabilitation of Paniqui - Moncada Via Ventinilla Provincial Road
Location: Brgy. Ventinilla, Paniqui, Tarlac
Date Started: November 22, 2019.
Project Duration: 133 C.D.
Period Covered: November 22 - February 15, 2020
NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL

22-30 1-31 1-31 1-29 1-31 1-2


F SSUM T WTHF SSUM TWTHF SSUM T WTHF SSUM TWTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM TWTHF SSUM T WTHF SSUM TWTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM TWTHF SSUM T WTHF SSUM TWTHF SSUM T WTH
NO. OF % WT. AS OF THIS

###
###
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST BID AMOUNT % WT. WK.1 WK.2 WK.3 WK.4 WK.5 WK.6 WK.7 WK.8 WK.9 WK.10 WK.11 WK.12 WK.13 WK.14 WK.15 WK.16 WK.17 WK.18 WK.19 WK.20
DAYS DATE
I EARTHWORKS

###
###
2 As Per Plan
Individual Removal of Tress, Small (150- 0.04 0.04
100(3a) 9.00 each ₱ 1,303.22 ₱ 11,728.96 0.08%
300mm Ø)

###
###
0 Actual
0.04 0.04

###
###
2 As Per Plan
Individual Removal of Tress, Small (301- 0.035 0.035
100(3b) 4.00 each ₱ 2,853.08 ₱ 11,412.32 0.07%
500mm Ø)

###
###
0 Actual
0.035 0.035

###
###
2 As Per Plan
Individual Removal of Tress, Small (701- 0.025 0.025
100(3d) 1.00 each ₱ 7,469.28 ₱ 7,469.28 0.05%
900mm Ø)

###
###
0 Actual
0.025 0.025

###
###
2 As Per Plan
Individual Removal of Tress, Large (Above 0.1 0.1
100(4) 2.00 each ₱ 15,263.56 ₱ 30,527.12 0.20%
900mm Ø)

###
###
###
###
###
0 Actual
0.1 0.1

###
###
###
###
###
5 As Per Plan
0.43
100(1) Removal of Structure and Obstruction 1.00 l.s ₱ 66,844.82 ₱ 66,844.82 0.43%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.086

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
53 As Per Plan
Removal of Dilapidated Concrete 0.651 1.138 1.138 1.138 1.138 1.138 1.138 1.138
100(3a) Pavement 4563.00 sq.m ₱ 291.52 ₱ 1,330,191.83 8.62%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.762 1.334 1.334 1.334 1.144 1.047 1.165 0.499

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
63 As Per Plan
0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037
102 Roadway Excavation 599.00 cu.m ₱ 83.95 ₱ 50,285.97 0.33%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.056 0.056 0.056 0.048 0.034 0.032 0.022 0.014 0.010
40 As Per Plan
0.051 0.051 0.051 0.051 0.051 0.036
103(1) Structure Excavation 156.00 cu.m ₱ 288.17 ₱ 44,954.55 0.29%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
000000000000000
0 Actual
0.039 0.136 0.116

15 As Per Plan
0.008 0.014 0.008
103 (6) Pipe Culvert & Drain Excavation 28.00 cu.m ₱ 158.68 ₱ 4,442.94 0.03%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.004 0.016 0.009

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
58 As Per Plan
0.094 0.329 0.329 0.329 0.329 0.329 0.329 0.329 0.329
104 Embankment 1013.00 cu.m ₱ 416.51 ₱ 421,924.23 2.73%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
000000000
0 Actual
0.019 0.675 0.579 0.347 0.270 0.185 0.122 0.148 0.215

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
96 As Per Plan
0.056 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078
105(1b) Subgrade Preparation 9240.00 sq.m ₱ 17.87 ₱ 165,127.03 1.07%
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.05 0.07 0.07 0.06 0.189 0.295 0.154 0.049 0.049 0.048 0.041
II SUBBASE COURSE

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
119 As Per Plan
0.410 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.546
200 Aggregate Sub-base Course 2783.00 cu.m ₱ 901.03 ₱ 2,507,572.87 16.25%
000000000000000
0 Actual

