FR OM&S Job List for Battery limit shutdown

Total No. of
Sr. no. Loop no. Description Pipe Size replacement
locations
( Mtr)

16" Combination feed suction pipeline from


1 PCTC1
tank-110/111/112/113 to unit
16 120 14

16” Ankleshwer feed suction pipeline from


2 PCTC2 tank-110/111/112/113/115/117/118/119 to 10",12",16 300 20
unit & 61-P-102 A/B

3 PCTC3 18” FRE feed suction pipeline from tank- 18" 350 17
112/119/115/117/118/ to unit

10” 61-P-102 A/B Ankaleshwer discharge


4 PCTC4 10" 440 22
pipeline to all crude tanks

5 PCTC10 8” SCN rundown pipeline from unit to TK-370 8" 100 8

8” SKO to Combination feed S/C pipeline from


6 PCTC71 tanks to Combination unit to HSD blending 6", 8" 120 9
pumps

12”HSD rundown pipeline from Blender to


tanks
7 PCTC76
102/264/301/306/307/308/309/313/314/315
8",12" 60 4
/760

12” NEW CAT FEED rundown pipeline from


8 PCTC87 8",12" 50 3
unit to tanks

9 PCTC88 6” OLD CAT FEED rundown pipeline from unit 6",8" 240 10
to tanks

6” FRE / COMBINATION slop rundown


10 PCTC92 6",8" 360 16
pipeline from unit to TK-610
36" PG CRUDE RECIEPT LINE (C3) MPT
11 OG2 Manifold TO HPCL CRUDE TANKAGE AREA

24” BH crude receipt pipeline from ONGC to


12 SA1
tanks

10"ATF pump discharge to air port up to


13 SA86
Refinery battery limit

8” GFEC slop rundown pipeline from unit to


14 PCTC93 TK-610 8"

15 PCTC122 8" RHSD run down from combination and FRE 6",8" 360 19
to TK 362/457 /360 and TK307/306

8” LSHS r/d and HFO line to B/H and LR,FRE to


16 PCTC 89 tanks, FR Boiler house and LR day tank 440 16
TK1341

17 PCTC70 6"Kero run down from FR/FRE to tanks 6" 320 11

6" Naphtha rundown pipeline from DHT unit


18 PCTC27 6" 12 3
to tanks 251A & B/252/253/254

4" LOBS slop rundown pipeline from unit to


19 PCTC94 TK-610 4" 4 1

4" IDO old line from umbo manifold to 6" ldo


20 PCTC51 4",6" 200 5
R/D line

4" LOUPS HSD R/D line to HSD blender & E-III


21 PCTC103 & IV HSD R/D 4" 4 1
24" Cruder Receipt line from Tk.115 dyke
22 PCTC120
wall & connected to 24" ONGC MH Crude 24" 40 3
line, 20" PG Crude Old receipt line C-1 and
36" PG Crude Receipt line

23 PCTC48 8" New FCCU LCN R/D pipeline to Tk.1002

odians are LR OM&S and Unit, But lines are passing through FR OM&S area

1 PPC7 8"RCO r/d to TK 1301/1305 8" 320 11

2 PPC13 4" H2 line to LR 4" 160 12

  8” BH gas (R-LNG) from metering station to 8"


3 PPC20
FR, CPP and LR

14” mounted LPG flare KOD to main flare


4 PPC21 header at Tk- 111.

OSI LEAK HC Flare header from FR/FRE/LEU


5 PPC22a
DHDS to 88-D-07
48",36" 300 9

6 PPC23 18" Sour gas flare header from FR to LR flare

7 PPC30 Desalter Effluent water from FR/FRE to IETP 12" 40 1

Block Valve Replacement jobs

Sr NO Line DescrIption and location

24" Block valve on BH crude receipt line to


1 SA1
TK115
10" Block valve on Ankleshwar discharge to
2 PCTC4
TK115

3 PCTC89 8" Block valve on LSHS line to Tanks

Miscelleneous JOB

Sr No Line DescrIption and location


To provide FI on 8" MP steam line to FR
1 MP steam
OM&S Ref PPS-25

2 MP steam To provide FI on 3" MP steam line to IETP Ref


PPS-25
Total 4220
wn
Pre No. of No. of No. of No.of Scaffoldin N.B.O.P.
Inch Dia At Site road corrosion
Fabrication culverts dykes g ( mtr)
cutting pads

800 7 17 2 4 300

1360 980 380 6 107 3 7 300

8 65 1 5 300

1400 880 520 4 96 1 3

320 200 120 4 51 1 1 6

3 13 1 1 300

240 144 96 2 22 2 6 35

216 144 72 1 2 7

700 540 160 3 3

960 720 240 1 20 2 1


0 20 1 14

980 676 304 4 40 2 4

980 724 256

720 588 132 69

23 3 27 300

23 300

400 320 80 20

14
2 5

0 15 10

854 678 176 4 3 20

214 118 96 21

4800 4224 576

0 2 27

0
0

14144 10936 3208 44


Inspection
requested
to gauge
out 5 Nos.
of C.P. &
Offer the
B.O.P. Rerouting Hydro test line for Cardboard Wrapping Spading Insulation
( Location RT ( inch inspection blasting Coating
( Mtr) Despading locations
s) Mtr.) however ( Inch-mtr) ( Sqm)
CGM
Maint.
Has asked
not to
5 120 10 touch any32 3
c.p.

