6-Jul-19

S.NO. TIME JOB WORK EXECUTED TIME OUT REMARKS


1 07.00 AM IBQ DROPPING MUTHU,DASAN,VIBIN IN IBQ 07.40 AM N/A

Charged R 22 Refrigerant to circuit A Kindly provide necessary


through Compressor and Drained N2 from info before sending to
2 08.00 AM SULTAN BUILDING Circuit B 08.50 AM site.

Checked status of the GTR chillers for any


alarms and Reset done for T114 alarm in
3 09.15 AM AATKINS AND QAPCO BUILDING Qapco Building 9.45 AM Done

To meet Mr. Prakasan for report signature


and submitted Lussail June month PPM Done with Some changes
4 10.00 AM ALSAAD MPH signed Report. 11.00 Am mentioned

Drained out N2 from Circuit B completely


5 11.30 AM SULTAN BUILDING and strated vaccuming the system. 12.15 PM Done

6 12.15 PM IBQ Picked Muthu Dasan & Vibin to room 1.00 PM N/A

7 03.00 PM IBQ Dropped Shyam and Muthu 4.00 PM N/A

Charged R 22 Refrigerant to circuit A unit not Started Because


through Liquid Line and tried to start the of A 202 alarm( cooler
8 04.15 Pm SULTAN BUILDING Unit 06.45 Pm pump interlock failure)
7-Jul-19
S.NO. TIME JOB WORK EXECUTED TIME OUT REMARKS
1 06.45 AM AMERICAN SCHOOL DROPPED SHYAM AND SURYA 07.30 AM N/A

one damaged motor not


Removed 6 FCU fan motors and services fixed and have to drill
2 08.30 AM HAMAD VILLA BANI HAJER and refixed 5 motors 03.50 PM one screw to plate

Serviced one window unit of 19 number


flat and cleared water leak problem of 399
3 05.30 AM MANSOURA flat 7.45 PM Done

chargred R134 a recovered and one new


cylinder for chiller 1 circuit C and fixed two
4 08.00 PM IBQ fan motors for chiller 4 10.30 PM Done
6-Jul-19
S.NO. TIME JOB
1 06.30 AM IBQ

2 07.45 AM AIN KHALID MOSQUE

3 09.20 AM MCL

4 10.00 AM ALSAAD MPH

5 11.30 AM SULTAN BUILDING


6 12.15 PM IBQ
7 03.00 PM IBQ

8 04.15 Pm SULTAN BUILDING


6-Jul-19
WORK EXECUTED TIME OUT REMARKS
DROPPING MUTHU,DASAN,VIBIN IN IBQ 07.10 AM N/A
Checked chiller 1 compressor details and
captured pictures 08.30 AM N/A

Checked chiller 1 for maintenance and


took circuit B reading observed negitive at One Pump Running and
43 % EXV Position predicted Low water need to turn on another
flow. 9.45 AM primary pump.

To meet Mr. Prakasan for report signature


and submitted Lussail June month PPM Done with Some changes
signed Report. 11.00 Am mentioned

Drained out N2 from Circuit B completely


and strated vaccuming the system. 12.15 PM Done
Picked Muthu Dasan & Vibin to room 1.00 PM N/A
Dropped Shyam and Muthu 4.00 PM N/A

Charged R 22 Refrigerant to circuit A unit not Started Because


through Liquid Line and tried to start the of A 202 alarm( cooler
Unit 06.45 Pm pump interlock failure)