Taweelah RO Independent Water Project

ITP for Fire Fighting system( Sprinkler, Hose


Title:
reel system & Fire extinguisher )

Document
TAW-ITP-EHBF-JFZ-200-1001
code:

Rev: 00 Page: 1/4 Date: 30/03/2020

ITP for Fire Fighting System (Sprinkler, Spray, Hose reel

system & Fire extinguisher)

Revision control sheet

Rev Date Description Elaborated by Revised by Approved by

00
Prepared by
Contractor

01

Reviewed by
TDC

This document is property of EPC Company. Its total or partial reproduction is strictly forbidden by any means,
as well as its distribution to third parties without the express written consent. Any copy of this document in
digital or paper support will be considered a not control copy. The only valid copy is the last one approved
located in the document manager tool.
INSPECTION AND TEST PLAN

Taweelah RO Independent Water Project

ITP For Fire Fighting System- Sprinkler System and ITP TAW-ITP-EHBF-JFZ-200-1001 REV.
ITP TITLE Hose Reel System. 00
NO.

INSPECTION AND TEST PLAN

Quality
REFERENCE Quantity of Check Surveillance by Record Remarks
No PROJECT PHASE /
Items DOCUMENT/STA s
. TASK / ACTIVITY
NDARD HABH/STAR SEPCOII
HABH SEPCOIII/Owner Owner
S I

Sprinkler/Spray system

Sprinkler/Sp Inspection of Material Material submittals  


1 100% 100% W R R  
ray System receiving and checking. & approvals.
Permit request
2 Permit to Work 100% 100% R R R
form
3 Installation of pipes & Method of 100% 100% W W R
fittings, sprinklers, zone Statement, SDA
control valve, alarm and MIR.
check valve and drain
valve etc.
Method of
Painting and
4 Statement, SDA 100% 100% R R R  
Identification labeling.
and MIR.
Pressure Testing of
pipes & fittings,
Method of
sprinklers, zone control
5 Statement & WIR 100% 100% W W R  
valve, alarm check
valve and drain valve
etc.
Check the MOS,
WIR & pressure
test report.
(Material
approval, Site
6 Final function test survey and 100% 100% W W R  
coordinates,
Supports and guide
installation, Fit up
and weld visual
reports.)
Hose Reel system – Fire hose reel.

Inspection of Material Material submittals


7 100% 100% W R R  
receiving and checking. & approvals.
Permit request
8 Fire hose Permit to Work 100% 100% R R R  
form
reel
Installation of pipes &
cabinets, Method of
fittings, cabinets , hose
9 hose reel Statement, SDA 100% 100% W W R  
reel, landing valves,
and MIR.
gate valves etc.
10 Pressure testing of Method of 100% 100% W W R  
Statement & WIR
Material approval,
Site survey and
pipes & fittings, hose
coordinates,
reel, landing valves,
Supports and guide
gate valves etc.
installation, Fit up
and weld visual
reports.
Method of
Painting and
11 Statement, SDA 100% 100% R R R
Identification labeling.
and MIR.
Check the MOS,
WIR & pressure
test report.
(Material
approval, Site
12 Final function test survey and 100% 100% W W R
coordinates,
Supports and guide
installation, Fit up
and weld visual
reports.)
Fire Extinguisher

Inspection of Material Material submittals


13 100% 100% W R R  
receiving and checking. & approvals.
Method of
Fire Installation of fire
14 Statement, SDA 100% 100% W R R    
Extinguisher extinguisher
and MIR.
Check the MOS
15 Final function test 100% 100% W W R  
and WIR
LEGEND

MIR-Material inspection
MOS- Method of Statement WIR-Work Inspection Report SDA- Shop Drawing Approval
report

W:Witness Point(the part


H: Hold Point (the part has to
e.g. Client has to be informed S: Surveillance (random attendance at
perform this check and it is R: Document Review(the part has only
that a test is being performed site, no signature required on the Request
mandatory to stop and wait for to review the record/document that the
but its presence and For Inspection And Testing (RFI) or its
the inspector to attend the check has been done and passed)
signature is obligatory to accompanying documentation.
inspection)
move on to the next stage)