You are on page 1of 37

CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF
Page
TNU-MTO-50-001-A4 FOR CIVIL ONSHORE 1 of 37

OWNER : PT. PERTAMINA (PERSERO)

CONTRACTOR : PT. BARATA INDONESIA (PERSERO)

PROJECT NAME : PEMBANGUNAN TANGKI LPG PRESSURIZED KUPANG


KAP. 2 X 500 MT

LOCATION : TBBM TENAU, KUPANG

CONTRACT NO. : 007 / R10000 / 2019 - S3

0 10/03/2020 IFR WP ES SP
PREPARED CHECKED APPROVED CHECKED APPROVED
REV DATE STATUS
PT. BARATA INDONESIA PT. PERTAMINA
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF
Page
TNU-MTO-50-001-A4 FOR CIVIL ONSHORE 2 of 37

REVISION HISTORICAL SHEET

Rev No. Date Page Description


CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
1 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

1 LPG TANK FOUNDATION T-A


1.1 CIVIL WORK
1.1.1 Site preperation-install of bowplank and wood stiffener 122,80 m
Site Clearing 856,80 m2
Soil excavation 645,87 m3
Soil backfill and compaction 510,24 m3
1.1.2 Lean concrete & Sandbedding
Lean Concrete 42,45 m3
Sand bedding 42,45 m3
1.1.3 Concrete U ditch W=800, H=500, T=100 (one layer 10-200) 118,80 m

1.2 REINFORCED CONCRETE


1.2.1 CONCRETE FOUNDATION
1.2.1.1 FOOTING LPG TANK (8 EA)
Footing, sizes: (3500W x3000W x 500D) mm 42,00 m3
f'c = 22.83 Mpa (K-275)
Rebar = D19-150
Formwork = Plywood 12 mm thickness (once used)

1.2.1.2 PEDESTAL LPG TANK (8 EA) 50,40 m3


Pedestal: (15000W x 1500D x 2800H) mm
f'c = 22.83 Mpa (K-2750)
Rebar = 60-D22
Formwork = Plywood 12 mm thickness (once used)

1.2.1.3 GRADE BEAM AND CONC. FLOOR (8 EA)


Grade beam (500Wx700D) mm 23,80 m3
f'c = 22.83 Mpa (K-275)
Rebar = 12-D16
Formwork = Plywood 12 mm thickness (once used)

1.2.1.4 FOOTING SUPPORT-1 STARWAY


Footing, sizes: (3000W x3000W x 400D) mm 3,60 m3
f'c = 22.83 Mpa (K-275)
Rebar = D19-150
Formwork = Plywood 12 mm thickness (once used)

1.2.1.5 PEDESTAL SUPPORT-1 STARWAY 6,30 m3


Pedestal: (15000W x 1500D x 2800H) mm
f'c = 22.83 Mpa (K-2750)
Rebar = 60-D22
Formwork = Plywood 12 mm thickness (once used)

1.2.1.6 FOOTING SUPPORT-2 STARWAY 0,75 m3


Footing, sizes: (1300W x1450W x 400D) mm
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
2 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

f'c = 22.83 Mpa (K-275)


Rebar = D19-150
Formwork = Plywood 12 mm thickness (once used)

1.2.1.7 PEDESTAL SUPPORT-2 STARWAY 0,75 m3


Pedestal: (400W x 1450D x 1300H) mm
f'c = 22.83 Mpa (K-2750)
Rebar = D13-150
Formwork = Plywood 12 mm thickness (once used)

1.2.2 CONCRETE FLOOR


Concrete floor 100 mm Thk (1-layers re-bar) 73,72 m3
f'c = 22.83 Mpa (K-275)
Rebar = Wire mesh M8-150
Formwork = Plywood 12 mm thickness (once used)

2 LPG TANK FOUNDATION T-B


2.1 CIVIL WORK
2.1.1 Site preperation-install of bowplank and wood stiffener 122,80 m
Site Clearing 856,80 m2
Soil excavation 411,67 m3
Soil backfill and compaction 432,96 m3
2.1.2 Lean concrete & Sandbedding
Lean Concrete 7,68 m3
Sand bedding 7,68 m3
2.1.3 Concrete U ditch W=800, H=500, T=100 (one layer 10-200) - m

2.2 REINFORCED CONCRETE


2.2.1 CONCRETE FOUNDATION
2.2.1.1 FOOTING LPG TANK (8 EA)
Footing, sizes: (3500W x3000W x 500D) mm 42,00 m3
f'c = 22.83 Mpa (K-275)
Rebar = D19-150
Formwork = Plywood 12 mm thickness (once used)

2.2.1.2 PEDESTAL LPG TANK (8 EA) 50,40 m3


Pedestal: (15000W x 1500D x 2800H) mm
f'c = 22.83 Mpa (K-2750)
Rebar = 60-D22
Formwork = Plywood 12 mm thickness (once used)

2.2.1.3 GRADE BEAM AND CONC. FLOOR (8 EA)


Grade beam (500Wx700D) mm 23,80 m3
f'c = 22.83 Mpa (K-275)
Rebar = 12-D16
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
3 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Formwork = Plywood 12 mm thickness (once used)

2.2.1.4 FOOTING SUPPORT-1 STARWAY


Footing, sizes: (3000W x3000W x 400D) mm 3,60 m3
f'c = 22.83 Mpa (K-275)
Rebar = D19-150
Formwork = Plywood 12 mm thickness (once used)

2.2.1.5 PEDESTAL SUPPORT-1 STARWAY 6,30 m3


Pedestal: (15000W x 1500D x 2800H) mm
f'c = 22.83 Mpa (K-2750)
Rebar = 60-D22
Formwork = Plywood 12 mm thickness (once used)

2.2.1.6 FOOTING SUPPORT-2 STARWAY 0,75 m3


Footing, sizes: (1300W x1450W x 400D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D19-150
Formwork = Plywood 12 mm thickness (once used)

2.2.1.7 PEDESTAL SUPPORT-2 STARWAY 0,75 m3


Pedestal: (400W x 1450D x 1300H) mm
f'c = 22.83 Mpa (K-2750)
Rebar = D13-150
Formwork = Plywood 12 mm thickness (once used)

2.2.2 CONCRETE FLOOR


Concrete floor 100 mm Thk (1-layers re-bar) 73,72 m3
f'c = 22.83 Mpa (K-275)
Rebar = Wire mesh M8-150
Formwork = Plywood 12 mm thickness (once used)

3 WATER TANK FOUNDATION


3.1 CIVIL WORK
3.1.1 Site preperation-install of bowplank and wood stiffener 76,00 m
Site Clearing 361,00 m
Soil excavation 3.312,83 m3
gravel backfill and compaction 1000 thick 497,34 m3
Soil backfill and compaction 2.637,24 m3
3.1.2 Lean concrete & Sandbedding
Lean Concrete 100 thick 10,51 m3
Sand bedding 100 thick 10,51 m3
Asphalt concrete 100 thick 15,80 m3
Sand Stone 100 thick 15,80 m3
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
4 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

3.2 REINFORCED CONCRETE


3.2.1 CONCRETE FOUNDATION
3.2.1.1 FOOTING WATER TANK
FOOTING 2500W, 600 H, PCD 16000 63,06 m3
f'c = 22.83 Mpa (K-275)
Rebar = 23-D19 (rot), D13-100
Formwork = Plywood 12 mm thickness (once used)

3.2.1.2 PEDESTAL WATER TANK


PEDESTAL 800W, 2800 H, PCD 16000 94,17 m3
f'c = 22.83 Mpa (K-275)
Rebar = D16-200, 15D-19 (rot)
Formwork = Plywood 12 mm thickness (once used)