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.643 1.501 1.501 1.286 2.097 2.920 1.501 0.438 0.339 0.093 0.080
III CONCRETE PAVEMENT

###
###
###
###
###
###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
76 As Per Plan
1.628 5.699 5.699 5.699 5.699 5.699 5.699 5.699 5.699 5.699 5.699 3.256
311 PCCP 6958.88 sq.m ₱ 1,371.81 ₱ 9,546,271.62 61.87%
000000000000000
0 Actual

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.444 0.296 4.074 7.13 5.263 3.863 4.532 6.207 5.320
IV REINF. STEEL / STRUCTURAL CONCRETE

18 As Per Plan
0.129 0.451 0.451 0.129
404 Reinforcing Steel 2122.00 kgs. ₱ 84.38 ₱ 179,045.11 1.16%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual

20 As Per Plan
0.49 0.49 0.42
405 Structural Concrete 19.26 cu.m ₱ 11,228.50 ₱ 216,260.94 1.40%
0 Actual

500(1)a1
DRAINAGE & SLOPE PROTECTION

RCPC, 610mm Ø 2.00 l.m ₱ 4,924.90 ₱ 9,849.79 0.06%


10 As Per Plan
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
### 0.018 0.042

###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.024 0.04

###
###
###
###
###
###
###
###
12 As Per Plan
0.043 0.099 0.028
500(1)a4 RCPC, 1070mm Ø 4.00 l.m ₱ 6,515.68 ₱ 26,062.71 0.17%
0 Actual

###
###
###
###
###
###
0.063 0.106
VI ROAD SIGNS

6 As Per Plan
0.11
605(3) Informative Sign, Rectangle 1.00 unit ₱ 16,717.31 ₱ 16,717.31 0.11%

###
###
###
###
###
###
0 Actual

6 As Per Plan
0.2
605 Warning Sign, Diamond 4.00 unit ₱ 7,562.51 ₱ 30,250.05 0.20%

###
###
###
###
###
0 Actual

5 As Per Plan
Reflectorized Thermoplastic Pavement 0.36 1.44
612(1) 248.82 l.m ₱ 1,116.90 ₱ 277,905.98 1.80%
Markings
0 Actual

VII FACILITIES FOR THE ENGINEER


A.1.1(8)
Provision of Field Office for the Engineer
(Rental Basis)
5.00 mo. ₱ 5,667.62 ₱ 28,338.09 0.18%
133

0
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
As Per Plan

Actual
###
###
###
###
######
###
###
###
###
######
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
0.004

0.003
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
######
###
###
0.009

0.008
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.009

0.008
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.009

0.008
###
###
###
###
0.009

0.008
0.009

0.007
0.009

0.011
0.009

0.015
0.009

0.012
0.009

0.010
0.009
###
0.010
###
###
###
0.009
###
###
###
###
0.010
###
###
###
0.009
###
###
###
###
0.009
0.009 0.009 0.009 0.009 0.009 0.009 0.005
A.1.1(11)
Provision of Furnitures/Fixtures, Equip.
and Appliances for the Field Office for the
Engineer
1.00 l.s ₱ 132,580.96 ₱ 132,580.96 0.86%
3

0
###
###
###
As Per Plan

Actual
###
###
0.86
00

###
### ###
0.687 0.172
VIII OTHER GENERAL REQUIREMENTS

###
###
2 As Per Plan
0.08
B-5 Project Billboard 2.00 unit ₱ 6,296.84 ₱ 12,593.67 0.08%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.082

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
133 As Per Plan
0.015 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.020
B-7 Occupational Safety and Health Program 1.00 l.s ₱ 100,295.27 ₱ 100,295.27 0.65%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.005 0.013 0.013 0.013 0.013 0.011 0.059 0.097 0.061 0.034 0.035 0.036 0.031

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
131 As Per Plan
0.004 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.016
B-8 Traffic Management 1.00 l.s ₱ 80,623.33 ₱ 80,623.33 0.52%

###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.0014 0.009 0.009 0.009 0.009 0.008 0.055 0.091 0.055 0.028 0.025 0.019 0.016

