WORK SCHEDULE

Deliverable
DATE Project Name. Arrival Time Work Schedule Status Total Man Departure (Client / Sent / Not
(AM) hours Spent Time (PM) sent
Internal)
DRL CTO-V R-BLOCK STREAM-1 P&IDs INSTRUMENT
01.04.2020 DRL CTO-V 9:00:00 Inprogress 09 hrs 18:30 client not sent
BOQ PREPARATION

02.04.2020

DRL CTO-V R-BLOCK STREAM-1 P&IDs INSTRUMENT


03.04.2020 DRL CTO-V 9:00:00 COMPLETED client
BOQ PREPARATION
DRL CTO-V R-BLOCK STREAM-2 P&IDs INSTRUMENT
04.04.2020 DRL CTO-V 9:00:00 BOQ PREPARATION
Remarks
WORK SCHEDULE
Deliverable
DATE Project Name. Arrival Time Work Schedule Status Total Man Departure (Client / Sent / Not Remarks
(AM) hours Spent Time (PM) sent
Internal)

NICHINO RETROFIT INSYRUMENT BOQ


01.04.2020 NICHINO 9:00:00 Inprogress 09 hrs 18:30 client not sent
PREPARATION

02.04.2020

NICHINO RETROFIT INSTRUMENT BOQ


03.04.2020 NICHINO 9:00:00 Inprogress client
PREPARATION

03.04.2020 NICHINO 9:00:00 NICHINO RETROFIT INSTRUMENT BOQ


PREPARATION
WORK SCHEDULE
Total
Deliverable
DATE Project Name. Arrival Time Work Schedule Status Man Departure Sent /
(Client / Not sent Remarks
(AM) hours Time (PM)
Spent Internal)

1. Design Basis Document for Solar - Thermal Completed


01/11/18 HCCBPL 09:20:00AM 8 07:10:00PM
2. Site status tarcking - 720 BPM Completed
02/11/18 LEAVE
1. Scheme finalization- Solar Thermal
2. Site Activity reports updation as per dicussion held at site - 720
03/11/18 HCCBPL 08:50:00AM
BPM
On Progress 8 06:30:00PM

3. Site Status tracking -720 BPM Completed


04/11/18 SUNDAY
1. SOW & TORR Preparation - Solar Thermal On Progress
05/11/18 HCCBPL 09:10:00AM 8 08:25:00PM
2. Site Status tracking -720 BPM Completed
1. Heat Load calculations as per discussion with NSW sir.
Completed
Heat load calculation and
06/11/18 HCCBPL 09:10:00AM 8 07:30:00PM client Sent PFD is sent to clinet for
2. Scheme updation as per comments. Completed comments & approval

07/11/18 FESTIVAL HOLIDAY


1. Site Status Tracking - 720 BPM Completed
08/11/18 HCCBPL 09:10:00AM 2. ULD HandSketch and coordianting the mechanical works. - 8 06:55:00PM
Completed
Solar Thermal
1 Site Status tracking -720 BPM Completed
Sent to PMC team for
09:15:00AM 2. Site Activity reports updation - 720 BPM
Completed internal sent
09/11/18 HCCBPL 8 06:55:00PM final checking
3. Equipment location Hand sketch and to be discussed. -
Completed
Solar Thermal
10/11/18 HCCBPL 11:30:00AM Meeting with Cilent Completed 05:30:00AM
11/11/18 SUNDAY
Sent to JR sir for final
12/11/18 HCCBPL 09:30:00AM 1. MOM Preparation - Solar Thermal Completed 8 08:30:00AM internal sent
approval
1.Basis of Design Document On Progress
13/11/2018 HCCBPL 09:20:00AM 8 06:15:00PM
2. Preparation of equipment list On Progress
1.Basis of Design Document

14/11/2018 HCCBPL 09:25:00AM 2. Preparation of equipment list Completed 8 06:25:00PM


3. P&ID handsketch preparation- Solar Thermal. Completed internal
Cooordinating with Basic team forP&ID preparation - Solar
thermal
15/11/2018 HCCBPL 08:30:00AM 01:20:00PM
Sent to JR sir for final
Line size & Pressure drop Calculations - Soalr Thermal Completed internal sent approval
1. Checking P&ID - Solar thermal
16/11/2018 HCCBPL 10:30:00AM
Updation Site Activity report -720 BPM
WORK SCHEDULE
Total
Deliverable
Project Arrival Time Man Departure Sent /
DATE Work Schedule Status (Client / Remarks
Name. (AM) hours Time (PM) Not sent
Internal)
Spent
11/1/2018 INTAS 9:10:00 AM Final Fluid List Checking & Handover to Detail team inprogress 8 6:45:00 PM 6:45:00 PM
Final Process Fluid list Checking Handover to Detail team
11/2/2018 INTAS 9:10:00 AM completed 8 6:45:00 PM internal sent

11/3/2018 INTAS 9:05:00 AM Process(LSV,VP,Filters),SRP Fluid List Checking and Handover to


Detail team
WORK SCHEDULE
Deliverable
Project Arrival Time Total Man Departure Time Sent / Not
DATE Work Schedule Status (Client / Remarks
Name. (AM) hours Spent (PM) Internal) sent

PFDs Updation Inprogress


External Pipe rack routing Coordination Not started
01/Nov/18 Intas 9:10:00 AM 8 6:30:00 PM
Listing out of Critical Controls for discussion with vendor Completed

Discussion with Automation vendor Completed


02/Nov/18 Intas 9:01:00 AM 8 7:30:00 PM
Checking of Onco & Warehouse layouts Inprogress
1.Checking of Onco & Warehouse layouts Completed
Intas 2.Discussion of SRP tank farm and scheme with Not done
03/Nov/18 9:18:00 AM Walimbe sir 8 6:20:00 PM

ITC Preparation of Factory acceptance test sheet format for Inprogress


HSD and EO tanks
04/Nov/18 Sunday

Discussion of SRP & tank farm scheme with Walimbe sir Completed
05/Nov/18 Intas 9:00:00 AM
Discussion of Onco Layout with RK sir Not done
Checking of updated PFDs Inprogress
06/Nov/18 Intas 9:10:00 AM

07/Nov/18 Diwali Holiday


Checking of Onco & Warehouse layouts & sending to
client Completed Client Sent
Intas
08/Nov/18 9:05:00 AM Preparation of Schedule for process and basic Inprogress 8 7:30:00 PM
documents
key profiles and
Hyde Preparation of format for man hours calculation Not Started organogram sent to
client
Intas Preparation of Schedule for process and basic Completed
09/Nov/18 9:05:00 AM documents 8 7:30:00 PM
Hyde Preparation of format for man hours calculation Completed
10/Nov/18 Saturday
11/Nov/18 Sunday
12/Nov/18
13/Nov/18
14/Nov/18
15/Nov/18
16/Nov/18
17/Nov/18
18/Nov/18
19/Nov/18
20/Nov/18
21/Nov/18
22/Nov/18
23/Nov/18
24/Nov/18
25/Nov/18
26/Nov/18
27/Nov/18
28/Nov/18
29/Nov/18
30/Nov/18