2.1 WINDOW
a) w1 size 5000x2400cm No 11.00
b) w2 size 3000x2400cm No 26.00
c) w3 size
Internal one1500x1500cm
coat gypsum plastering wall. Price No 12.00
shall
d) w4includes preparation of back ground like
size 600x900cm No 32.00
chaking, rackingTotal
out joints grouts,
Carried beddings, all
to Summary
works in narrow width, corners, angles,
3. Gypsum
opening, Plastering
concrete Work
vertical & horizontal
3.1 surfaces.
a)To internal wall surface. m² 133,198.89
b)To concrete ceiling,and stair soffit. m² 47,958.73
Total Carried to Summary
4. FINISHING
WALL AND FLOOR FINISH
4.1 Supply and lay to floor 15x60 cm SPC floor m2 40,901.77
4.2 tile
8cmwith
highcement paste and joints shall be
SPC Skirting. ml 28,356.00
grouted with white cement.
4.3 Supply and lay to floor 300x300x10mm thick m2 7,056.96
4.4 floor
Supplytileand
to kitchen and bathroom
fix Ceramic floors withfor
wall tiles including m2 23,608.50
cement paste
concrete wall and joints shall be Price
grouted with
4.5 Supply
white and
cement.laydown pipetread
Granite cover.
and risershall
for stair
include in
bedded cement sand mortar(1:3)
cement-sand screed 1:3.backing,
price
grouting with matching
includes cement screed, color
mirrorand other and
polishing
incidental works.
all nacessary works
PROJECT: CLIENT: CONTRACTOR Bill of Quantity for Apartment Building
PROGRAMS
Salon and Barber FLOOR FINISH
Shop Supply and lay to floor ceramic floor tile with m2 186.14
Day Care Centre cement pastelay
Supply and and
to joints shall be floor
floor ceramic groutedtilewith
with m2 299.00
white
cementcement.
paste and joints shall be grouted with
Super Market Supply and lay to floor ceramic floor tile with m2 182.45
white
cementcement and joints
pastelay
and Rubber flooring.
shall be floor
grouted
Indoor Games Supply and to floor ceramic tilewith
with m2 186.01
white
cementcement.
paste and joints shall be grouted with
Cafe Supply and lay to floor ceramic floor tile with m2 116.21
white cement.
cement
Gym Rubber paste and joints shall be grouted with
flooring. m2 374.33
white cement.
Restaurant Supply and lay to floor ceramic floor tile with m2 396.57
Banquet cement and
Supply pastelay
and
to joints shall be grouted
floor ceramic/ withtile
vinyl floor m2 431.52
white
with cement.
Toilet N.S. cement
Vitrifiedpaste
Floorand jointssalt
soluble shall be and
tiles grouted
N.S. m2 222.65
with white
Ceramic cement.
PROJECT: CLIENT: CONTRACTOR Bill of Quantity for Duplex Type Buildings
2.1 WINDOW -
a) w1 size 300x235cm No 300.00
b) w2 size 300x240cm No 180.00
c) w3 size 150x150cm No 60.00
d) w4 size 60x90cm No 720.00
e) w5 size 666x240cm No 120.00
f) w6 size 150x130cm No 60.00
g) w7 size 300x225cm No 180.00
2.2 HAND
Internal RAIL
one coat gypsum plastering wall. Price -
Supply
shall and fixpreparation
includes three dia.50mm Aluminium
of back ground like ml 528.00
pipe Handracking
chaking, rail a Total
row connected
out joints at
grouts, the end with
beddings,
Carried to Summary all -
balusters for internal stair case with
works in narrow width, corners, angles, achors to
3.
theGypsum
concrete.
opening, Plastering
shallWork
Pricevertical
concrete include all the
& horizontal -
3.1 necessary civil works.
surfaces. -
a)To internal wall surface. m² 63,748.35
b)To concrete ceiling,and stair soffit. m² 16,431.62
PROJECT: CLIENT: CONTRACTOR Bill of Quantity for Duplex Type Buildings
2.1 WINDOW -
a) w1 size 158x230cm No 21.00
b) w2 size 90x230cm No 10.00
Total Carried to Summary -
3. Metal Sliding Doors -
Supply and fix 3mm thick Metal frame sliding
doors to entry and exit area. Price shall include
accessories,painting, and all necessary works.
-
2.1 WINDOW
a)size 289x230cm No 480.00
b)size 300x215cm No 480.00
c)size 191x215cm No 480.00
d)size 158x230cm No 480.00
e)size 90x230cm No 240.00
f)size 256x215cm No 960.00
g)size 200x105cm No 120.00
h)size 60x90cm No 1,200.00
i)size 300x235cm No 300.00
j)size 300x240cm No 180.00
k)size 150x150cm No 60.00
l)size 60x90cm No 720.00
m)size 666x240cm No 120.00
n)size 150x130cm No 60.00
PROJECT: CLIENT: CONTRACTOR Bill of Quantity
19,452.00
m2
Total Carried to Summary -
PROJECT: CLIENT: CONTRACTOR Bill of Quantity for Apartment Building
2.1 WINDOW
a) W1 size 500x240cm No 11.00
b) W2 size 300x240cm No 19.00
c) W3 size 150x240cm No 12.00
d) W4 size 60x90cm No 28.00
e) W5 size 666x240cm No 2.00
2.2 HAND
Internal RAIL
one coat gypsum plastering wall. Price
Supply and
shall includesfixpreparation
three dia.50mm Aluminium
of back ground like ml
pipe Handracking
chaking, rail a Total
row connected
out joints at
grouts, the end with
beddings,
Carried to Summary all
balusters
works for internal
in narrow stair
width, case with
corners, achors to
angles,
3.
theGypsum
concrete.
opening, Plastering
shallWork
Pricevertical
concrete include all the
& horizontal
3.1 necessary civil works.
surfaces.
a)To internal wall surface. m² 4,765.37
b)To concrete ceiling,and stair soffit. m² 2,436.85
Total Carried to Summary
4. FINISHING
WALL AND FLOOR FINISH
4.1 Supply and lay to floor 15x60 cm SPC floor m2 -
tile with cement paste and joints shall be
grouted with white cement.
PROJECT: CLIENT: CONTRACTOR Bill of Quantity for Apartment Building