###
###
###
7 As Per Plan
0.334 0.446
B-9 Mobilization/Demobilization 1.00 l.s ₱ 120,273.25 ₱ 120,273.25 0.78%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.39
₱ 15,429,550.00 100.00%

WEEKLY PROJECTION 1.5% 1.35% 1.71% 2.37% 2.61% 2.61% 2.61% 4.24% 8.56% 8.32% 8.20% 7.73% 6.86% 6.84% 6.80% 6.80% 6.73% 6.73% 4.95% 2.47%
ACC. WEEKLY PROJECTION 1% 3% 5% 7% 10% 12% 15% 19% 27.57% 36% 44% 52% 58.68% 66% 72% 79% 85.85% 93% 97.53% 100%
MONTHLY PROJECTION 9.55% 18.02% 31.11% 27.18% 14.15%
ACC. MONTHLY PROJECTION 9.55% 27.57% 58.68% 85.85% 100.00%
PROJECTED MONTHLY EXPENSES ₱1,473,120.99 ₱2,780,476.57 ₱4,800,060.51 ₱4,193,118.62 ₱2,183,081.90
WEEKLY ACTUAL PROJECTION 0.58% 1.32% 2.11% 3.63% 3.96% 3.14% 8.80% 12.01% 7.84% 4.70% 5.19% 6.95% 5.62%
ACC. WEEKLY ACTUAL PROJECTION 1% 2% 4% 8% 12% 14.7% 23.55% 35.6% 43.401% 48.10% 53.296% 60.25% 65.870%
MONTHLY ACTUAL PROJECTION 11.61% 31.79% 22.47%
ACC. MONTHLY ACTUAL PROJECTION 11.61% 43.401% 65.870%
ACTUAL MONTHLY EXPENSES ₱1,790,900.64 ₱4,905,620.52 ₱3,466,923.45

Prepared by:

JESUS HIPOLITO
HIMULICO CONSTRUCTION & SUPPLY CORPORATION
CONTRACTOR
Project: Rehabilitation of Paniqui - Moncada Via Ventinilla Provincial Road
Location: Brgy. Ventinilla, Paniqui, Tarlac
Date Started: November 22, 2019.
Project Duration: 133 C.D.
Period Covered: November 22 - February 15, 2020

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST


I EARTHWORKS

100(3a) Individual Removal of Tress, Small (150- 9.00 each ₱ 1,303.22


300mm Ø)

Individual Removal of Tress, Small (301-


100(3b) 4.00 each ₱ 2,853.08
500mm Ø)

Individual Removal of Tress, Small (701-


100(3d) 1.00 each ₱ 7,469.28
900mm Ø)

Individual Removal of Tress, Large (Above


100(4) 2.00 each ₱ 15,263.56
900mm Ø)
Individual Removal of Tress, Large (Above
100(4) 2.00 each ₱ 15,263.56
900mm Ø)

100(1) Removal of Structure and Obstruction 1.00 l.s ₱ 66,844.82

100(3a) Removal of Dilapidated Concrete 4563.00 sq.m ₱ 291.52


Pavement

102 Roadway Excavation 599.00 cu.m ₱ 83.95

103(1) Structure Excavation 156.00 cu.m ₱ 288.17

103 (6) Pipe Culvert & Drain Excavation 28.00 cu.m ₱ 158.68

104 Embankment 1013.00 cu.m ₱ 416.51

105(1b) Subgrade Preparation 9240.00 sq.m ₱ 17.87

II SUBBASE COURSE

200 Aggregate Sub-base Course 2783.00 cu.m ₱ 901.03

III CONCRETE PAVEMENT

311 PCCP 6958.88 sq.m ₱ 1,371.81

IV REINF. STEEL / STRUCTURAL CONCRETE

404 Reinforcing Steel 2122.00 kgs. ₱ 84.38


405 Structural Concrete 19.26 cu.m ₱ 11,228.50

V DRAINAGE & SLOPE PROTECTION

500(1)a1 RCPC, 610mm Ø 2.00 l.m ₱ 4,924.90

500(1)a4 RCPC, 1070mm Ø 4.00 l.m ₱ 6,515.68

VI ROAD SIGNS

605(3) Informative Sign, Rectangle 1.00 unit ₱ 16,717.31

605 Warning Sign, Diamond 4.00 unit ₱ 7,562.51

612(1) Reflectorized Thermoplastic Pavement 248.82 l.m ₱ 1,116.90


Markings

VII FACILITIES FOR THE ENGINEER

Provision of Field Office for the Engineer


A.1.1(8) 5.00 mo. ₱ 5,667.62
(Rental Basis)

Provision of Furnitures/Fixtures, Equip.


