Environmental Management Action Plan

Construction Activity Environmental Impact Mitigation Measures Monitoring Time frame


Indications
 Cut and fill  Soil erosion  Proper shoring system will be provided.  Observation  During the
 Water pollution  Excavated soil will be stored properly in a way construction
 Sedimentation that is not going to be affected by the rain.
 Dust  Proper drainage system will be prepared
 Change the surface runoff  Dust emission will be reduced by spraying
of the land water during machinery movement.
 Land Preparation  Removing of vegetation  CEA guidelines will be followed.  Observation  During the
will impact on ecological  Well maintained machinery will be used to construction
system. reduce the noise.
 Noises due to machinery  Conduct awareness program to increase the
will influence on species knowledge of the all the worker and staff
behavioral patterns. regarding the importance of the ecological
system and highlight mitigation measures.
 Use and  Noise, water and air  Construction materials such as soil, sand,  Observation  During the
transportation of pollution is possible due to quarry dust and other natural resources will be  Follow road construction
Natural the extraction and purchased only from permit holders (Approval signals and
construction transportation of natural from the CEA and related LAs) LA
materials construction materials.  Materials will be covered properly to avoid guidelines
 Ecological system can get dust emission during transportation.  Permits
influenced badly.  Permitted vehicles will be hired for transport
 Dust emission due to materials on local roads (LA approval) to make
transportation of the sure carrying capacity of the road is not going
materials. to exceed especially on local roads.
 Roads can be damaged  Materials will not load up to the top level of
during material the tipper to avoid accidents during
transportation due to transportation due to falling.
excessive loads.  PPE will be used during loading and unloading.
 Loading and unloading of
the material can induce
damages on the workers.
 Loading and unloading may
lead to dust emission and
noise level increasing.
Construction Activity Environmental Impact Mitigation Measures Monitoring Time frame
Indications
 Use and  Access paths can be  Materials will be placed in the way that it is not  Observation  During the
transportation of blocked due to loading and going to disturb the access path and entrances. construction
Natural unloading
construction
materials
 On site house  Unpleasant environment  Approval will be takes from the CEA and MC to  Observation  During the
keeping  Increase of risk of getting dispose solid waste from the construction construction
injuries activities to an isolated location.
 General cleanness and  Solid waste will not burn.
tidiness will be influenced.  Garbage will be handed over to the MC.
 Garbage bins will be provided to collect plastic,
polythene and organic waste separately
 All the construction solid waste will be
removed after the construction completed.
 Air pollution  Dust from construction  Water will spray to prevent dust as much as  Observation  During the
activities, emission from possible.  Test reports construction
vehicle and machines will  Vehicle speed limit will be enforced to mitigate
reduce the quality of the dust emission at the site.
air.  Proper cover will be used during transportation
of materials
 Dust screens will be provided
 Noise pollution  Noise can influence on  All machinery and vehicles will be maintained  Test reports  During the
occupants close to the site properly to reduce excessive noise. construction
premises and also who are  Construction activities will be limited to day
working inside the site. time
 Noise level will be checked and maintained
approved limits ( 75dB during day time)
 PPE will provide to workers in order to avoid
hearing defects due to high noise.
 Occupational  Unsafe practice may lead  Insurance facility will be provided for all the  Insurance  During
safety to unfavorable situation to occupants and other assets from all risk policy construction
occupants and other factors.  Observation
properties by increasing  First aid box and trained personal will be at the
the risk of exposing to the site
hazards.
Construction Activity Environmental Impact Mitigation Measures Monitoring Time frame
Indications
 Occupational  Drinking water related  Licensed operators will be hired.  Test reports  During
safety issue  Safety orientation meetings, toolbox meetings construction
 Dengue fever and other will be carried out regularly.
deceases  Periodic testing will be carried out to ensure
 Sanitary facility related the standards of the machinery
issues.  Insurance policy will be offered to all the
occupants. Furthermore machinery, assets will
be covered under an insurance policy.
 Potable water will be provided by the national
water board for consumption.
 Mosquito breeding will be prevented through
destroying water accumulation.