4 DIESEL OIL STORAGE TANK FOUNDATION


4.1 CIVIL WORK
4.1.1 Site preperation-install of bowplank and wood stiffener 23,30 m
Site Clearing 7,80 m2
Soil excavation 23,97 m3
Soil backfill and compaction 19,28 m3
4.1.2 Lean concrete & Sandbedding
Lean Concrete 100 thick 0,42 m3
Sand bedding 100 thick 2,17 m3

4.2 REINFORCED CONCRETE


4.2.1 CONCRETE FOUNDATION
4.2.1.1 FOOT PLATE DIESEL OIL STORAGE TANK FOUNDATION
Foot plate, sizes: (3250W x 2400L x 400D) mm 3,12 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)

4.2.1.2 PEDESTAL DIESEL OIL STORAGE TANK FOUNDATION


Pedestal: (1400W x 400D x 1450H) mm 1,62 m3
f'c = 22.83 Mpa (K-2750)
Rebar = 32-D13
Formwork = playwood 12 mm thickness (once used)

4.2.2 CONCRETE FLOOR 2,67 m3


Concrete floor 200 mm Thk (2-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = D10-200 one layer
Formwork = Plywood 12 mm thickness (once used)

5 WATER PIT (3m W x 3m L x 2.5m D)


CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
5 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

5.1 CIVIL WORK


5.1.1 Site preperation-install of bowplank and wood stiffener 20,00 m
Site Clearing 25,00 m2
Soil excavation 48,00 m3
Soil backfill and compaction 16,60 m3

5.1.2 Lean concrete & Sandbedding


Lean Concrete 50 thick 0,48 m3
Sand bedding 50 thick 0,48 m3

5.2 REINFORCED CONCRETE


5.2.1 CONCRETE FLOOR AND WALL
5.2.1.1 CONCRETE FLOOR
Concrete floor 200 mm Thk (2-layers re-bar) 7,20 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)

5.2.1.2 CONCRETE WALL


Concrete wall 200 mm Thk (2-layers re-bar) 1,88 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)

5.3 STEEL STRUCTURE


Hand rail pipe 2'' 174,08 kg
Hand rail pipe 1'' 28,00 kg

Painting Steel structure 7,24 m2

6 LPG PUMP SHELTER Size: (6W x 10L) M


6.1 CIVIL WORK
6.1.1 Site preperation-install of bowplank and wood stiffener 48,00 m
Site Clearing 140,00 m2
Soil excavation 645,87 m3
Soil backfill and compaction 510,24 m3
6.1.2 Lean concrete & Sandbedding
Lean Concrete 42,45 m3
Sand bedding 42,45 m3
6.1.3 Concrete U ditch W=800, H=500, T=100 (one layer 10-200) 118,80 m

6.2 REINFORCED CONCRETE


6.2.1 SHELTER FOUNDATION
6.2.1.1 FOOT PLATE
f'c = 22.83 Mpa (K-275) 4,08 m3
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
6 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

6.2.1.2 PEDESTAL 1,47 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D16, D10-200
Formwork = playwood 12 mm thickness (one used)

6.2.1.2 GRADE BEAM


f'c = 22.83 Mpa (K-275) 4,28 m3
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)

6.2.2 CONCRETE FLOOR


6.2.2.1 Conc. floor 150 mm Thk (2-layer bar) 9,00 m3
f'c = 22.83 Mpa (K-275)
Rebar = D10-150
Formwork = playwood 12 mm thickness (one used)

6.2.2.2 Terrace Conc. floor 70 mm Thk (1-layer bar) 1,68 m3


f'c = 22.83 Mpa (K-275)
Rebar =D8-150
Formwork = playwood 12 mm thickness (one used)

6.2.2.3 Terrace Conc. floor 70 mm Thk (1-layer bar) 1,20 m3


f'c = 22.83 Mpa (K-275)
Rebar =8-150
Formwork = playwood 12 mm thickness (one used)

6.2.3 EQUIPMENT FOUNDATION


Pump Foundation (2.5m x1,38m x 0.6mThk) 2 unit 4,14 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = playwood 12 mm thickness (one used)

6.3 STEEL STRUCTURE


6.3.1 Steel structure
Column 718,20 kg
Lateral Beam 383,40 kg
Rafter 383,40 kg
Overhange Rafter 84,00 kg
Purlin Lip.Channel 946,26 kg
Sagrod dia 10 mm 14,80 kg
Wind Brace dia 16 mm 41,67 kg
Gutter frame plate bar 22,40 kg
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
7 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Base plate 16 mm thk. 16,28 kg


End plate 14 mm thk 101,55 kg
Stiffener plate 8 mm thk 62,80 kg
Cleat Plate , 8 mm thk 20,35 kg
Anchor bolt Dia M16 24,00 Ea
HTB Dia 16 mm A325 186,00 Ea
BB Dia 12 mm A325 120,00 Ea

6.3.2 Roof and wall


Roof corrugated metal sheet, Galvalume 0.55 mm thk 108,50 m2
efective wide 950 mm, heigth of wave 38 mm

Wall Clading corrugated metal sheet, Galvalume 0.55 mm thk 20,80 m2


efective wide 950 mm, heigth of wave 38 mm

Wall Clading corrugated metal sheet, Galvalume 0.55 mm thk 27,08 m2


efective wide 950 mm, heigth of wave 38 mm

6.3.3 Flashing, Gutter and Downspout, Fascia


Ridge cap 12,40 m'
Gutter metal sheet 24,80 m'
Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps 50,29 m'
Roof drain galv. Stl. strainer 6,00 ea

6.3.4 Painting Steel structure 106,32 m2

7 FIRE WATER PUMP SHELTER Size: (6W x 10L) M


7.1 CIVIL WORK
7.1.1 Site preperation-install of bowplank and wood stiffener 48,00 m
Site Clearing 140,00 m2
Soil excavation 140,00 m2
Soil backfill and compaction 510,24 m3
7.1.2 Lean concrete & Sandbedding
Lean Concrete 42,45 m3
Sand bedding 42,45 m3
7.1.3 Concrete U ditch W=800, H=500, T=100 (one layer 10-200) 118,80 m

7.2 REINFORCED CONCRETE


7.2.1 SHELTER FOUNDATION
7.2.1.1 FOOT PLATE
f'c = 22.83 Mpa (K-275) 4,08 m3
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

7.2.1.2 PEDESTAL 1,47 m3


CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
8 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

f'c = 22.83 Mpa (K-275)


Rebar = 8-D16
Formwork = playwood 12 mm thickness (one used)

7.2.1.2 GRADE BEAM


f'c = 22.83 Mpa (K-275) 4,28 m3
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)

7.2.2 CONCRETE FLOOR


7.2.2.1 Conc. floor 150 mm Thk (2-layer bar) 9,00 m3
f'c = 22.83 Mpa (K-275)
Rebar =10-150
Formwork = playwood 12 mm thickness (one used)

7.2.2.1 Terrace Conc. floor 70 mm Thk (1-layer bar) 1,68 m3


f'c = 22.83 Mpa (K-275)
Rebar =8-150
Formwork = playwood 12 mm thickness (one used)

7.2.2.1 Terrace Conc. floor 70 mm Thk (1-layer bar) 1,20 m3


f'c = 22.83 Mpa (K-275)
Rebar =8-150
Formwork = playwood 12 mm thickness (one used)

7.2.3 EQUIPMENT FOUNDATION


7.2.3.1 Fire Pump Foundation (2.5m x1,0 m x 0.5mThk) 2 unit 2,50 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = playwood 12 mm thickness (one used)