A.1.1(11) and Appliances for the Field Office for the 1.00 l.s ₱ 132,580.96
Engineer

VIII OTHER GENERAL REQUIREMENTS

B-5 Project Billboard 2.00 unit ₱ 6,296.84

B-7 Occupational Safety and Health Program 1.00 l.s ₱ 100,295.27

B-8 Traffic Management 1.00 l.s ₱ 80,623.33


B-8 Traffic Management 1.00 l.s ₱ 80,623.33

B-9 Mobilization/Demobilization 1.00 l.s ₱ 120,273.25

Prepared by:

JESUS HIPOLITO
HIMULICO CONSTRUCTION & SUPPLY CORPORATION
CONTRACTOR
NOVEMBER D
22-30
F SSUM T WTHF SSUM T WTHF
NO. OF % WT. AS OF THIS

###
###
BID AMOUNT % WT. WK.1 WK.2 WK.3
DAYS DATE

###
###
2 As Per Plan
0.04 0.04
₱ 11,728.96 0.08%

###
###
0 Actual
0.04 0.04

###
###
2 As Per Plan
0.035 0.035
₱ 11,412.32 0.07%

###
###
0 Actual
0.035 0.035

###
###
2 As Per Plan
0.025 0.025
₱ 7,469.28 0.05%

###
###
0 Actual
0.025 0.025
2 As Per Plan
0.1 0.1
₱ 30,527.12 0.20%
₱ 30,527.12 0.20%

###
###
###
###
###
0 Actual
0.1 0.1

###
###
###
###
###
5 As Per Plan
0.43
₱ 66,844.82 0.43%

###
###
###
###
###
###
###
###
###
0 Actual
0.086

###
###
###
###
###
###
###
###
###
53 As Per Plan
0.651 1.138
₱ 1,330,191.83 8.62%

###
###
###
###
###
0 Actual
0.762 1.334

###
###
###
###
###
63 As Per Plan
0.037
₱ 50,285.97 0.33%
0 Actual
0.056
40 As Per Plan
₱ 44,954.55 0.29%
0 Actual

15 As Per Plan
₱ 4,442.94 0.03%
0 Actual

58 As Per Plan
₱ 421,924.23 2.73%

###
###
###
0 Actual

###
###
###
96 As Per Plan
0.056
₱ 165,127.03 1.07%
0 Actual

###
0.05

###
119 As Per Plan
0.410
₱ 2,507,572.87 16.25%
0 Actual
0.643

76 As Per Plan
₱ 9,546,271.62 61.87%
0 Actual

18 As Per Plan
₱ 179,045.11 1.16%
0 Actual
20 As Per Plan
₱ 216,260.94 1.40%
0 Actual

10 As Per Plan
₱ 9,849.79 0.06%
0 Actual

12 As Per Plan
₱ 26,062.71 0.17%
0 Actual

6 As Per Plan
₱ 16,717.31 0.11%
0 Actual

6 As Per Plan
₱ 30,250.05 0.20%
0 Actual

5 As Per Plan
₱ 277,905.98 1.80%
0 Actual

₱ 28,338.09 0.18%
133
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
As Per Plan
0.004 0.009 0.009

###
###
###
0 Actual
0.003 0.008 0.008
3 As Per Plan
0.86
₱ 132,580.96 0.86%
0 Actual

₱ 12,593.67 0.08%
2
###
###
###
###
As Per Plan
0.08

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.082

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
133 As Per Plan
0.015 0.034 0.034
₱ 100,295.27 0.65%

