Professional Documents
Culture Documents
For example
For Example
For Example
borehole is dry
Stream has dried up
area was flooded when sample was taken
Photos taken (Add photo numbers)
machine was overheating and readings not 100% accurate
etc.
pH EC_µS/cm Measurement 1 Measurement 2
Any kind of measurement that are relevant and unique to the sample t
Where ever possible and if relevant
Make sure the headings are changed
For example
here will be a time lapse and/or speed values added; water quality
em: there will be values added for the elements measured
ent plant: Stream flow in; Stream flow out; water quality; Elements
Measurement 7 Measurement 8 Measurement 9 Measurement 10
Measurement 11 Measurement 12 Measurement etc…..
Sample_ID Latitude Longitude Elevation Date Person
Description District Borehole_Collar (m) Borehole_Depth (m)
Notes
pH EC_µS/cm Measurement 1 Measurement 2 Measurement 3
Measurement 4 Measurement 5 Measurement 6 Measurement 7
Measurement 8 Measurement 9 Measurement 10 Measurement 11
Measurement 12 Measurement etc…..