7.2.3.2 Jockey Pump Foundation (2.5m x1,38m x 0.6mThk) 1 unit 0,42 m3


f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = playwood 12 mm thickness (one used)

7.3 STEEL STRUCTURE


1.3.1 Steel structure
Column 718,20 kg
Lateral Beam 383,40 kg
Rafter 383,40 kg
Overhange Rafter 84,00 kg
Purlin Lip.Channel 946,26 kg
Sagrod dia 10 mm 14,80 kg
Wind Brace dia 16 mm 41,67 kg
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
9 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Gutter frame plate bar 22,40 kg


Base plate 16 mm thk. 16,28 kg
End plate 14 mm thk 101,55 kg
Stiffener plate 8 mm thk 62,80 kg
Cleat Plate , 8 mm thk 20,35 kg
Anchor bolt Dia M16 24,00 Ea
HTB Dia 16 mm A325 186,00 Ea
BB Dia 12 mm A325 120,00 Ea

7.3.2 Roof and wall


Roof corrugated metal sheet, Galvalume 0.55 mm thk 108,50 m2
efective wide 950 mm, heigth of wave 38 mm

Wall Clading corrugated metal sheet, Galvalume 0.55 mm thk 20,80 m2


efective wide 950 mm, heigth of wave 38 mm

Wall Clading corrugated metal sheet, Galvalume 0.55 mm thk 27,08 m2


efective wide 950 mm, heigth of wave 38 mm

7.3.3 Flashing, Gutter and Downspout, Fascia


Ridge cap 12,40 m'
Gutter metal sheet 24,80 m'
Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps 50,29 m'
Roof drain galv. Stl. strainer 6,00 ea

7.3.4 Painting Steel structure 106,32 m2

8 INSTRUMENT AIR SHELTER, Size: (5W x 6L) M


8.1 CIVIL WORK
8.1.1 Site preperation-install of bowplank and wood stiffener 30,00 m
Site Clearing 38,50 m2
Soil excavation 30,55 m3
Soil backfill and compaction 19,31 m3
8.1.2 Lean concrete & Sandbedding
Lean Concrete 5,59 m3
Sand bedding 5,59 m3
8.1.3 Concrete U ditch W=300, H=400, T=100 (one layer 10-200) 32,00 m

8.2 REINFORCED CONCRETE


8.2.1 Shelter Foundation
Foot plate size: (1.3 W x 1.3 L x 0.3Thk) M 2,57 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
10 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Pedestal size: (0.35W x 0.35L x 1.3Depth) M 0,64 m3


f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)

Grade beam (250Wx400D) mm 1,00 m3


f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)

Grade beam (250Wx400D) mm 1,20 m3


f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)

8.2.2 Concrete Floor


Conc. floor 150 mm Thk (1-layer bar) 4,50 m3
f'c = 22.83 Mpa (K-275)
Rebar =M10-150
Formwork = playwood 12 mm thickness (once used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 0,80 m3


f'c = 22.83 Mpa (K-275)
Rebar =M10-150
Formwork = playwood 12 mm thickness (one used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 0,50 m3


f'c = 22.83 Mpa (K-275)
Rebar = M10-150
Formwork = playwood 12 mm thickness (one used)

8.2.3 Equipment Foundation


Comppresoor Air Foundation (4,3m x2,7m x 0.6mThk) 1 unit 0,50 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

Air Instreument Tank Foundation


Foot Plate (3m x3m x 0.5mThk) 4,50 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

Pedestal size: (0.35W x 0.35L x 1.3Depth) M 0,71 m3


f'c = 22.83 Mpa (K-275)
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
11 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

8.3 STRUCTURAL STEEL


8.3.1 Steel structure
Column WF-200x200x8x12 938,12 kg
Lateral Beam
Beam 2L 50X50X5 172,80 kg
Angle L50x50x5 60,48 kg
Angle L50x50x5 36,00 kg
Rafter WF-200x100x5.5x8 204,48 kg
Overhange Beam WF-150x75X5x7 56,00 kg
Purlin Lip.Channel C-150x65x20x2.3 480,64 kg
Sagrod dia 10 mm 13,32 kg
Wind Brace dia 16 mm 39,77 kg
Fascia frame angle L50x50x4 145,66 kg
Gutter frame flat-bar 30x3 128,00 kg
Base plate 16 mm thk. 26,58 kg
End plate 14 mm thk 33,85 kg
End plate 14 mm thk 11,21 kg
Stiffener plate 8 mm thk 8,69 kg
Stiffener plate 7 mm thk 2,09 kg
Cleat Plate 135mmx120mm, 8mm thk 16,28 kg
Anchor bolt Dia 16 16,00 Ea
HTB Dia 16 mm A325 100,00 Ea
BB Dia 12 mm A325 64,00 Ea

8.3.2 Roof and wall


Roof corrugated metal sheet, Galvalume 0.55 mm thk 59,20 m2
efective wide 950 mm, heigth of wave 38 mm

8.3.3 Flashing, Gutter and Downspout


Ridge cap 8,00 m
Gutter metal sheet 16,00 m
Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps 22,00 m
Roof drain galv. Stl. strainer 4,00 Ea
Fascia (zincalume) 16,00 m2

8.3.4 Painting Steel structure 104,06 m2

9 METERING SHELTER, Size: (4W x 8L) M


9.1 CIVIL WORK
9.1.1 Site preperation-install of bowplank and wood stiffener 32,00 m
Site Clearing 60,00 m2
Soil excavation 84,35 m3
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
12 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Soil backfill and compaction 60,70 m3


9.1.2 Lean concrete & Sandbedding
Lean Concrete 7,73 m3
Sand bedding 7,73 m3
9.1.3 Concrete U ditch W=300, H=400, T=100 (one layer 10-200) 26,00 m

9.2 REINFORCED CONCRETE


9.2.1 SHELTER FOUNDATION
Foot plate size: (1.5 W x 1.5 L x 0.3Thk) M 4,05 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = playwood 12 mm thickness (once used)

Pedestal size: (0.25W x 0.35L x 1.0 Depth) M 0,53 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D13, D10-200
Formwork = playwood 12 mm thickness (once used)

Grade beam (250Wx400D) mm 2,40 m3


f'c = 22.83 Mpa (K-275)
Rebar = 4-D13
Formwork = playwood 12 mm thickness (once used)

9.2.2 CONCRETE FLOOR


Conc. floor 150 mm Thk (2-layer bar) 4,80 m3
f'c = 22.83 Mpa (K-275)
Rebar =D10-100
Formwork = playwood 12 mm thickness (once used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 1,00 m3


f'c = 22.83 Mpa (K-275)
Rebar =M8-100
Formwork = playwood 12 mm thickness (once used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 0,40 m3


f'c = 22.83 Mpa (K-275)
Rebar = M8-100
Formwork = playwood 12 mm thickness (once used)

9.2.3 EQUIPMENT FOUNDATION


Metering Foundation (7,05m x1,3m x 0.4mThk) 1 unit 3,67 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-100
Formwork = playwood 12 mm thickness (one used)
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
13 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

9.3 STRUCTURAL STEEL


9.3.1 Steel structure
Column SH-200x100x5.5x8 472,86 kg
Lateral Beam SH-150x75x5x7 224,00 kg
Rafter SH-150x75x5x7 168,00 kg
Overhange Beam SH-150x75x5x7 84,00 kg
Purlin Lip.Channel C-150x50x20x2.3 405,60 kg
Sagrod dia 10 mm 14,80 kg
Wind Brace dia 16 mm 51,77 kg
Gutter frame flat-bar 30x3 160,00 kg
Base plate 24 mm thk. 56,52 kg
End plate 12 mm thk 67,82 kg
Stiffener plate 6 mm thk 8,07 kg
Cleat Plate 135mmx120mm 12,21 kg
Anchor bolt Dia 22 24,00 Ea
HTB Dia 14 mm A325 144,00 Ea
HTB Dia 14 mm A325 32,00 Ea
BB Dia 12 mm A325 48,00 Ea