###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual
0.005 0.013 0.013
131 As Per Plan
₱ 80,623.33 0.52%
###
###
###
###
###
###
###
###
###
###
###
###
###
131 As Per Plan
0.004 0.028 0.028
₱ 80,623.33 0.52%

###
###
###
0 Actual
0.0014 0.009 0.009

###
###
###
7 As Per Plan
0.334
₱ 120,273.25 0.78%

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 Actual

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.39
₱ 15,429,550.00 100.00%

WEEKLY PROJECTION 1.5% 1.35% 1.71%


ACC. WEEKLY PROJECTION 1% 3% 5%
MONTHLY PROJECTION 9.55%
ACC. MONTHLY PROJECTION 9.55%
PROJECTED MONTHLY EXPENSES ₱1,473,120.99
WEEKLY ACTUAL PROJECTION 0.58% 1.32% 2.11%
ACC. WEEKLY ACTUAL PROJECTION 1% 2% 4%
MONTHLY ACTUAL PROJECTION 11.61%
ACC. MONTHLY ACTUAL PROJECTION 11.61%
ACTUAL MONTHLY EXPENSES ₱1,790,900.64
DECEMBER JANUARY
1-31 1-31
SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSU
WK.3 WK.4 WK.5 WK.6 WK.7 WK.8 WK.9 WK.10 WK.11
###
###
###
###
###
##
###
##
###
###
###
###
###
###
###
#####
###
###
###
##
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
1.138 ###
###
###
###
###
######
###
###
###
###
######
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
1.138 1.138 1.138 1.138 1.138 1.138

###
###
###
##
###
##
###
###
###
###
###
###
###
#####
###
###
###
##
######
###
###
###
###
######
###
###
1.334

###
###
######
###
###
###
###
######
###
###
###
###
0.037 ###
###
###
###
###
######
###
###
###
###
######
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
1.334

###
###
######
###
###
###
###
######
###
###
###
###
###
0.037 ###
###
###
###
###
######
###
###
###
###
######
###
###
1.334

###
###
###
###
###
###
###
0.037
1.144

0.037
1.047

0.037
1.165

0.037
0.499

0.037 0.037 0.037

0.056

###
###
###
###
###
###
0.056

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.056 0.048 0.034 0.032 0.022

0.051
0.014

0.051
0.010

0.051

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
00
0.039

0.008 0.014 0.008

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.004

###
###
###
###
###
###
#####
###
###
###
##
######
###
###
###
###
######
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
0.094

###
###
######
###
###
###
###
######
###
###
###
###
###
0.019 ###
###
###
###
###
######
###
###
###
###
######
0.329

###
###
###
###
###
###
###
###
###
0.675
0.329

0.579
0.329

0.347
0.329

0.270
0.329

0.185
0.329

0.122
0.329

0.148
00

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
0.056

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.078

###
###
###
###
###
###
###
###
###
###
###
###
###
0.078 0.078 0.078 0.078 0.078 0.078 0.078
###
###

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.05 0.07 0.07 0.06 0.189 0.295 0.154 0.049 0.049

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
0.410

0.643###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.956

1.501###
###
###
###
###
###
###
###
###
###
###
###
###
0.956

1.501
0.956

1.286
0.956 0.956 0.956 0.956 0.956
00

###
###
2.097

###
###
###
###
###
###
###
2.920

###
###
###
###
###
###
###
1.501

###
###
###
###
###
###
###
0.438 0.339

###
###
###
###
###
###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### 1.628 5.699 5.699 5.699
00

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.444 0.296 4.074 7.13 5.263 3.863 4.532

0.129 0.451 0.451


###
###
###
###
###
###
###
###
###
###
###
###
###
### 0.49 0.49

###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
### 0.018 0.042

###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
0.024

0.043

0.063
0.04

0.099

0.106
0.028

###
###
###
##
###
##
###
###
###
###
###
###
###
#####
###
###
###
##
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
0.009

0.008
###
###
###
###
###
######
###
###
###
###
######
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
0.009

0.008
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
###
###
###
###
0.009

