Ques Type Option1

Question Type Answer 1


In an A-B-C system, B items typically represenMCQ 90%
Setup costs are analogous to which one of thesMCQ Shortage
If a decrease in unit price causes the average demand
MCQ rate
The to
EOQ
increase, which one of these would not increase?
Inventory carried for the purpose of providing MCQ Seasonal Inventory
The best strategy of minimizing the amount of MCQ s Minimizing the Uncertainty inheren
If EOQ = 360 units, order costs are $5 per ord MCQ 129600
EOQ is the order quantity that          over our planning horizon
MCQ Minimizing the total ordering cost
Which of the following relationships hold trueMCQ the greater the risk of running out o
__________ is the time that elapses between isMCQ Gap Time
To get the most profit a company should MCQ Provide little customer service
Inventory not only makes up a portion of the coMCQ WIP
Setup costs are similar to which costs? MCQ Shortage
Which one of the following is a true statemen MCQ The two are always equal at the EOQ
In the quantity-discount model, if the total cos MCQ holding costs are constant per unit.
If both the lead time and the daily demand are MCQ Expected demand minus safety stoc
A civil engineering project manager would typMCQ Make for stock
What system helps make calculations regardinMCQ MRP I
Manufacturing resource planning expanded outMCQ 1990
Three inputs for every MRP system are: MCQ Bill of Materials, sales forecast, sal
The outputs of a MRP II system are MCQ Capacity requirement plans / stock q
Predictive maintenance involves MCQ Performing maintenance activities i
Which type of maintenance is not directly incl MCQ Preventive
What does the term kaizen mean when appliedMCQ Continuous improvement
Which type of control chart should be used whMCQ R chart
One type of control chart for attributes is a MCQ R chart
C-charts are based on the MCQ Normal distribution
If a sample of parts is measured and the mean MCQ The process is in control, but not c
Process capability MCQ cannot be measured
The object of a statistical process control (SPCMCQ provide a signal when natural variat
The R-chart MCQ is always in control if the X-bar char
In acceptance sampling, the producer's risk is MCQ bad lot rejected
A customer service hotline has received an aveMCQ R chart
Which is the best statement regarding an operaMCQ As the fraction defective decreases,
An x-bar chart is best suited for this type of daMCQ Variable
The main task of quality control is to MCQ Distinguish assignable from random
Specifications are limits established by MCQ statistical limits
Which type of variation occurs when a processMCQ Random
Process capability calculations take into acco MCQ Process standard deviation
What type of control chart would be used to mo MCQ R chart
The task of exercising control over the incomi MCQ Acceptance sampling
Option1Mark Option2 Option2Mark

Answer 1 Mark Answer 2 Answer 2 Mark


0 70% 0
0 Holding 0
0 Lead Time 1
0 Cycle Inventory 0
1 Minimizing the cycle service level 0
0 2592 1
0 Minimizing the total carrying cost 0
0 the larger the opportunity cost of the fu 0
0 Lead Time 1
0 Provide the lowest inventory investment 0
1 finished goods 0
0 Carrying 0
1 Holding cost is sometimes equal to orde 0
0 ordering costs are constant 1
0 Safety stock 0
0 Resource to stock 1
0 MRP II 1
0 1980 1
0 Master Production Schedule, Bill of Mate 0
0 Sales order priorities / Bills of Materia 0
1 Performing maintenance on a regular, p 0
0 Breakdown 0
1 Maintain a steady flow 0
0 np chart 0
0 np chart 0
0 Poisson distribution 1
0 The process variance must also be in co 0
0 exists when CPK is less than 1.0 0
0 assess the customer expectations 0
0 is used to indicate gains or losses in un 1
0 good lot accepted 0
0 X bar chart 0
0 As the fraction defective increases, the 0
1 Attribute 0
0 Distinguish process variability from pro 0
0 The inherent process variability 0
1 Attribute 0
0 Process dispersion 1
0 np chart 0
1 Process control 0
Option3 Option3Mark Option4 Option4Mark

Answer 3 Answer 3 Mark Answer 4 Answer 4 Mark


30% 1 50% 0
Excess 0 Ordering 1
ROP 0 Safety stock 0
Safety Inventory 0 None of Above 1
Reducing the Supply lead time 0 Minimizing the Uncertainty inher 0
25920 0 18720 0
Minimizes total inventory costs 1 the required safety stock 0
the greater the uncertainty associa 0 higher the profit margin per unit, 1
Idle Time 0 Replenishment Time 0
More investment in Production 0 Provide the highest distribution co 1
Raw material 0 None of the above 0
Ordering 1 Holding 0
Holding cost is sometimes equal to 0 Holding cost is always greater tha 0
holding costs are a percentage of u 0 ordering and setup costs are equal 0
Expected demand plus safety stock 0 Daily demand times lead time 1
Make to order 0 Resource to order 0
Production Plan 0 Material scheduling 0
1970 0 1960 0
Stock on hand, Master Production 1 Sales forecast, delivery costs, cap 0
Stock quantities / Bills of Materia 1 Master Production Schedule / capa 0
Determining the best time to perf 0 None of these 0
Predictive 1 None of these 0
Quality is every ones job 0 Mutual dependence 0
P chart 0 C chart 1
P chart 1 C chart 0
Binomial distribution 0 Eriang distribution 0
The process is within the establish 0 the process is out of control and t 1
means that the natural variation o 1 exists when the process is perfect 0
provide a signal when assignable v 1 eliminate natural variation 0
generally uses control limits set a 0 is used to measure changes in the 0
bad lot accepted 0 good lot rejected 1
P chart 0 C chart 1
As the AQL decreases, the producer 1 As the lot tolerance percent defec 0
P chart 0 C chart 0
Ensure specifications are reliable 1 Control limits 0
The natural variability of a proces 0 customer requirements 1
Assignable 0 Sampling 0
Specifications 0 Control limits 0
P chart 0 C chart 1
Quality control 0 All of the above 0
CorrectAnswer Marks
Right Answer
( 1 to 5)
Option3 1
Option4 1
Option2 1
Option4 1
Option1 1
Option2 1
Option3 1
Option4 1
Option2 1
Option4 1
Option1 1
Option3 1
Option1 1
Option2 1
Option4 1
Option2 1
Option2 1
Option2 1
Option3 1
Option3 1
Option1 1
Option3 1
Option1 1
Option4 1
Option3 1
Option2 1
Option4 1
Option3 1
Option3 1
Option2 1
Option4 1
Option4 1
Option3 1
Option1 1
Option3 1
Option4 1
Option1 1
Option2 1
Option4 1