Total No. of
Sr. no. Loop no. Description Pipe Size replacement
locations
( Mtr)
3 PCTC3 18” FRE feed suction pipeline from tank- 18" 350 17
112/119/115/117/118/ to unit
9 PCTC88 6” OLD CAT FEED rundown pipeline from unit 6",8" 240 10
to tanks
15 PCTC122 8" RHSD run down from combination and FRE 6",8" 360 19
to TK 362/457 /360 and TK307/306
odians are LR OM&S and Unit, But lines are passing through FR OM&S area
Miscelleneous JOB
800 7 17 2 4 300
8 65 1 5 300
3 13 1 1 300
240 144 96 2 22 2 6 35
216 144 72 1 2 7
23 3 27 300
23 300
400 320 80 20
14
2 5
0 15 10
214 118 96 21
0 2 27
0
0
20 25 59 12
12 35
14 50 56 5
3 3
3 19
7 27
1 10 17
5 17 9
4 45 48
45
5 19
1 1 2 29
2 8
2 7
9 14
15
15
3 20
List Of
Inter unit Availabilit Material
coordinati y of which is
on Material not
available
IWL Coordinators for
Sr. no. Loop no. Description Comment Category Service Unit Involved Job Scope Off Site sheets Onsite sheets
Number line handing over
16” Ankleshwer feed suction pipeline from Clamp/S wrap elimination and Cordination by
2 PCTC2 tank-110/111/112/113/115/117/118/119 to FROM&S-TCOLT Crude FR/FRE /OM&S IWL liquidation FR/FRE and FR
unit & 61-P-102 A/B OM&S
Cordination by 16,17,18 ,
3 PCTC3 18” FRE feed suction pipeline from tank- FROM&S-TCOLT Crude FRE /FRE/OM&S IWL liquidation FR/FRE and FR 1,2,3,4,5,6,7,8,9,10,1 19,20,21,
112/119/115/117/118/ to unit OM&S 1,12,13,14,15,16,22, (DHT),22,23,24,2
25,28,30 5,26,27,28,29
3 parts can be completed before battery Cordination by
10” 61-P-102 A/B Ankaleshwer discharge shutdown. Common section from tank 110 Clamp/S wrap elimination and
4 PCTC4 pipeline to all crude tanks ( NW corner ) to units to be done in battery FROM&S-TCOLT Crude FR/FRE/OM&S IWL liquidation
FR/FRE and FR
shut down. OM&S
Cordination by
5 PCTC10 8” SCN rundown pipeline from unit to TK-370 parallel line at west of tank 373 can be laid. FROM&S-TCOLT SCN FR/FRE/OM&S IWL liquidation FR/FRE and FR
OM&S
Cordination by
12” NEW CAT FEED rundown pipeline from IWL liquidation and MRII tie-
8 PCTC87 unit to tanks FROM&S-TCOLT Catfeed FR/FRE/LR/OM&S point
FR/FRE and LR& FR
OM&S
6” OLD CAT FEED rundown pipeline from unit IWL liquidation and MRII tie- Cordination by
9 PCTC88 to tanks FROM&S-TCOLT Catfeed FR/FRE/LR/OM&S point FR/FRE and FR
OM&S
Cordination by
6” FRE / COMBINATION slop rundown Clamp elimination, MRII tie- FR/FRE and FR
10 PCTC92 pipeline from unit to TK-610 FROM&S-TCOLT SLOP FR/FRE/OM&S point and IWL liquidation OM&S 1,2,3 3,4,5,6,7,8
24” BH crude receipt pipeline from ONGC to TCOLT- Out going Clamp elimination and IWL Cordination by
12 SA1 Crude FR/FRE/OM&S
tanks line liquidation ONGC and FR OM&S
Cordination by
8” GFEC slop rundown pipeline from unit to NFCCU/OFCCU/ISOM NFCCU/OFCCU/ISOM
14 PCTC93 TK-610 FROM&S-TCOLT SLOP /PG/CCR IWL liquidation /PG/CCR and FR
OM&S
8" RHSD run down from combination and IWL liquidation, part deletion Cordination by
15 PCTC122
FRE to TK 362/457 /360 and TK307/306
FROM&S-TCOLT RHSD FR/FRE/OM&S
and MRII tie-point
FR/FRE and FR
OM&S
Cordination by
17 PCTC70 6"Kero run down from FR/FRE to tanks FROM&S-TCOLT Kero FR/FRE IWL liquidation FR/FRE and FR
OM&S
6" Naphtha rundown pipeline from DHT unit Cordination by DHT
18 PCTC27 to tanks 251A & B/252/253/254 completed FROM&S-PCOLT Naptha DHT IWL liquidation and FR OM&S
4" IDO old line from umbo manifold to 6" ldo Cordination by GFEC
20 PCTC51 R/D line FROM&S-PCOLT Slop GFEC IWL liquidation and FR OM&S
4" LOUPS HSD R/D line to HSD blender & E-III Cordination by LOUP
21 PCTC103 & IV HSD R/D completed FROM&S-PCOLT HSD LOUP IWL liquidation and FR OM&S
Cordination by
23 PCTC48 8" New FCCU LCN R/D pipeline to Tk.1002 FROM&S-PCOLT Naptha NFCCU IWL liquidation NFCCU and FR
OM&S
Custodians are LR OM&S and Unit, But lines are passing through FR OM&S area
LR OM&S, passing Cordination by
1 PPC7 8"RCO r/d to TK 1301/1305 LR OM&S TCOLT RCO through FR OM&S IWL liquidation in FR OM&S area FR/FRE and LR
area OM&S
14” mounted LPG flare KOD to main flare LR OM&S, passing Cordination by LPG
4 PPC21 header at Tk- 111. LR OM&S PCOLT LPG through FR OM&S IWL liquidation in FR OM&S area section and receiving
area unit
Coordinators for
Sr NO Line DescrIption and location Size Service Number of B/V Job Scope line handing over
3 PCTC89 8" Block valve on LSHS line to Tanks 8*150 LSHS 1 Replacement of damaged B/V FR OM&S
Miscelleneous JOB
Sr No Line DescrIption and location Size Service Number Job Scope Coordinators for
line handing over