0.008
0.009

0.007
0.009

0.011
0.009

0.015
0.009

0.012
0.009

0.010
0.009
###
0.010
###

###
###
###
0.687

###
###
###
##
###
##
###
###
###
###
###
###
###
#####
###
###
###
##
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
0.034 ###
###
###
###
###
######
###
###
###
###
######
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
0.034 ###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
###
###
###
###
0.034 0.034 0.034 0.034 0.034 0.034 0.034

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.013 0.013 0.013 0.011 0.059 0.097 0.061 0.034 0.035
###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
0.028

0.009###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.028

0.009### 0.028

0.009
0.028

0.008
0.028

0.055
0.028

0.091
0.028

0.055
0.028

0.028
0.028
###
0.025
###

###
###
###
##
###
##
###
###
###
###
###
###
###
#####
###
###
###
##
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
1.71%
5%
###
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
2.37%
7%
2.61%
10%
2.61%
12%
2.61%
15%
4.24%
19%
8.56%
27.57%
8.32%
36%
8.20%
44%
9.55% 18.02% 31.11%
9.55% 27.57% 58.68%
₱1,473,120.99 ₱2,780,476.57 ₱4,800,060.51
2.11% 3.63% 3.96% 3.14% 8.80% 12.01% 7.84% 4.70% 5.19%
4% 8% 12% 14.7% 23.55% 35.6% 43.401% 48.10% 53.296%
11.61% 31.79% 23.45%
11.61% 43.401% 66.853%
₱1,790,900.64 ₱4,905,620.52 ₱3,618,651.03
FEBRUARY MARCH
1-29 1-31
M T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T WTHF SSUM T
WK.12 WK.13 WK.14 WK.15 WK.16 WK.17 WK.18 WK.19 WK.20
###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
0.051
0000000000000
0.136 0.116
0.051 0.036

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
0.016 0.009

0.329

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0000000
0.215

0.078 0.078 0.078 0.078 0.078


###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.048 0.041

0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.546


0000000000000

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.093 0.080

5.699 5.699 5.699 5.699 5.699 5.699 5.699 3.256


000000000000000000000000000

##
##
6.207 6.292 6.802 5.830

0.129
###
###
###
##
###
## 0.42

###
###
###
###
###
### 0.11

###
###
###
###
###
### 0.2

###
###
### 0.36 1.44

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.009
###
###
###
###
###
###
0.010
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.009
###
###
###
###
0.010
###
###
###
0.009
###
###
###
###
0.011
###
###
###
0.009
###
###
###
###
0.009
0.009 0.009 0.009 0.009 0.005

00
0.172

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.034###
###
###
###
###
###
###
###
###
###
###
###
###
###
###0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.020

###
###
###
##
###
##
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.036 0.037 0.039 0.033
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.016

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.019 0.021 0.032 0.027

0.446

###
###
###
##
###
##
###
###
###
###
###
###
###
#####
###
###
###
##
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
######
###
###
###
###
###
52%
###
###
###
###
###
###
7.73%
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
### 6.86%
58.68%
6.84%
66%
6.80%
72%
6.80%
79%
6.73%
85.85%
6.73%
93%
4.95%
97.53%
2.47%
100%
31.11% 27.18% 14.15%
58.68% 85.85% 100.00%
₱4,800,060.51 ₱4,193,118.62 ₱2,183,081.90
6.95% 6.61% 6.88% 5.90%
60.25% 66.853% 73.737% 79.637%
23.45% 12.78%
66.853% 79.637%
₱3,618,651.03 ₱1,972,458.57
APRIL

