SHIMIZU CORPORATION INDIA PVT LTD

No2,Prestiage Emerald,5th Floor,Levelle Road,


Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Indoor&Outdoor Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 1
Approval Drawing No Date of Measurement Bill No
MA-06,MA-07 12/18/2018
SL No Description Location Qty Unit
ASSEMBLY,INSPECTION,ELECTRIC ROOM AND MEZZANINE FLOOR
I AIR CONDITIONING EQUIPMENTS
Installation of Outdoor Unit
a 18 HP Outdoor Unit Inspection +Electric Room 01 No
18 HP Outdoor Unit Mezzanine Floor 01 No
18 HP Outdoor Unit Mezzanine+Ground Floor 01 No

b 16 HP Outdoor Unit Assembly Area 01 No

2 Installation of Indoor Unit


2.1 Cassette Units
a 0.8 TR FXFQ25AVM DIRECTOR ROOM 01 No
0.8 TR FXFQ25AVM DIRECTOR ROOM 01 No
0.8 TR FXFQ25AVM DIRECTOR ROOM 01 No
0.8 TR FXFQ25AVM MEETING ROOM 1 01 No
0.8 TR FXFQ25AVM OFFICE CABIN 1 01 No
0.8 TR FXFQ25AVM OFFICE CABIN 2 01 No
0.8 TR FXFQ25AVM OFFICE CABIN 3 01 No
0.8 TR FXFQ25AVM OFFICE CABIN 4 01 No
0.8 TR FXFQ25AVM MEETING ROOM 1 01 No
0.8 TR FXFQ25AVM MEETING ROOM 2 01 No

b 1.3 TR FXFQ40AVM MD ROOM 01 No


1.3 TR FXFQ40AVM RECEPTION AREA 01 No

c 1.6 TR FXFQ50AVM CONFERENCE ROOM 01 No

NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0


6
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Indoor Unit Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 2
Approval Drawing No Date of Measurement Bill No
MA-06,MA-07 12/18/2018
SL No Description Location Qty Unit
ASSEMBLY,INSPECTION,ELECTRIC ROOM AND MEZZANINE FLOOR
2 Installation of Indoor Unit
2.1 Cassette Units
d 2.56 TR FXFQ80AVM ASSEMBLY AREA 01 No
2.56 TR FXFQ80AVM ASSEMBLY AREA 01 No
2.56 TR FXFQ80AVM ASSEMBLY AREA 01 No
2.56 TR FXFQ80AVM ASSEMBLY AREA 01 No
2.56 TR FXFQ80AVM DINNING HALL 01 No
2.56 TR FXFQ80AVM DINNING HALL 01 No
2.56 TR FXFQ80AVM DINNING HALL 01 No
2.56 TR FXFQ80AVM OFFICE AREA 01 No
2.56 TR FXFQ80AVM OFFICE AREA 01 No
2.56 TR FXFQ80AVM OFFICE AREA 01 No

2.2 Hiwall Units(Wall Mounted)


a 0.8 TR FXAQ25PVE6 SERVER ROOM 01 No
0.8 TR FXAQ25PVE7 SERVER ROOM 01 No
b 1.6TR FXAQ50PVE6 INSPECTION ROOM 01 No
1.6TR FXAQ50PVE7 INSPECTION ROOM 01 No
c 2.0TR FXAQ63PVE6 ELECTRIC ROOM (UPS) 01 No
2.0TR FXAQ63PVE7 ELECTRIC ROOM 01 No
2.0TR FXAQ63PVE8 ELECTRIC ROOM 01 No
2.0TR FXAQ63PVE9 ELECTRIC ROOM 01 No

NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
DOC. NO.: GCL-01 ISSUED DATE: REV.0
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)

