Professional Documents
Culture Documents
Flooring with vitrified finish tiles 600 x 600mm in size,colour and quality
approved by the Owner / Architect with cement slurry backing on a bed of
1 cement and sieved sand mortar in the ratio 1:4, 20mm thick including M² 356 1,276.44 454,412.64 403.32 514,816.33 403.32 514,816.33
,pointing the joints with the joint filler to match the colour with tiles
,curing etc., complete.Basic Rate Rs.60 per Square feet.
Supplying and fixing Ceramic wall tiles 450x300 mm of size, colour and
quality approved by the Owner / Consultant, with tile glue/cement slurry
2 backing and set in cement mortar 1:3, 12mm thick plastered surface of the M² 100 1,657.34 165,733.76 77.37 128,228.21 77.37 128,228.21
toilet walls and surroundings of wash area including apoxy pointing etc.,
complete.Basic Rate Rs.60 per Square feet.
Flooring toilets with vitrified tiles 600 x 600 mm in size colour and
quality approved by the Owner /Consutants with cement slurry backing on
3 a bed of cement and sieved sand mortar in the ratio 1:4, 20mm thick M² 20 1,657.34 33,146.75 15.21 25,208.10 15.21 25,208.10
including ,pointing the joints with the joint filler to match the colour with
tiles ,curing etc., complete.Basic Rate Rs.60 per Square feet.
Providing & Fixing pre painted Galvanized steel non perforated ceiling
tiles (Techno/Armstrong) of size 595mm x 595mm (Nominal) having
4 thickness of 0.45mm pre-painted white color with backing paint on the FT² 3100 124.16 384,896.00 - - 3379.26 419,568.92 3,379.26 419,568.92
other side.
Providing & Fixing pre painted Galvanized steel non perforated ceiling
tiles (Techno/Armstrong/Hunter Douglus) of size 595mm x 595mm
(Nominal) having thickness of 0.45mm pre-painted white color with
5 FT² 400 133.86 53,544.00 - - 1040.82 139,324.17 1,040.82 139,324.17
backing paint on the other side.. CLIP IN Ceiling in OT.
Page 1
CIVIL-BOQ MEERAN HOSPITAL STAT CONSULTANCY PVT LTD.
Supplying and fixing stainless steel staircase handrails 110cm height using
50mm dia stainless steel top rail (SS 304 grade) ,50x10mm SS grade flat
balustrade,2nos 25mm square SS 304 grade pipe mid rails ,verticals with
12 RMT 20 3,395.00 67,900.00 - - 33.83 114,852.85 33.83 114,852.85
12mm square pipe (SS 304) at 10cmc/c including cost of all materials,
fabricating charges,welding charges,buffing to make SS finish,fixing using
anchor bolts suitably and as per approved drawing etc., complete.
Providing, fabricating and fixing hand rails for staircase, balconies etc., the
supporting structures fabricated with ms flats, square or round bars or
hollow sections, tubes etc as per the detailed drawing, including cost and
conveyance of all materials and consumables to site, labour charges for
13 RMT - - - - -
fabrication and fixing at site, lead, lift and hire charges of equipments,
tools, tackles etc, providing and applying a coat of primer on metal
surface etc, including providing and fixing hand rails of MS Pipe 40 mm
NB Medium (Hand Rail)
14 Cement Board Partition - - - -
Page 2
CIVIL-BOQ MEERAN HOSPITAL STAT CONSULTANCY PVT LTD.
15 Aluminium Partition - - -
Providing & Fixing powder coated Aluminum Fixed Partition with
63.5x38.1 mm box Section, Galzing clip,3 mm Thick Hylem Sheet , 5 mm FT² 450 281.30 126,585.00 - -
Plain Glass(Saint Gobain/ Modi or equivalent approved
make),EDPM(Ethylene
Supplying propane
and fixing PCGI finishDiaxe Methadine)Rubber
hermetically sealed Dualbeading etc.
swing openable
16 (Metaflex or equivalent) to OT`s with automation kit,door panel is flush NOS 2 101,850.00 203,700.00 1.00 101,850.00 - 1.00 101,850.00
framed in extruded aluminium alloy (grade 6063) profiles,PCGI finish
Providing, fabricating and fixing in position, powder coated Aluminum
doors using Indal Aluminium sections 9258 for verticals, 9247 for top,
9246 for bottom and 4682 for clips and panelled with 5mm thick frosted /
clear float glass, (Modi / Saint Gobain or equivalant approved make), ,
including EPDM gasket, brass pivots, handles on both sides, locking
arrangements, and all other standard accessories etc including cost and
17 conveyance of all materials to site, electricity charges, labour charges for FT² 650 392.85 255,352.50 718.72 282,349.15 50.65 19,897.85 769.37 302,247.00
fabrication and fixing, lead, lift and hire charges for scaffolding,
etc.complete as directed, at all levels.All sections, either powder coated (60
micron thickness) or electro colour anodised (15 micron thickness), should
be of uniform colour and should be guaranteed for 10 years for colour
fastness on exposure to sunlight.
Page 3
CIVIL-BOQ MEERAN HOSPITAL STAT CONSULTANCY PVT LTD.
Page 4