1-2
WTH
WK.20
31-Dec-19 15-Jan-20 31-Jan-20

0.00076016215638

0.00073964049502

0.00048408929619
0.00198 0.20%

0.00433225985204

0.0629 6.29% 0.0233 2.33%

0.0023 0.23% 0.00063 0.06% 0.00033 0.033%

0.0164 1.64% 0.0054 0.54% 0.00278 0.278%

0.0027 0.27% 0.0059 0.59% 0.00112 0.112%

##
##
0.546
0.0536 5.36% 0.0584 5.84% 0.01000 1.000%

0.0074 0.74% 0.1426 14.26% 0.08830 8.830%

0
0

0.00064 0.064%

0.17
0.00169 0.169%

0.11

0.2

##
##
1.44 1.8

##
##
0.005
0.00045 0.045% 0.00030 0.030% 0.00022 0.022%

0.86
0.00687 0.687%

##
##
0.0008 0.08% 0.000020 0.002%

0.020

##
##
0.0007 0.07% 0.00194 0.194% 0.00078 0.078%
0.016

##
##
0.0005 0.05% 0.00182 0.18% 0.00064 0.064%

0.446

##
##
0.0039 0.39%

##
##
%
2.47%
100%
TOTAL:

0%
81.90 ₱15,429,858.59

PLAN ACTUAL
0.00% 0.00% 0.00%
9.55% 11.61% 0.00%
27.57% 43.40% 0.00%
58.68% 43.40% 0.00%
85.85% 43.40% 0.00%
100.00% 43.40% 0.00%

UPDATE DECEMBER 31,2019. JANUARY 15,2020


PLAN ACTUAL ACTUAL PLAN
0.00% 0.00% 0.00% 0.00%
9.55% 11.61% 11.61% 9.55%
12.75% 15.80% 15.80% 12.75%
27.57% 15.80% 40.709% 26.13%
58.68% 15.80% 40.709% 27.57%
85.85% 15.80% 40.709% 58.68%
100.00% 15.80% 40.709% 85.85%
40.709% 100.00%
TOTAL 15-Feb-20 TOTAL 29-Feb-20 TOTAL

0.00076016215638 0.00076016216 0.0007602

0.00073964049502 0.0007396405 0.0007396

0.00048408929619 0.0004840893 0.0004841


0.00198 0.00198 0.00198

0.00433225985204 0.00433225985 0.0043323

0.0862 0.0862 0.0862

0.00326 0.00326 0.00326

0.00000 0.291% 0.00291 0.00291 0.00291

0.00000 0.029% 0.00029 0.00029 0.00029

0.02458 0.277% 0.00277 0.02735 0.02735

0.00968 0.102% 0.00102 0.01070 0.01070

0.12200 0.20% 0.002 0.12400 0.12400

0.23830 13.30% 0.1330 0.37130 13.60% 0.13603 0.50733


0.00064 0.00064 0.00064

0.00169 0.00169 0.00169

0.00097 0.022% 0.00022 0.00119 0.022% 0.00022 0.00141

0.00687 0.172% 0.00172 0.00859 0.00859

0.00082 0.00082 0.00082

0.00342 0.078% 0.00078 0.00420 0.078% 0.00078 0.00498


0.00296 0.04% 0.0004 0.00336 0.064% 0.00064 0.00400

0.00390 0.00390 0.00390

51.3596 65.8706 79.6376

JANUARY 15,2020 (FINAL) JANUARY 31,2020


ACTUAL PLAN ACTUAL PLAN
0.00% 0.00% 0 0.00% 0.00% 0
11.61% 9.55% 31 11.61% 9.55% 31
15.80% 12.75% 40 15.80% 12.75% Chart
40 Title
40.709% 26.13% 55 40.709% 26.13% 55
40.709% 27.57% 56 51.359% 41.866% 71
40.709% 58.68% 87 51.359% 43.00% 72
40.709% 85.85% 115 51.359% 58.68% 87
40.709% 100.00% 133 51.359% 85.85% 115
51.359% 100.00% 133
FEBRUARY 15,2020 FEBRUARY 29,2020
ACTUAL PLAN ACTUAL PLAN
0.00% 0.00% 0 0.00% 0.00% 0
11.61% 9.55% 31 11.61% 9.55% 31
t Title 15.80% 12.75% 40 15.80% 12.75% 40
40.709% 26.13% 55 40.709% 27.57% 55
51.359% 41.866% 71 51.359% 41.866% 71
65.870% 58.68% 86 65.870% 58.68% 86
65.870% 59.00% 87 79.637% 71.087% 100
65.870% 85.85% 115 79.637% 72.00% 101
65.870% 100.00% 133 79.637% 85.85% 115
79.637% 100.00% 133