Name of Work Work Order No & Date JMS No


Copper pipe Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023
3

Approval Drawing No Date of Measurement Bill No


MA-06,MA-07 12/18/2018
SL No Description Location Qty Unit
ASSEMBLY,INSPECTION,ELECTRIC ROOM AND MEZZANINE FLOOR
II. AIR-CONDITIONING PIPING WORK AND ACCESSORIES
1 Copper pipe with Insulation
a 28.6 mm (Insulation-19mm thick) Assembly Area 58.00 Mtr
28.6 mm (Insulation-19mm thick) Inspection Room 6.00 Mtr
28.6 mm (Insulation-19mm thick) Mezzanine Floor 62.00 Mtr
28.6 mm (Insulation-19mm thick) Mezzanine+Ground Floor 48.00 Mtr
Total 174.00 Mtr
b 22.2 mm (Insulation-19mm thick) Assembly Area 8.00 Mtr
22.2 mm (Insulation-19mm thick) Inspection Room 7.00 Mtr
22.2 mm (Insulation-19mm thick) Mezzanine Floor 6.00 Mtr
22.2 mm (Insulation-19mm thick) Mezzanine+Ground Floor 10.00 Mtr
Total 31.00 Mtr
c 19.1 mm (Insulation-13mm thick) Assembly Area 8.00 Mtr
19.1 mm (Insulation-13mm thick) Mezzanine Floor 13.00 Mtr
19.1 mm (Insulation-13mm thick) Mezzanine+Ground Floor 20.00 Mtr
Total 41.00 Mtr

NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0


SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)

Name of Work Work Order No & Date JMS No


Copper pipe Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023
4

Approval Drawing No Date of Measurement Bill No


MA-06,MA-07 12/18/2018
SL No Description Location Qty Unit
ASSEMBLY,INSPECTION,ELECTRIC ROOM AND MEZZANINE FLOOR
II. AIR-CONDITIONING PIPING WORK AND ACCESSORIES
1 Copper pipe with Insulation
d 15.9 mm (Insulation-13mm thick) Assembly Area 24.00 Mtr
15.9 mm (Insulation-13mm thick) Inspection Room 66.00 Mtr
15.9 mm (Insulation-13mm thick) Mezzanine Floor 95.00 Mtr
15.9 mm (Insulation-13mm thick) Mezzanine+Ground Floor 63.00 Mtr
Total 248.00 Mtr
e 12.7 mm (Insulation-13mm thick) Assembly Area 58.00 Mtr
12.7 mm (Insulation-13mm thick) Inspection Room 13.00 Mtr
12.7 mm (Insulation-13mm thick) Mezzanine Floor 34.00 Mtr
12.7 mm (Insulation-13mm thick) Mezzanine+Ground Floor 77.00 Mtr
Total 182.00 Mtr
f 9.5 mm (Insulation-13mm thick) Assembly Area 40.00 Mtr
9.5 mm (Insulation-13mm thick) Inspection Room 67.00 Mtr
9.5 mm (Insulation-13mm thick) Mezzanine Floor 52.00 Mtr
9.5 mm (Insulation-13mm thick) Mezzanine+Ground Floor 26.00 Mtr
Total 185.00 Mtr
NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
DOC. NO.: GCL-01 ISSUED DATE: REV.0
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Refnet Joint&Drain pipe Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 5
Approval Drawing No Date of Measurement Bill No
MA-06,MA-07 12/18/2018
SL No Description Location Qty Unit
ASSEMBLY,INSPECTION,ELECTRIC ROOM AND MEZZANINE FLOOR
II. AIR-CONDITIONING PIPING WORK AND ACCESSORIES
1 Copper pipe with Insulation
g 6.4 mm (Insulation-13mm thick) Inspection Room 13.00 Mtr
6.4 mm (Insulation-13mm thick) Mezzanine Floor 34.00 Mtr
6.4 mm (Insulation-13mm thick) Mezzanine+Ground Floor 58.00 Mtr
Total 105.00 Mtr
H Refnet Joints Assembly 03 Nos
Refnet Joints Inspection+ Electric Room 05 Nos
Refnet Joints Mezzanine Floor 11 Nos
Refnet Joints Mezzanine+Ground Floor 08 Nos
Total 27 Nos
2 PVC pipe
a 40mm Diameter Assembly Area 34.00 Mtr
40mm Diameter Mezzanine Floor 19.00 Mtr
40mm Diameter Mezzanine+Ground Floor 27.00 Mtr
Total 80.00 Mtr
b 32mm Diameter Assembly Area 12.00 Mtr
32mm Diameter Inspection Room 41.00 Mtr
32mm Diameter Mezzanine Floor 21.00 Mtr
32mm Diameter Mezzanine+Ground Floor 41.00 Mtr
Total 115.00 Mtr

NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
DOC. NO.: GCL-01 ISSUED DATE: REV.0
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)

Name of Work Work Order No & Date JMS No


Control Cabling Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023
6

Approval Drawing No Date of Measurement Bill No


MA-06,MA-07 12/18/2018
SL No Description Location Qty Unit
ASSEMBLY,INSPECTION,ELECTRIC ROOM AND MEZZANINE FLOOR