9.3.2 Roof and Wall


Roof corrugated metal sheet, Galvalume 0.55 mm thk 104,00 m2
efective wide 950 mm, heigth of wave 38 mm

9.3.3 Flashing, Gutter and Downspout


Ridge cap 10,00 m
Gutter metal sheet 20,00 m
Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps 24,00 m
Roof drain galv. Stl. strainer 6,00 Ea
Harmonica wire fence + frame angle 50x50x5 46,40 m2

9.3.4 Painting Steel structure 78,95 m2

10 ODORIZER SHELTER, Size: (4W x 5L) M


10.1 CIVIL WORK
10.1.1 Site preperation-install of bowplank and wood stiffener 26,00 m
Site Clearing 20,00 m2
Soil excavation 24,10 m3
Soil backfill and compaction 19,22 m3
10.1.2 Lean concrete & Sandbedding
Lean Concrete 1,38 m3
Sand bedding 1,38 m3
10.1.3 Concrete U ditch W=300, H=400, T=100 (one layer 10-200) 26,00 m

10.2 REINFORCED CONCRETE


10.2.1 SHELTER FOUNDATION
Foot plate size: (1.5W x 1.5L x 0.3Thk) M 1,01 m3
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
14 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

f'c = 22.83 Mpa (K-275)


Rebar = D13-200
Formwork = playwood 12 mm thickness (once used)

Pedestal size: (0.25W x 0.25L x 1.0 Depth) M 0,25 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (once used)

Grade beam (250Wx300D) mm 0,30 m3


f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (once used)

10.2.2 CONCRETE FLOOR


Conc. floor 150 mm Thk (2-layer bar) 3,00 m3
f'c = 22.83 Mpa (K-275)
Rebar =D10-125 (2 layer)
Formwork = playwood 12 mm thickness (once used)

10.2.3 EQUIPMENT FOUNDATION


Metering Foundation (7,05m x1,3m x 0.4mThk) 1 unit 1,44 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-100
Formwork = playwood 12 mm thickness (one used)

10.3 STRUCTURAL STEEL


10.3.1 Steel structure
Column WF-150x150x7x10 176,40 kg
Lateral Beam WF-150x75x5x7 56,00 kg
Rafter WF-150x75x5x7 112,00 kg
Purlin Lip.Channel C-150x65x20x2.3 225,30 kg
Sagrod dia 10 mm 2,47 kg
Wind Brace dia 16 mm 27,15 kg
Gutter frame flat-bar 30x3 40,00 kg
Base plate 16 mm thk. 8,14 kg
End plate 14 mm thk 13,19 kg
Stiffener plate 7 mm thk 2,09 kg
Cleat Plate 135mmx120mm 12,21 kg
Anchor bolt Dia 16 8,00 Ea
HTB Dia 16 mm A325 40,00 Ea
BB Dia 12 mm A325 48,00 Ea

10.3.2 Roof and Wall


Roof corrugated metal sheet, Galvalume 0.55 mm thk 20,00 m2
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
15 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

efective wide 950 mm, heigth of wave 38 mm

10.3.3 Flashing, Gutter and Downspout


Ridge cap - m
Gutter metal sheet 5,00 m
Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps 6,00 m
Roof drain galv. Stl. strainer 2,00 Ea

10.3.3 Painting Steel structure 33,45 m2

11 WEIGHT BRIDGE SHELTER, Size: (7W x 12L) M


11.1 CIVIL WORKS
11.1.1 Site preperation-install of bowplank and wood stiffener 56,00 m
Site Clearing 196,00 m2
Soil excavation 206,10 m3
11.1.2 Soil backfill and compaction 196,27 m3
Lean concrete & Sandbedding
Lean Concrete 7,63 m3
Sand bedding 7,63 m3
11.1.3 Concrete U ditch W=800, H=500, T=100 (one layer 10-200) 46,00 m

11.2 REINFORCED CONCRETE


11.2.1 SHELTER FOUNDATION
Foot plate fnd 30,69 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

Pedestal 3,37 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

Grade beam 3,60 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)

Conc. Floor 7,06 m3


f'c = 25 Mpa (K-300)
Rebar = M10-150 (two layers)
Formwork = playwood 12 mm thickness (one used)

Conc. Separator 7,00 m3


f'c = 22.83 Mpa (K-275)
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
16 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)
Weight bridge Foundation

Pile cap, 6,05 m3


f'c = 22.83 Mpa (K-275)
Rebar = D16-150
Formwork = playwood 12 mm thickness (one used)

Side wall 6,40 m3


f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = playwood 12 mm thickness (one used)

Front and back wall 4,48 m3


f'c = 22.83 Mpa (K-275)
Rebar = D16-150
Formwork = playwood 12 mm thickness (one used)
Slab Foundation 12,00 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = playwood 12 mm thickness (one used)

BARRIER
Barrier Wall 0,60 m3
f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)

Barrier Wall 0,27 m3


f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)

Barrier Slab
f'c = 22.83 Mpa (K-275) 0,45 m3
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)

11.3 STRUCTURAL STEEL


11.3.1 Steel structure
Column WF-300x300x10x15 3.102,00 kg
Lateral Beam
Beam UNP100X50X5X7.5 411,84 kg
Angle L50x50x5 162,86 kg
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
17 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Angle L50x50x5 75,40 kg


Rafter SH-350x175x7x11 982,08 kg
Beam (RIDGE) UNP- 200x80x7.5x11 295,20 kg
Overhange Beam SH-200x100x5.5x8 127,80 kg
Purlin Lip.Channel C-150x65x20x2.3 943,26 kg
Sagrod dia 10 mm 22,19 kg
Wind Brace dia 16 mm 55,24 kg
Fascia frame angle C100x50x20x3.2 862,40 kg
Gutter frame flat-bar 30x3 376,80 kg
Base plate 16 mm thk. 82,07 kg
End plate 18 mm thk 94,00 kg
End plate 14 mm thk 25,39 kg
Stiffener plate 11 mm thk 28,55 kg
Stiffener plate 8 mm thk 6,52 kg
Cleat Plate 135mmx120mm, 8 mm thk 24,42 kg
Anchor bolt Dia 22 32,00 Ea
HTB Dia 20 mm A325 60,00 Ea
HTB Dia 16 mm A325 60,00 Ea
BB Dia 12 mm A325 96,00 Ea

11.3.2 Grating
Strip plat 5mmx50mm 46,40 m
Strip plat 5mmx25mm 55,00 m

11.3.3 Roof and Wall


Roof corrugated metal sheet, Galvalume 0.55 mm thk 122,46 m2
efective wide 950 mm, heigth of wave 38 mm

11.3.4 Flashing, Gutter and Downspout


Ridge cap 15,70 m
Gutter metal sheet 31,40 m
Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps 36,00 m
Roof drain galv. Stl. strainer 6,00 Ea
Fascia ACP 4mm thk 132,30 m2

11.3.5 Painting Steel structure 459,34 m2

12 WEIGHT BRIDGE HOUSE KEEPER


12.1 CIVIL WORKS
12.1.1 Site preperation-install of bowplank and wood stiffener 23,00 m
Site Clearing 33,00 m2
Soil excavation 60,43 m3
Soil backfill and compaction 59,73 m3
12.1.2 Lean concrete & Sandbedding
Lean Concrete 3,09 m3
Sand bedding 3,09 m3
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
18 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

