The document contains a log of maintenance work executed on July 6th and 7th. On the 6th, the technician dropped off and picked up coworkers from the IBQ building, worked on chillers and buildings like Sultan and ALSAAD MPH, charged refrigerants, drained nitrogen, and tried to start a unit but failed due to an alarm. On the 7th, workers were dropped off, fan motors were removed and repaired, a water leak was fixed, and a chiller was charged with refrigerant.
The document contains a log of maintenance work executed on July 6th and 7th. On the 6th, the technician dropped off and picked up coworkers from the IBQ building, worked on chillers and buildings like Sultan and ALSAAD MPH, charged refrigerants, drained nitrogen, and tried to start a unit but failed due to an alarm. On the 7th, workers were dropped off, fan motors were removed and repaired, a water leak was fixed, and a chiller was charged with refrigerant.
The document contains a log of maintenance work executed on July 6th and 7th. On the 6th, the technician dropped off and picked up coworkers from the IBQ building, worked on chillers and buildings like Sultan and ALSAAD MPH, charged refrigerants, drained nitrogen, and tried to start a unit but failed due to an alarm. On the 7th, workers were dropped off, fan motors were removed and repaired, a water leak was fixed, and a chiller was charged with refrigerant.
Charged R 22 Refrigerant to circuit A unit not Started Because
through Liquid Line and tried to start the of A 202 alarm( cooler 8 04.15 Pm SULTAN BUILDING Unit 06.45 Pm pump interlock failure) 7-Jul-19 S.NO. TIME JOB WORK EXECUTED TIME OUT REMARKS 1 06.45 AM AMERICAN SCHOOL DROPPED SHYAM AND SURYA 07.30 AM N/A
one damaged motor not
Removed 6 FCU fan motors and services fixed and have to drill 2 08.30 AM HAMAD VILLA BANI HAJER and refixed 5 motors 03.50 PM one screw to plate
Serviced one window unit of 19 number
flat and cleared water leak problem of 399 3 05.30 AM MANSOURA flat 7.45 PM Done
chargred R134 a recovered and one new
cylinder for chiller 1 circuit C and fixed two 4 08.00 PM IBQ fan motors for chiller 4 10.30 PM Done 6-Jul-19 S.NO. TIME JOB 1 06.30 AM IBQ
2 07.45 AM AIN KHALID MOSQUE
3 09.20 AM MCL
4 10.00 AM ALSAAD MPH
5 11.30 AM SULTAN BUILDING
6 12.15 PM IBQ 7 03.00 PM IBQ
8 04.15 Pm SULTAN BUILDING
6-Jul-19 WORK EXECUTED TIME OUT REMARKS DROPPING MUTHU,DASAN,VIBIN IN IBQ 07.10 AM N/A Checked chiller 1 compressor details and captured pictures 08.30 AM N/A
Checked chiller 1 for maintenance and
took circuit B reading observed negitive at One Pump Running and 43 % EXV Position predicted Low water need to turn on another flow. 9.45 AM primary pump.
To meet Mr. Prakasan for report signature
and submitted Lussail June month PPM Done with Some changes signed Report. 11.00 Am mentioned
Drained out N2 from Circuit B completely
and strated vaccuming the system. 12.15 PM Done Picked Muthu Dasan & Vibin to room 1.00 PM N/A Dropped Shyam and Muthu 4.00 PM N/A
Charged R 22 Refrigerant to circuit A unit not Started Because
through Liquid Line and tried to start the of A 202 alarm( cooler Unit 06.45 Pm pump interlock failure)