20 25 59 12

12 35

14 50 56 5

3 3

3 19

7 27

1 10 17

5 17 9

4 45 48
45

5 19

1 1 2 29

2 8

2 7

9 14

15
15

3 20
List Of
Inter unit Availabilit Material
coordinati y of which is
on Material not
available
IWL Coordinators for
Sr. no. Loop no. Description Comment Category Service Unit Involved Job Scope Off Site sheets Onsite sheets
Number line handing over

2 parts can be completed before battery


16" Combination feed suction pipeline from shutdown. Common section from tank 110 Clamp/S wrap elimination and Cordination by
1 PCTC1 tank-110/111/112/113 to unit ( NW corner ) to units to be done in battery FROM&S-PCOLT Crude FR/FRE /OM&S IWL liquidation FR/FRE and FR
shut down. OM&S

16” Ankleshwer feed suction pipeline from Clamp/S wrap elimination and Cordination by
2 PCTC2 tank-110/111/112/113/115/117/118/119 to FROM&S-TCOLT Crude FR/FRE /OM&S IWL liquidation FR/FRE and FR
unit & 61-P-102 A/B OM&S

Cordination by 16,17,18 ,
3 PCTC3 18” FRE feed suction pipeline from tank- FROM&S-TCOLT Crude FRE /FRE/OM&S IWL liquidation FR/FRE and FR 1,2,3,4,5,6,7,8,9,10,1 19,20,21,
112/119/115/117/118/ to unit OM&S 1,12,13,14,15,16,22, (DHT),22,23,24,2
25,28,30 5,26,27,28,29
3 parts can be completed before battery Cordination by
10” 61-P-102 A/B Ankaleshwer discharge shutdown. Common section from tank 110 Clamp/S wrap elimination and
4 PCTC4 pipeline to all crude tanks ( NW corner ) to units to be done in battery FROM&S-TCOLT Crude FR/FRE/OM&S IWL liquidation
FR/FRE and FR
shut down. OM&S

Cordination by
5 PCTC10 8” SCN rundown pipeline from unit to TK-370 parallel line at west of tank 373 can be laid. FROM&S-TCOLT SCN FR/FRE/OM&S IWL liquidation FR/FRE and FR
OM&S

8” SKO to Combination feed S/C pipeline FR/FRE/DHDS/DHT/ IWL liquidation Cordination by


6 PCTC71 from tanks to Combination unit to HSD 3 parts can be completed before battery FROM&S-TCOLT SKO FR/FRE/DHDS/DHT
blending pumps shutdown OM&S and FR OM&S 1,2,3,4,5,6 10,11,12,13
12”HSD rundown pipeline from Blender to Cordination by
tanks FR/FRE/DHDS/DHT/
7 PCTC76 102/264/301/306/307/308/309/313/314/31 FROM&S-TCOLT HSD
OM&S IWL liquidation FR/FRE/DHDS/DHT
and FR OM&S
5/760

Cordination by
12” NEW CAT FEED rundown pipeline from IWL liquidation and MRII tie-
8 PCTC87 unit to tanks FROM&S-TCOLT Catfeed FR/FRE/LR/OM&S point
FR/FRE and LR& FR
OM&S

6” OLD CAT FEED rundown pipeline from unit IWL liquidation and MRII tie- Cordination by
9 PCTC88 to tanks FROM&S-TCOLT Catfeed FR/FRE/LR/OM&S point FR/FRE and FR
OM&S

Cordination by
6” FRE / COMBINATION slop rundown Clamp elimination, MRII tie- FR/FRE and FR
10 PCTC92 pipeline from unit to TK-610 FROM&S-TCOLT SLOP FR/FRE/OM&S point and IWL liquidation OM&S 1,2,3 3,4,5,6,7,8

IWL liquidation and MOC for


36" PG CRUDE RECIEPT LINE (C3) MPT TCOLT- Out going conversion of 24" to 36" line
11 OG2 Crude FR/FRE/OM&S MbPT and FR OM&S
Manifold TO HPCL CRUDE TANKAGE AREA line size as well as block valve
replacement at Tank manifold

24” BH crude receipt pipeline from ONGC to TCOLT- Out going Clamp elimination and IWL Cordination by
12 SA1 Crude FR/FRE/OM&S
tanks line liquidation ONGC and FR OM&S

10"ATF pump discharge to air port up to Cordination by


13 SA86 Refinery battery limit FROM&S-SA ATF OM&S/ASF Rerouting and IWL liquidation Marketing and FR
OM&S

Cordination by
8” GFEC slop rundown pipeline from unit to NFCCU/OFCCU/ISOM NFCCU/OFCCU/ISOM
14 PCTC93 TK-610 FROM&S-TCOLT SLOP /PG/CCR IWL liquidation /PG/CCR and FR
OM&S