12.1.3 Concrete U-ditch


Concrete U ditch W=300, H=400, T=100 (one layer 10-200) 25,00 m
Concrete U ditch W=400, H=400, T=100 (one layer 10-200) 26,50 m

12.2 ARCHITECTURE & FINISHING WORK


12.2.1 Brickwall, Plastering & Smooth surface plastering ('acian')
Brickwall and thin bed mortar, size: (3.38 mtr H x150mm thk) . 41,74 m2
Plastering & smooth surface, 15mm thk 83,48 m2
12.2.2 Floor and Wall Finishes
Supply and install glazed ceramic tiles (or equal approved) sizes
12,75 m2
(400x400)mm
Supply and install un-glazed ceramic tiles sizes (200x200)mm, on
1,25 m2
toilet room
12.2.3 Wall Finishes ceramic tile fixed w/mortar and tile grout
Supply and install glazed ceramic tiles sizes (200x250) mm, hight:
12,00 m2
2.1 m on wall rooms: toilet
12.2.4 Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint
and all necessary fixing
12.2.4 accessories as specified
Acoustic Mineral Fiber Board size (600x600) mm or (600x1200)
14,00 m2
mm of 15mm th'k (min.)
Moisture resistance mineral Fiber Board or 6mm th'k Glass
19,00 m2
Reinforced Concrete (GRC) board
12.2.4 Painting Works and Coating
Prepare and apply one coat primer and two finishing coats of
41,74 m2
emulsion paint to interior surface
Prepare and apply one coat primer and two finishing coats of
41,74 m2
watershield emulsion paint to exterior surface
Prepare and apply waterproofing finishing coats to top of concrete
17,10 m2
roof surface
12.2.4 Doors and Windows...c/w all necessary fixing accessories.
Glass door & hot-dipgalvanized aluminum frame matterial
Clear glass door, single leaf, swing opening, and size: (0.7 m W)
1,00 Unit
x 2.1 m H, location at Entrance
Glass windows& deep galvanized aluminium matterial
Tempered glass fix thick 5mm include weather sealer rubber, and
1,00 Unit
size: 1.35 m W x 3.5m H location at locket
Tempered glass fix thick 5 mm include weather sealer rubber, and
1,00 Unit
size: 1.2 m W x 1.35 m
PVC panel door and frame...c/w all necessary fixing accessories. 1,00 Unit
Exhaus fan 1,00 Unit

12.3 SANITARY FIXTURES


Supply and install sanitary ex….. Appliances complete including
all necessary fitting accessories.
Closet (seat type) 1,00 Set.
Jet washer 1,00 Set.
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
19 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Roof drain
Downspout PVC pipe 4" dia. & fittings 18,00 m
Strainer/ roof filter 4,00 Set.
Plumbing
Conc. Septicktank and absorption system (2m L x 1.5m W x
1,00 Lot
2.150m H, Thickness : 150 mm)
pipe 2" dia. & fittings 6,00 m
pipe 4" dia. & fittings 4,00 m

12.4 REINFORCED CONCRETE


Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M 2,02 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

Pedestal size: (0.2W x 0.2L x 1.15) Depth) M 0,18 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)

Grade beam (200Wx300D) mm 0,42 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)

Grade beam (200Wx300D) mm 0,96 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)

Column : (200W x 200D x 3500H) mm 0,64 m3


f'c = 22.8 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)

Main-beam (200Wx300D) mm 0,42 m3


f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)

Main-beam (200Wx300D) mm 0,48 m3


f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)

cantilever-beam (200Wx250D) mm 0,50 m3


CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
20 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

f'c = 22.83 Mpa (K-275)


Rebar = 4-D13
Formwork = playwood 12 mm thickness (one used)

Concrete floor 100 mm Thk (1-layers re-bar) 1,40 m3


f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)

Concrete Roof 120 mm Thk (2-layers re-bar) 3,30 m3


f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 1,20 m3


f'c = 22.83 Mpa (K-275)
Rebar =M8-150
Formwork = playwood 12 mm thickness (one used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 0,70 m3


f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)

Terrace stiffener beam (150W x 200D)mm 0,36 m3


f'c = 22.83 Mpa (K-275)
Rebar = 4-D10
Formwork = playwood 12 mm thickness (one used)

Terrace stiffener beam (150W x 250D)mm 0,33 m3


f'c = 22.83 Mpa (K-275)
Rebar = 4-D10
Formwork = playwood 12 mm thickness (one used)

13 GENSET SHELTER, Size: (5W x 6L) M


13.1 CIVIL WORK
13.1.1 Site preperation-install of bowplank and wood stiffener 40,00 m
Site Clearing 64,00 m2
Soil excavation 78,97 m3
Soil backfill and compaction 56,13 m3
13.1.2 Lean concrete & Sandbedding
Lean Concrete 11,83 m3
Sand bedding 11,83 m3
13.1.3 Concrete U ditch W=300, H=400, T=100 (one layer 10-200) 34,00 m
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
21 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

13.2 REINFORCED CONCRETE


13.2.1 SHELTER FOUNDATION
13.2.1.1 Foot plate size: (1.5W x 1.5L x 0.3Thk) M 2,70 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (once used)

13.2.1.1 Pedestal size: (0,35W x 0.35L x 1.3Thk) M 0,64 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (once used)

13.2.1.1 Grade beam size: (0,2W x 6L x 0.4Thk) M 0,96 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (once used)

13.2.1.1 Grade beam 2 size: (0,2W x 5L x 0.4Thk) M 0,80 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (once used)

13.2.2 CONCRETE FLOOR


13.2.2.1 Conc. floor 150 mm Thk (1-layer bar) 1,44 m3
f'c = 22.83 Mpa (K-275)
Rebar =M8-150
Formwork = playwood 12 mm thickness (once used)

13.2.2.1 Terrace Conc. floor 100 mm Thk (1-layer bar) 1,44 m3


f'c = 22.83 Mpa (K-275)
Rebar =M8-150
Formwork = playwood 12 mm thickness (once used)

13.2.2.2 Terrace Conc. floor 100 mm Thk (1-layer bar) 1,44 m3


f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)

13.2.3 EQUIPMENT FOUNDATION


13.2.3.1 Genset Foundation (4,6m x1,8m x 0.65mThk) 2 unit 10,76 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-125
Formwork = Plywood 12 mm thickness (once used)

13.2.4 CACLE TRENCH


CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
22 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Cacle Trench 1 (2,3m x0,5m x 1mThk) 2 unit 1,15 m3


f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = Plywood 12 mm thickness (once used)

Cacle Trench 1 (4m x0,7m x 1mThk) 1 unit 1,08 m3


f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = Plywood 12 mm thickness (once used)

13.3 STRUCTURAL STEEL


13.3.1 Steel structure
Column WF-150x150x7x10 1.234,80 kg
Lateral Beam WF-200x100x5.5x8 894,60 kg
Rafter WF-200x100x5.5x8 894,60 kg
Overhange Beam WF-200x100x5.5x8 298,20 kg
Purlin Lip.Channel C-150x65x20x2.3 2.207,94 kg
Sagrod dia 10 mm 14,80 kg
Wind Brace dia 16 mm 40,40 kg
Gutter frame flat-bar 30x3 470,40 kg
Base plate 16 mm thk. 16,28 kg
End plate 14 mm thk 50,77 kg
Stiffener plate 8 mm thk 13,03 kg
Cleat Plate 135mmx120mm, 8 mm thk 20,35 kg
Anchor bolt Dia 22 16,00 Ea
HTB Dia 16 mm A325 100,00 Ea
BB Dia 12 mm A325 80,00 Ea

