Professional Documents
Culture Documents
Project: Wipro Kawasaki Subcontractor: Sai Cool Zone: Joint Measurement Sheet (Measurement Sheet For Supply/Installation)
Project: Wipro Kawasaki Subcontractor: Sai Cool Zone: Joint Measurement Sheet (Measurement Sheet For Supply/Installation)
NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
DOC. NO.: GCL-01 ISSUED DATE: REV.0
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India
NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
DOC. NO.: GCL-01 ISSUED DATE: REV.0
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India
3 Control Cabling
a 2CX2.5 Sq.mm Assembly Area 100.00 Mtrs
2CX2.5 Sq.mm Inspection Room 113.00 Mtrs
2CX2.5 Sq.mm Mezzanine Floor 199.00 Mtrs
2CX2.5 Sq.mm Mezzanine+Ground Floor 186.00 Mtrs
NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________