8" RHSD run down from combination and IWL liquidation, part deletion Cordination by
15 PCTC122
FRE to TK 362/457 /360 and TK307/306
FROM&S-TCOLT RHSD FR/FRE/OM&S
and MRII tie-point
FR/FRE and FR
OM&S

8” LSHS r/d and HFO line to B/H and LR,FRE Cordination by


16 PCTC 89 to tanks, FR Boiler house and LR day tank FROM&S-TCOLT LSHS FR/FRE/OM&S IWL liquidation FR/FRE and FR
TK1341 OM&S

Cordination by
17 PCTC70 6"Kero run down from FR/FRE to tanks FROM&S-TCOLT Kero FR/FRE IWL liquidation FR/FRE and FR
OM&S
6" Naphtha rundown pipeline from DHT unit Cordination by DHT
18 PCTC27 to tanks 251A & B/252/253/254 completed FROM&S-PCOLT Naptha DHT IWL liquidation and FR OM&S

4" LOBS slop rundown pipeline from unit to Cordination by LOUP


19 PCTC94 TK-610 FROM&S-PCOLT SLOP LOUP IWL liquidation and FR OM&S

4" IDO old line from umbo manifold to 6" ldo Cordination by GFEC
20 PCTC51 R/D line FROM&S-PCOLT Slop GFEC IWL liquidation and FR OM&S

4" LOUPS HSD R/D line to HSD blender & E-III Cordination by LOUP
21 PCTC103 & IV HSD R/D completed FROM&S-PCOLT HSD LOUP IWL liquidation and FR OM&S

24" Cruder Receipt line from Tk.115 dyke


22 PCTC120
wall & connected to 24" ONGC MH Crude FROM&S - TCOLT Crude FR / FRE/ O M&S IWL liquidation
Cordination by FR
line, 20" PG Crude Old receipt line C-1 and FR OM&S
and 36" PG Crude Receipt line

Cordination by
23 PCTC48 8" New FCCU LCN R/D pipeline to Tk.1002 FROM&S-PCOLT Naptha NFCCU IWL liquidation NFCCU and FR
OM&S
Custodians are LR OM&S and Unit, But lines are passing through FR OM&S area
LR OM&S, passing Cordination by
1 PPC7 8"RCO r/d to TK 1301/1305 LR OM&S TCOLT RCO through FR OM&S IWL liquidation in FR OM&S area FR/FRE and LR
area OM&S

LR OM&S, passing Cordination by DHDS


2 PPC13 4" H2 line to LR LR OM&S PCOLT H2 through FR OM&S IWL liquidation in FR OM&S area
and LR Onsite
area

LR OM&S, passing Cordination by LPG


  8” BH gas (R-LNG) from metering station to
3 PPC20 FR, CPP and LR completed LR OM&S PCOLT BHG through FR OM&S IWL liquidation and re routings section and receiving
area unit

14” mounted LPG flare KOD to main flare LR OM&S, passing Cordination by LPG
4 PPC21 header at Tk- 111. LR OM&S PCOLT LPG through FR OM&S IWL liquidation in FR OM&S area section and receiving
area unit

LR OM&S, passing Cordination by


OSI LEAK HC Flare header from FR/FRE/LEU
5 PPC22a DHDS to 88-D-07 LR OM&S PCOLT FLARE GAS through FR OM&S IWL liquidation in FR OM&S area connected unit and
area LR & FR OM&S

LR OM&S, passing Cordination by


6 PPC23 18" Sour gas flare header from FR to LR flare LR OM&S PCOLT Flare gas through FR OM&S IWL liquidation in FR OM&S area connected unit and
area LR &FR OM&S

LR OM&S, passing Cordination by


7 PPC30 Desalter Effluent water from FR/FRE to IETP LR OM&S PCOLT Sour Water through FR OM&S IWL liquidation in FR OM&S area connected unit and
area LR OM&S
Block Valve Replacement jobs

Coordinators for
Sr NO Line DescrIption and location Size Service Number of B/V Job Scope line handing over

24" Block valve on BH crude receipt line to


1 SA1 TK115 24"*150 Crude 1 Replacement of passing b/v FR OM&S

10" Block valve on Ankleshwar discharge to


2 PCTC4 TK115 10"* 150 Crude 1 Replacement of passing b/v FR OM&S

3 PCTC89 8" Block valve on LSHS line to Tanks 8*150 LSHS 1 Replacement of damaged B/V FR OM&S

Miscelleneous JOB

Sr No Line DescrIption and location Size Service Number Job Scope Coordinators for
line handing over

To provide FI on 8" MP steam line to FR Provision of FI for steam balance


1 MP steam 8" MP steam 1 FR OM&S
OM&S Ref PPS-25 calculation
To provide FI on 3" MP steam line to IETP Ref Provision of FI for steam balance
2 MP steam 3" MP steam 1 FR OM&S
PPS-25 calculation
Total
Units involved