13.3.2 Grating
Strip plat 5mmx25mm 46,40 m

13.3.3 Roof and Wall


Roof corrugated metal sheet, Galvalume 0.55 mm thk 72,24 m2
efective wide 950 mm, heigth of wave 38 mm

13.3.4 Flashing, Gutter and Downspout


Ridge cap 8,40 m
Gutter metal sheet 16,80 m
Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps 24,00 m
Roof drain galv. Stl. strainer 4,00 Ea

Painting Steel structure 94,20 m2

14 MCC BUILDING, Size: (4.5W x 10.5L) M


14.1 CIVIL WORKS
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
23 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

14.1.1 Site preperation-install of bowplank and wood stiffener 31,50 m


Site Clearing 81,25 m2
Soil excavation 240,97 m3
Soil backfill and compaction 231,42 m3
14.1.2 Lean concrete & Sandbedding
Lean Concrete 6,10 m3
Sand bedding 6,10 m3
14.1.3 Concrete U ditch W=300, H=400, T=100 (one layer 10-200) 40,00 m

15.2 ARCHITECTURE & FINISHING WORK


Brickwall, Plastering & Smooth surface plastering ('acian')
Brickwall and thin bed mortar, size: (3.7mtr H x150mm thk) . 118,48 m2
Plastering & smooth surface, 15mm thk 236,96 m2
Floor and Wall Finishes
Supply and install glazed ceramic tiles (or equal approved) sizes
42,09 m2
(300x300)mm
Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint
and all necessary fixing
accessories as specified
Acoustic Mineral Fiber Board size (600x600) mm or (600x1200)
47,25 m2
mm of 15mm th'k (min.)
Moisture resistance mineral Fiber Board or 6mm th'k Glass
34,00 m2
Reinforced Concrete (GRC) board
Painting Works and Coating
Prepare and apply one coat primer and two finishing coats of
118,48 m2
emulsion paint to interior surface
Prepare and apply one coat primer and two finishing coats of
118,48 m2
watershield emulsion paint to exterior surface
Prepare and apply waterproofing finishing coats to top of concrete
68,25 m2
roof surface
Doors and Windows...c/w all necessary fixing accessories.
steel door fnish paint
Steel door, double leaf, swing opening, and size: (1m W) x 2.1 m
1,00 Unit
H, location at: panel MCC room
Steel door, double leaf, swing opening, and size: (1m W) x 2.1 m
1,00 Unit
H, location at: battery room
Exhaust fan 2,00 Unit

14.2 SANITARY FIXTURES


Roof drain 30,00 m
Downspout PVC pipe 4" dia. & fittings 6,00 Set.
Strainer/ roof filter

14.3 REINFORCED CONCRETE


FOOT PLATE
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
24 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Foot plate-1, sizes: (1650W x 1650L x 350D) mm 7,62 m3


f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = Plywood 12 mm thickness (once used)

PEDESTAL
Pedestal : (300W x 300D x 1650H) mm 1,19 m3
f'c = 22.83 Mpa (K-275)
Rebar = 8-D16
Formwork = Plywood 12 mm thickness (once used)

COLUMN
Column : (300W x 300D x 8000H) mm 2,88 m3
f'c = 22.83 Mpa (K-275)
Rebar = 8-D16
Formwork = Plywood 12 mm thickness (once used)

GROUND FLOOR
Main T-beam (250Wx350D) mm 1,18 m3
f'c = 22.83 Mpa (K-275)
Rebar = 6-D6
Formwork = Plywood 12 mm thickness (once used)

Main T-beam (200Wx350D) mm 1,47 m3


f'c = 22.83 Mpa (K-275)
Rebar = 6-D16
Formwork = Plywood 12 mm thickness (once used)

Concrete floor 100 mm Thk (1-layers rebar) 3,23 m3


f'c = 22.83 Mpa (K-275)
Rebar = D10-100
Formwork = Plywood 12 mm thickness (once used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 2,10 m3


f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (once used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 1,30 m3


f'c = 22.83 Mpa (K-275)
Rebar = M8-200
Formwork = Plywood 12 mm thickness (once used)

Terrace stiffener beam (150W x 200D)mm 1,14 m3


f'c = 22.83 Mpa (K-275)
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
25 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Rebar = 4-D10
ROOF ( TOC. EL. + 8.0)

Main T-beam (200Wx300D) mm 1,80 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D19
Formwork = playwood 12 mm thickness (one used)

Secondary T-beam (200Wx250D) mm 1,23 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D19
Formwork = playwood 12 mm thickness (one used)

Concrete Roof 100 mm Thk (1-layers re-bar) 8,13 m3


f'c = 22.83 Mpa (K-275)
Rebar = M8-100
Formwork = playwood 12 mm thickness (one used)

Conc. parapet (80Thk x 1000H) mm (1-layer bar) 3,04 m3


f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)

15 CONTROL ROOM BUILDING Size: 2 x (8W x 8L) M, two story building


15.1 CIVIL WORK
15.1.1 Site preperation-install of bowplank and wood stiffener 40,00 m
Site Clearing 64,00 m2
Soil excavation 143,61 m3
Soil backfill and compaction 104,06 m3
15.1.2 Lean concrete & Sandbedding
Lean Concrete 11,37 m3
Sand bedding 11,37 m3
15.1.3 Concrete U ditch W=300, H=400, T=100 (one layer 10-200) 42,00 m

15.2 ARCHITECTURE & FINISHING WORK


Brickwall, Plastering & Smooth surface plastering ('acian')
Brickwall and thin bed mortar, size: (4mtr H x150mm thk) . 160,49 m2
Plastering & smooth surface, 15mm thk 320,98 m2
Glass wall panel
Glass panel t=5mm tempered include sealer (weather rubber) 138,76 m2
Glass panel t=8 mm tempered include sealer (weather rubber),
4,50 m2
allumunium frame, wire sling, location canopy
Floor and Wall Finishes
Supply and install glazed ceramic tiles (or equal approved) sizes
42,09 m2
(600x600)mm
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
26 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Supply and install un-glazed ceramic tiles sizes (200x200)mm, on


2,25 m2
toilet room
Wall Finishes ceramic tile fixed w/mortar and tile grout
Supply and install glazed ceramic tiles sizes (200x200) mm, hight:
12,00 m2
2.1 m on wall rooms: toilet
Raised Floor
UPS room, Panel room, Server room Height 300, panel 600x600
65,68 m2
mm
Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint
and all necessary fixing
accessories as specified
Acoustic Mineral Fiber Board size (600x600) mm or (600x1200)
121,97 m2
mm of 15mm th'k (min.)
Moisture resistance mineral Fiber Board or 6mm th'k Glass
32,00 m2
Reinforced Concrete (GRC) board
Painting Works and Coating
Prepare and apply one coat primer and two finishing coats of
148,49 m2
emulsion paint to interior surface
Prepare and apply one coat primer and two finishing coats of
160,49 m2
watershield emulsion paint to exterior surface
Prepare and apply waterproofing finishing coats to top of concrete
100,00 m2
roof surface
Doors and Windows...c/w all necessary fixing accessories.
Glass door & hot-dipgalvanized aluminum frame matterial
Clear glass door, single leaf, swing opening, and size: (0.9m W) x
3,00 Unit
2.1 m H, location at:Battery room (1)
Tempered glass door, double leaf, swing opening, and size: 1.6 m
1,00 Unit
W x 2.1m H , location at enterance
Tempered glass door, single leaf, swing opening, and size: 0.8m
1,00 Unit
W x 2.1m H , location at 2nd floor entrance
PVC panel door and frame...c/w all necessary fixing accessories. 1,00 Unit
Exhaus fan 2,00 Unit