3 Control Cabling
a 2CX2.5 Sq.mm Assembly Area 100.00 Mtrs
2CX2.5 Sq.mm Inspection Room 113.00 Mtrs
2CX2.5 Sq.mm Mezzanine Floor 199.00 Mtrs
2CX2.5 Sq.mm Mezzanine+Ground Floor 186.00 Mtrs

Total 598.00 Mtrs


6 Refrigerent Gas(R410) Charging
Refrigerent Charging Assembly Area 19.50 Kgs
Refrigerent Charging Inspection Room 20.50 Kgs
Refrigerent Charging Mezzanine Floor 29.50 Kgs
Refrigerent Charging Mezzanine+Ground Floor 30.50 Kgs

Total 100.00 Kgs


NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0


SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
MS Support Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 7
Approval Drawing No Date of Measurement Bill No
MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
ASSEMBLY,INSPECTION,ELECTRIC ROOM AND MEZZANINE FLOOR
II)7 MS Support (Copper pipe Tray Installation)
IV)14 MS Support (Supply&Exhaust Duct Installation)
ASSEMBLY AREA 100.05 Kgs
Factory Area 6.96 Kgs
TEST BENCH 88.16 Kgs
INSPECTION ROOM 40.17 Kgs
Electrical Room 6.82 Kgs
Mezzanine Floor 506.05 Kgs

Total 748.21 Kgs


NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0


.
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Inline&Centrifugal Fan Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 8
Approval Drawing No Date of Measurement Bill No
MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Test Bench,Locker Room,Inspection Room,Toilet,Entrance
III VENTILATION FANS
1 Inline&Centrifugal Fan
Exhaust Fan
GF-EF-06, Centrifugal
a Fan, Capacity : 6,400cmh, Testing Room 01 Nos
St.P 200Pa
GF-EF-09, Inline Fan,
b Capacity : 2,000cmh, St.P Locker (Male&Female) 01 Nos
200Pa, .
MF-EF-01, Inline Fan,
c Capacity : 800cmh, St.P 01 Nos
200Pa, Dinning Area & Pantry
MF-EF-02, Inline Fan,
d Capacity : 800cmh, St.P 01 Nos
200Pa, Toilet (Male&Female)
Supply Fan
GF-SF-01, Inline Fan,
a Capacity : 500cmh, St.P Inspection Room 01 Nos
120Pa
GF-SF-03, Inline Fan,
b Capacity : 400cmh, St.P Meeting & Entrance 01 Nos
200Pa, For

NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0


SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Supply&Exhaust Fan Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 9
Approval Drawing No Date of Measurement Bill No
MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Meeting Room,Office Area,Factory Area,Toilet,Paint Area & Loading/Unloading
III VENTILATION FANS
1 Inline&Centrifugal Fan
Supply Fan
MF-SF-01, Inline Fan,
c Capacity : 1,000cmh, St.P Meeting Room 01 No
200Pa, For
MF-SF-02, Inline Fan,
d Capacity : 800cmh, St.P Office Area 01 No
200Pa
Exhaust Fan
a GF-EF-01~03, Industrial
Propeller Fan, Capacity : 03 No
12,000cmh, St.P 80Pa
Factory Area.
b GF-EF-04, Wall Mounted
Fan, Capacity :400cmh, Toilet (Female) 01 No
St.P 50Pa, For
d GF-EF-07, Wall Mounted
Fan, Capacity : 3,600cmh, Paint Area 01 No
St.P 50Pa,
e GF-EF-08, Industrial
Propeller Fan, Capacity : Loading /Unloading 01 No
6,100cmh, St.P 80Pa
f GF-EF-10, Wall Mounted
Fan, Capacity :300cmh, Office Toilet 01 No
St.P 50Pa, For
NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
DOC. NO.: GCL-01 ISSUED DATE: REV.0
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)

Name of Work Work Order No & Date JMS No


Supply&Exhaust Fan Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023
10

Approval Drawing No Date of Measurement Bill No


MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Compressor Room,Guard House,Pump Room & Assemly Area
Exhaust Fan
g GF-EF-11, Industrial
Propeller Fan, Capacity : Compressor Room
5,000cmh, St.P 80Pa, For
01 No
h GF-EF-12, Wall Mounted
Fan, Capacity :800cmh, Guard House
St.P 50Pa, For 01 No
i GF-EF-13, Wall Mounted
Fan, Capacity :1,000cmh, Pump Room
St.P 50Pa, For
01 No
Supply Fan
a GF-SF-02a, Wall Mounted
Fan, Capacity : 900cmh, Assembly Room
St.P 50Pa, For 01 No
b GF-SF-02b, Wall Mounted
Fan, Capacity : 900cmh, Assembly Room
St.P 50Pa, For
01 No
NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0


SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)

Name of Work Work Order No & Date JMS No


GI Duct Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023
11

Approval Drawing No Date of Measurement Bill No


MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Inspection Room,Test Bench,Locker Room,Office Area,Dinning Area

1 Supply & Exhaust Duct


a 0.63 mm (24 SWG) Inspection Room 8.81 Sq.Mtr
0.63 mm (24 SWG) Test Bench 42.76 Sq.Mtr
0.63 mm (24 SWG) Locker Room(Exhaust) 41.10 Sq.Mtr
0.63 mm (24 SWG) Locker Room(Supply) 20.71 Sq.Mtr
0.63 mm (24 SWG) Office Area (Supply 1) 26.91 Sq.Mtr
0.63 mm (24 SWG) Office Area (Supply 2) 50.06 Sq.Mtr
0.63 mm (24 SWG) Dinning & Pantry Area 21.35 Sq.Mtr
0.63 mm (24 SWG) Male & Female Toilet 14.93 Sq.Mtr
0.63 mm (24 SWG) All Hood Netting flange 2.49 Sq.Mtr

Total 229.12 Sq.Mtr


NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0


SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Flexible Duct Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 12
Approval Drawing No Date of Measurement Bill No
MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Inspection Room,Test Bench,Locker Room,Office Area & Meeting Area
3 Flexible Duct
a 200 mm Dia Inspection Room 1.5 Mtr
Test Bench 6.0 Mtr
Locker Room 3.0 Mtr
Reception area 1.5 Mtr
Meeting room 1 1.5 Mtr
Meeting room 2 1.5 Mtr
Office Toilet 1.5 Mtr
Office Cabin 1 1.5 Mtr
Office Cabin 2 1.5 Mtr
Office Cabin 3 1.5 Mtr
Office Cabin 4 1.5 Mtr
Office Area 2.0 Mtr
Meeting Room 1 2.0 Mtr
Conference Room 2.0 Mtr
Director Room1 2.0 Mtr
Director Room2 2.0 Mtr
Director Room3 2.0 Mtr
MD Room 3.0 Mtr
Server Room 1.5 Mtr
Dinning Area 1.5 Mtr
Pantry Area 1.5 Mtr
Male Toilet 3.0 Mtr
Female Toilet 1.0 Mtr

Total 46.00 Mtr


NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
DOC. NO.: GCL-01 ISSUED DATE: REV.0
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Supply Air Diffuser Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 13
Approval Drawing No Date of Measurement Bill No
MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Inspection Room,Meeting Room,Office Area
4 Supply Air Diffuser INSPECTION ROOM 0.20 Sq.Mtrs
Reception area 0.02 Sq.Mtrs
Meeting room 1 0.02 Sq.Mtrs
Meeting room 2 0.02 Sq.Mtrs
Office Cabin 1 0.09 Sq.Mtrs
Office Cabin 2 0.09 Sq.Mtrs
Office Cabin 3 0.09 Sq.Mtrs
Office Cabin 4 0.09 Sq.Mtrs
Office Area 0.18 Sq.Mtrs
Meeting Room 1 0.09 Sq.Mtrs
Conference Room 0.09 Sq.Mtrs
Director Room1 0.09 Sq.Mtrs
Director Room2 0.09 Sq.Mtrs
Director Room3 0.09 Sq.Mtrs
MD Room 0.09 Sq.Mtrs
Server Room 0.09 Sq.Mtrs

Total 1.43 Sq.Mtrs


NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
DOC. NO.: GCL-01 ISSUED DATE: REV.0
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Return Air Diffuser Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 14
Approval Drawing No Date of Measurement Bill No
MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Test Bench,Locker Room,Office Area,Toilet & Dinning , Pantry Area

5 Return Air Diffuser Test Bench 0.80 Sq.Mtrs


Locker Room Male 0.20 Sq.Mtrs
Locker Room Female 0.10 Sq.Mtrs
Office Toilet 0.02 Sq.Mtrs
Office Area 0.50 Sq.Mtrs
Meeting Room 1 0.10 Sq.Mtrs
Conference Room 0.10 Sq.Mtrs
Director Room1 0.02 Sq.Mtrs
Director Room2 0.02 Sq.Mtrs
Director Room3 0.02 Sq.Mtrs
MD Room 0.02 Sq.Mtrs
Dinning Area 0.10 Sq.Mtrs
Pantry Area 0.10 Sq.Mtrs
Male Toilet 0.10 Sq.Mtrs
Female Toilet 0.30 Sq.Mtrs
0.02 Sq.Mtrs
Total 2.52 Sq.Mtrs
NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0


SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Plenum Box&VCD Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/02 15
Approval Drawing No Date of Measurement Bill No
MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Inspetion Room,TestBench,Locker Room & Office Area
6 Plenum Box Inspection Room 0.44 Sq.Mtrs
Test Bench 2.90 Sq.Mtrs
Locker Room(Exhaust) 1.49 Sq.Mtrs
Reception Area(Supply) 0.53 Sq.Mtrs
Office Area(Supply 1) 2.11 Sq.Mtrs
Office Area(Supply 2) 2.29 Sq.Mtrs
Dinning& Pantry Area 0.88 Sq.Mtrs
Male&Female Toilet 0.70 Sq.Mtrs
Total 11.34 Sq.Mtrs

7 GI Volume Control Damber Inspection Room 0.15 Sq.Mtrs


Test Bench 0.78 Sq.Mtrs
Locker Room(Exhaust) 0.76 Sq.Mtrs
Reception Area(Supply) 0.36 Sq.Mtrs
Office Area(Supply 1) 0.60 Sq.Mtrs
Office Area(Supply 2) 0.75 Sq.Mtrs
Dinning& Pantry Area 0.27 Sq.Mtrs
Male&Female Toilet 0.51 Sq.Mtrs

Total 4.18 Sq.Mtrs


NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________
DOC. NO.: GCL-01 ISSUED DATE: REV.0
SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
Canvas Installation SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 16
Approval Drawing No Date of Measurement Bill No
MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Inspetion Room,TestBench,Locker Room & Office Area
9 Canvas (100mm Deep) Inspection Room 0.40 Sq.Mtrs
Test Bench 0.98 Sq.Mtrs
Locker Room(Exhaust) 0.80 Sq.Mtrs
Reception Area(Supply) 0.32 Sq.Mtrs
Office Area(Supply 1) 0.74 Sq.Mtrs
Office Area(Supply 2) 0.74 Sq.Mtrs
Dinning& Pantry Area 0.74 Sq.Mtrs
Male&Female Toilet 0.74 Sq.Mtrs

Total 5.46 Sq.Mtrs


NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0


SHIMIZU CORPORATION INDIA PVT LTD
No2,Prestiage Emerald,5th Floor,Levelle Road,
Madras Bank Road,Bangalore-560001,India

Project: Wipro Kawasaki Subcontractor: Sai Cool Zone


JOINT MEASUREMENT SHEET (MEASUREMENT SHEET FOR SUPPLY/INSTALLATION)
Name of Work Work Order No & Date JMS No
GI HOOD INSTALLATION SCIPL/WIPRO KAWASAKI/2018-19/PROC/AGR/023 17
Approval Drawing No Date of Measurement Bill No
MA-04,MA-05 12/18/2018
SL No Description Location Qty Unit
Factory Area,Toilet Area,Compressor Room & Pump Room
11 GI Hood Supply & Exhaust FACTORY AREA 3.05 Sq.Mtrs
FACTORY AREA 2.79 Sq.Mtrs
FACTORY AREA 2.88 Sq.Mtrs
GUARD HOUSE 1.13 Sq.Mtrs
OFFICE TOILET 0.89 Sq.Mtrs
FEMALE TOILET 0.89 Sq.Mtrs
LOADING/UNLOADING 2.08 Sq.Mtrs
PAINT AREA 2.08 Sq.Mtrs
MALE TOILET 1.03 Sq.Mtrs
PUMP ROOM 1.03 Sq.Mtrs
COMPRESSOR ROOM 12.90 Sq.Mtrs

Total 30.75 Sq.Mtrs


NOTE
1) Challans, wherever required will be attached to the JMS
2) Final measurement sheet will be supported by consumption statement
3) Cleared RFI by QA/QC to be attach for supply of material & installation works
Joint Measurement taken by :
SUB CONTRACTOR SHIMIZU CORP INDIA (P) LTD
Signature:__________ Signature:___________
Name :__________ Name : ___________
Date :__________ Date :___________

DOC. NO.: GCL-01 ISSUED DATE: REV.0