15.3 SANITARY FIXTURES


Supply and install sanitary ex….. Appliances complete including all
necessary fitting accessories.
Closet (seat type) 1,00 Set.
Jet washer 1,00 Set.
Shower 1,00 Set.
Roof drain
Downspout PVC pipe 4" dia. & fittings 36,00 m
Strainer/ roof filter 4,00 Set.
Plumbing
Conc. Septicktank and absorption system (3m L x 1.8m W x
1,00 Lot
2.150m H, Thickness : 150 mm)
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
27 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

pipe 2" dia. & fittings 6,00 m


pipe 4" dia. & fittings 4,00 m

15.4 REINFORCED CONCRETE


FOOT PLATE
Foot plate-1, 13,52 m3
f'c = 22.83 Mpa (K-275)
Rebar = D19-125
Formwork = Plywood 12 mm thickness (once used)

PEDESTAL
Pedestal : 0,65 m3
f'c = 22.83 Mpa (K-275)
Rebar = 20-D19
Formwork = Plywood 12 mm thickness (once used)

COLUMN
Column : 6,48 m3
f'c = 22.83 Mpa (K-275)
Rebar = 20-D19
Formwork = Plywood 12 mm thickness (once used)
GROUND FLOOR & FOUNDATION

Main T-beam (TB1) 3,84 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D19
Formwork = Plywood 12 mm thickness (once used)

Main T-beam (TB2) 0,70 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D16
Formwork = Plywood 12 mm thickness (once used)

Second T-beam 1,20 m3


f'c = 22.83 Mpa (K-275)
Rebar = 7-D16
Formwork = Plywood 12 mm thickness (once used)

Second. T-beam 0,26 m3


f'c = 22.83 Mpa (K-275)
Rebar = 6-D16
Formwork = Plywood 12 mm thickness (once used)

Concrete floor 100 mm Thk (1-layers rebar) 5,86 m3


f'c = 22.83 Mpa (K-275)
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
28 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Rebar = M8-100
Formwork = Plywood 12 mm thickness (once used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 2,00 m3


f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (once used)

Terrace Conc. floor 100 mm Thk (1-layer bar) 1,60 m3


f'c = 22.83 Mpa (K-275)
Rebar = M8-200
Formwork = Plywood 12 mm thickness (once used)

Terrace stiffener beam (150W x 200D)mm 1,20 m3


f'c = 22.83 Mpa (K-275)
Rebar = 4-D13

SECOND FLOOR

Main beam (TB4) 400Wx600D mm 7,68 m3


f'c = 22.83 Mpa (K-275)
Rebar = 10-D19
Formwork = playwood 12 mm thickness (once used)

Second Grade beam (TB5) 250Wx350D mm 1,93 m3


f'c = 22.83 Mpa (K-275)
Rebar = 4-D16
Formwork = playwood 12 mm thickness (one used)

Second Grade beam (TB6) 200Wx250D mm 0,10 m3


f'c = 22.83 Mpa (K-275)
Rebar = 4-D16
Formwork = playwood 12 mm thickness (one used)

Concrete floor 120 mm Thk (2-layers rebar) 7,09 m3


f'c = 22.83 Mpa (K-275)
Rebar = 10-175
Formwork = playwood 12 mm thickness (one used)
ROOF ( TOC. EL. + 8.0)

Main T-beam (TB7) 300Wx550D mm 13,94 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D19
Formwork = playwood 12 mm thickness (one used)
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
29 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Cantilever-beam (TB8) 200Wx250D mm 0,70 m3


f'c = 22.83 Mpa (K-250)
Rebar = 4-D16
Formwork = playwood 12 mm thickness (one used)

Concrete Roof 100 mm Thk (1-layers re-bar) 10,00 m3


f'c = 22.83 Mpa (K-275)
Rebar = M8-100
Formwork = playwood 12 mm thickness (one used)

Conc. parapet (80Thk x 1000H) mm (1-layer bar) 3,20 m3


f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)

STAIR CASE
Staircase (0.75 m W x 0.15 m thk floor) 0,63 m3
f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)

"BORDES 1" Floor (1.1 W x 1.71 L) m 0,23 m3


f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)

Bordes beam stiffener (200Wx250D) mm 0,14 m3


f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)

15.5 STRUCTURAL STEEL


15.5.1 Steel structure
Steel frame enterance (hollow 150.100.6) 176,63 kg
Steel frame enterance (hollow 100.80.4) 97,50 kg
Hand rail pipe 2'' 105,97 kg
Hand rail pipe 1'' 63,59 kg

Painting Steel structure 12,31 m2


16 RELOKASI SHELTER LIMBAH B3, Size: (5W x 6L) M
16.1 CIVIL WORK
16.1.1 Site preperation-install of bowplank and wood stiffener 30,00 m
Site Clearing 38,50 m2
Soil excavation 30,55 m3
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
30 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Soil backfill and compaction 19,31 m3


16.1.2 Lean concrete & Sandbedding
Lean Concrete 5,59 m3
Sand bedding 5,59 m3
16.1.3 Concrete U ditch W=300, H=400, T=100 (one layer 10-200) 32,00 m

16.2 REINFORCED CONCRETE


Shelter foundation, shelter size: (5W x 6L) M
Foot plate size: (1.35 W x 1.35L x 0.3Thk) M 2,19 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
Pedestal size: (0.35W x 0.35L x 1.3Depth) M 0,64 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
Grade beam (250Wx300D) mm 0,75 m3
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
Grade beam (250Wx300D) mm 0,90 m3
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
Conc. floor 150 mm Thk (1-layer bar) 3,84 m3
f'c = 22.83 Mpa (K-275)
Rebar =M10-150
Formwork = playwood 12 mm thickness (once used)
Terrace Conc. floor 100 mm Thk (1-layer bar) 1,60 m3
f'c = 22.83 Mpa (K-275)
Rebar =10-150
Formwork = playwood 12 mm thickness (one used)
Terrace Conc. floor 100 mm Thk (1-layer bar) 1,00 m3
f'c = 22.83 Mpa (K-275)
Rebar = 10-150
Formwork = playwood 12 mm thickness (one used)
Concrete block foundation (compressor FDN)
Conc. Block FDN (1.5m x1.5m x 0.65mThk) 1,27 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
Instrument air FDN
Conc. Block FDN (2.5m x2.5m x 0.5mThk) 3,13 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
31 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Formwork = playwood 12 mm thickness (one used)


Pedestal size: (0.35W x 0.35L x 1.3Depth) M 0,53 m3
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

16.3 STRUCTURAL STEEL


Steel structure
Column WF-200x200x8x12 938,12 kg
Lateral Beam
Beam 2L 50X50X5 172,80 kg
Angle L50x50x5 60,48 kg
Angle L50x50x5 36,00 kg
Rafter WF-200x100x5.5x8 204,48 kg
Overhange Beam WF-150x75X5x7 56,00 kg
Purlin Lip.Channel C-150x65x20x2.3 480,64 kg
Sagrod dia 10 mm 13,32 kg
Wind Brace dia 16 mm 39,77 kg
Fascia frame angle L50x50x4 145,66 kg
Gutter frame flat-bar 30x3 128,00 kg
Base plate 16 mm thk. 26,58 kg
End plate 14 mm thk 33,85 kg
End plate 14 mm thk 11,21 kg
Stiffener plate 8 mm thk 8,69 kg
Stiffener plate 7 mm thk 2,09 kg
Cleat Plate 135mmx120mm, 8mm thk 16,28 kg
Anchor bolt Dia 16 16,00 Ea
HTB Dia 16 mm A325 100,00 Ea
BB Dia 12 mm A325 64,00 Ea

Roof corrugated metal sheet, Galvalume 0.55 mm thk 59,20 m2


efective wide 950 mm, heigth of wave 38 mm

Flashing, Gutter and Downspout


Ridge cap 8,00 m
Gutter metal sheet 16,00 m
Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps 22,00 m
Roof drain galv. Stl. strainer 4,00 Ea

Painting Steel structure 104,06 m2

17 RELOKASI FIRE STATION Size: (6W x 11L) M


17.1 CIVIL WORK
17.1.1 Site preperation-install of bowplank and wood stiffener 50,00 m
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
32 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Site Clearing 150,00 m2


Soil excavation 88,07 m3
Soil backfill and compaction 64,77 m3
17.1.2 Lean concrete & Sandbedding
Lean Concrete 7,79 m3
Sand bedding 15,59 m3
17.1.3 Concrete U ditch W=300, H=400, T=100 (one layer 10-200) 42,00 m

17.2 REINFORCED CONCRETE


7.2.1 SHELTER FOUNDATION
7.2.1.1 FOOT PLATE size: (1.6W x 1.6L x 0.3Thk) M
f'c = 22.83 Mpa (K-275) 4,61 m3
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

7.2.1.2 PEDESTAL size: (0.35W x 0.35L x 1.5 Depth) M 1,10 m3


f'c = 22.83 Mpa (K-275)
Rebar = 8-D16
Formwork = playwood 12 mm thickness (one used)

7.2.1.2 GRADE BEAM (TB1) 250Wx400D mm


f'c = 22.83 Mpa (K-275) 3,40 m3
Rebar = 6-D13, D10-200
Formwork = playwood 12 mm thickness (one used)

7.2.2 CONCRETE FLOOR


7.2.2.1 Conc. floor 150 mm Thk (2-layer bar) 9,90 m3
f'c = 22.83 Mpa (K-275)
Wiremesh = 8-150 (2 Layer)
Formwork = playwood 12 mm thickness (one used)

7.2.2.1 Terrace Conc. floor 70 mm Thk (1-layer bar) 1,80 m3


f'c = 22.83 Mpa (K-275)
Rebar =8-150
Formwork = playwood 12 mm thickness (one used)

7.2.2.1 Terrace Conc. floor 70 mm Thk (1-layer bar) 3,90 m3


f'c = 22.83 Mpa (K-275)
Rebar =8-150
Formwork = playwood 12 mm thickness (one used)

17.3 STRUCTURAL STEEL


17.3.1 Steel structure
Column H-200x200x8x12 1.444,61 kg
Lateral Beam SH-250x125x6x9 1.065,60 kg
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
33 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Rafter WF-250x125x6x9 426,24 kg


Overhange Beam SH-200x100x5.5x8 85,20 kg
Purlin Lip.Channel C-150x65x20x3.2 841,12 kg
Sagrod dia 10 mm 22,19 kg
Wind Brace dia 16 mm 54,29 kg
Fascia frame angle L50x50x4 227,36 kg
Gutter frame plate bar 30x3 168,00 kg
Base plate 24 mm thk. 98,91 kg
End plate 14 mm thk 28,91 kg
Stiffener plate 8 mm thk 17,60 kg
Cleat Plate 135mmx120mm, 8 mm thk 24,42 kg
Anchor bolt Dia M16 24,00 Ea
HTB Dia 16 mm A325 168,00 Ea
BB Dia 12 mm A325 96,00 Ea

17.3.2 Roof and wall


Roof corrugated metal sheet, Galvalume 0.55 mm thk 89,60 m2
efective wide 950 mm, heigth of wave 38 mm

17.3.3 Flashing, Gutter and Downspout, Fascia


Ridge cap 14,00 m
Gutter metal sheet 28,00 m
Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps 30,00 m
Roof drain galv. Stl. strainer 6,00 Ea
Fascia (zincalume) 84,00 m2

17.3.4 Painting Steel structure 218,00 m2

18 RELOKASI FIRE EXTINGUISER SHELTER (2 m x 2 m) 2 Ea


18.1 CIVIL WORK
18.1.1 Site preperation-install of bowplank and wood stiffener 26,00 m'
Site Clearing 14,40 m2
Soil excavation 5,76 m3
Soil backfill and compaction 2,88 m3
18.1.2 Lean concrete & Sandbedding
Lean Concrete 1,55 m3
Sand bedding 1,55 m3

18.2 REINFORCED CONCRETE


18.2.1 CONCRETE FLOOR
Concrete Floor: (2,4W x 3L x 0.2Thk) M 5,76 m3
f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = Plywood 12 mm thickness (once used)
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
34 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

18.3 STRUCTURAL STEEL


18.3.1 Steel structure
Column C-100X50X6X8.5 193,98 kg
Beam/GirderC-100X50X6X8.5 460,64 kg
Bracing Ø-16 15,80 kg
L-50X50X5 92,91 kg
Purlin C-100X50X6X8.5 190,80 kg
Sagrod Ø-12 4,26 kg
Connection Plate 86,26 kg
Connection bolt 23,96 kg
Anchore Bolt dia.16 mm 16,00 kg

18.3.2 Roof and wall


Roof corrugated metal sheet, Galvalume 0.55 mm thk 16,15 m2
efective wide 960 mm, heigth of wave 38 mm

Siding wall corrugated metal sheet, Galvalume 0.55 mm thk 9,60 m2


efective wide 925 mm, heigth of wave 23 mm

18.3.4 Painting Steel structure 31,34 m2

19 LIGHT POLE FOUNDATION (20 EA)


19.1 CIVIL WORK
19.1.1 Site preperation-install of bowplank and wood stiffener 160,00 m'
Site Clearing 80,00 m2
Soil excavation 143,75 m3
Soil backfill and compaction 143,75 m3
19.1.2 Lean concrete & Sandbedding
Lean Concrete 2,89 m3
Sand bedding 5,78 m3

19.2 REINFORCED CONCRETE


19.2.1 Foot Plate (1500 L x 1500 W x 300 thck) mm 13,50 m3
f'c = 18.6 Mpa (K-225)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)

19.2.2 Pedestal (350 L x 350 W x 1000 H) mm 2,45 m3


f'c = 18.6 Mpa (K-225)
Rebar = 8-D13
Formwork = Plywood 12 mm thickness (once used)

20 PAGAR
20.1 Gate
Harmonica wire Gate + frame angle 50x50x5 10,00 m'
CIVIL

Document No. Rev. 0


MATERIAL TAKE OFF Page
TNU-MTO-50-001-A4
35 of 35 .
NO. DESCRIPTION VOLUME UNIT REMARKS

Galvanized Barb Wire Dia.500 spiral helix with L.50.50.5 stiffener

Harmonica wire Gate + frame angle 50x50x6 3,00 m'


Galvanized Barb Wire Dia.500 spiral helix with L.50.50.5 stiffener

20.2 Fence
Panel Precast Concrete, 2800 Height, Coloum Per 2500 length, 186,00 m'
Galvanized Barb Wire Dia.500 spiral helix with L.50.50.5 stiffener

21 GALIAN DAN TIMBUNAN TANAH PEMASANGAN KABEL (600 W, 500 D)


Galian Tanah 189,00 m3
Sand Fill 500 mm Thick 94,50 m3