Laying of HT Cable
Laying of LT Cable
Installation of DG Sets
LT Cable Termination
Fixing of Detectors.
Plumbing Work (Internal) Terrace Ring Line Piping and Shaft Pipe
Connection
CP Fixture Fitting
Fire-fighting
External Hydrant
First Floor
HVAC Work
Pump installation
Bore in earth
Rain water Harvesting
Pit execution
Passenger lift
Glass lift
Part-1
Part-1
Escalators
Part-2
Travellator Basement
Ventilation system
Jet Fans
Duct
Panels
sewer work
Storm Work
Cable laying from sub panels to shops at all floor 44850 Mtr
cable laying from sub panels to DB for common area lighting. 2100 Mtr
Drawing not
Fixing of grease trap for LGF Kiosks
available
Drawing not
Fixing of grease trap for 3rd floor Kiosks
available
Making Excavation
Laying of pipe in ph-1 170 Mtr
Laying of pipe in ph-2 170 Mtr
Testing
Connecting GI Pipes of borewell-1 to UGT tank 90 Mtr
Connecting GI Pipes of borewell-2 to UGT tank 50 Mtr
Testing of Pipe Line
Fixing of garden hydrents in ph-1
Fixing of garden hydrents in ph-2
Testing
RWH pit-3 1 no
RWH pit-4 1 no
RWH pit-3 1no
RWH pit-4 1 no
https://youtu.be/ZQmDz5o60GE
https://www.youtube.com/watch?v=5PtXIWjLpnc
https://youtu.be/ZQmDz5o60GE
https://www.youtube.com/watch?v=e9uW2auXXI0
https://www.youtube.com/watch?v=ko_VFpzMOCU
https://www.youtube.com/watch?v=AIXyADh5_uM
https://www.youtube.com/watch?v=ko_VFpzMOCU
https://www.youtube.com/watch?v=qj-X0Og7rhk
https://www.youtube.com/watch?v=2umO0fN0Asc
https://www.youtube.com/watch?v=jrp2r619c-c
https://www.youtube.com/watch?v=UswbkQILkU0
https://www.youtube.com/watch?v=j6FhURkTJNc
https://www.youtube.com/watch?v=BRT6_W7x3tc&t=193s
https://youtu.be/ZQmDz5o60GE
https://youtu.be/ZQmDz5o60GE
https://youtu.be/ZQmDz5o60GE
https://youtu.be/ZQmDz5o60GE
https://youtu.be/x1FQGyE81aQ
https://www.youtube.com/watch?v=VSz8w1hm6Vk
https://youtu.be/KkXybvkdFqo
https://www.youtube.com/watch?v=957Uo2I8s0U
https://www.youtube.com/watch?v=t4cWO8W45EY
https://www.youtube.com/watch?v=TBhZ9GkM0Pw
https://www.youtube.com/watch?v=YaV1ivd5H38
https://www.youtube.com/watch?v=5mA-_djfEq4
https://www.youtube.com/watch?v=5mA-_djfEq4
https://www.youtube.com/watch?v=957Uo2I8s0U
https://www.youtube.com/watch?v=x1FQGyE81aQ&t=118s
https://youtu.be/3YXYDHUM2DQ
https://www.youtube.com/watch?v=pAk3V3iWI9M
https://youtu.be/3YXYDHUM2DQ,https://www.youtube.com/watch?v=cdKwHM0qOZQ
https://youtu.be/3YXYDHUM2DQ,https://www.youtube.com/watch?v=ITNldzUAZlo
https://youtu.be/8j_Jh3vNLr0
https://www.youtube.com/watch?v=8j_Jh3vNLr0&t=210s
https://www.youtube.com/watch?v=SzJwNtGZmZQ
https://youtu.be/h0FxlvpuYd0,https://www.youtube.com/watch?v=194a-e1VtZ8
https://youtu.be/h0FxlvpuYd0
https://youtu.be/HqbkDM4B_58
https://youtu.be/iMhvtCpYr50
https://youtu.be/oKhKFALKDAE
https://youtu.be/Irlze5D2QSs
https://youtu.be/wmfTiE5WsQs
https://youtu.be/BRT6_W7x3tc
https://www.youtube.com/watch?v=uxaIGhnFtWk
https://youtu.be/BRT6_W7x3tc,https://www.youtube.com/watch?v=suf9F2Hev50
https://youtu.be/NqUATXUX-Mk
https://www.youtube.com/watch?v=QWudwOnI-NI
https://www.youtube.com/watch?v=TX0TjJNmPtc
https://www.youtube.com/watch?v=YHdv4cwHRrc
https://www.youtube.com/watch?v=27AZZAu1H9Y
https://youtu.be/NqUATXUX-Mk
https://youtu.be/0rNvn2cwbzM
https://youtu.be/HdBl1PxUR3g
https://www.youtube.com/watch?v=6NqGkSr-nqA
https://youtu.be/MDzP0gXXhcw
https://youtu.be/HdBl1PxUR3g
https://youtu.be/wmfTiE5WsQs
https://youtu.be/iDXo5RRgE1g
https://youtu.be/N-sLssjfwBY
https://youtu.be/vcwXpCUqu9A
https://www.youtube.com/watch?v=aut7gcgVUyA
https://youtu.be/fwu80LVljDk
https://www.youtube.com/watch?v=ijzn5Mcq8E0
https://www.youtube.com/watch?v=ewXvaGbo4bA
https://www.youtube.com/watch?v=m5SJFNAW37Y
https://www.youtube.com/watch?v=lpy1MvXP9tU&t=56s
https://www.youtube.com/watch?v=dtGoJR8tHBA
https://www.youtube.com/watch?v=yGdiy3DDA0c
https://www.youtube.com/watch?v=gxhM-j303s8
https://www.youtube.com/watch?v=yGdiy3DDA0c
https://www.youtube.com/watch?v=qAZ_XorQqU8
https://www.youtube.com/watch?v=gxhM-j303s8
https://www.youtube.com/watch?v=yGdiy3DDA0c&t=163s
https://www.youtube.com/watch?v=JtCvmwRdQRc
https://www.youtube.com/watch?v=2vKMaT5icmo
https://www.youtube.com/watch?v=2vKMaT5icmo
https://www.youtube.com/watch?v=Te574bbVtDw
https://www.youtube.com/watch?v=U2i9glif4DM
https://www.youtube.com/watch?v=3ZpixFMtsZM
https://www.youtube.com/watch?v=8AJnNsgb2xM
https://www.youtube.com/watch?v=oBUZB0i226k
https://www.youtube.com/watch?v=7QgsloCdE00
https://www.youtube.com/watch?v=i-1iFHXEF7A
https://www.youtube.com/watch?v=WbI8ogNJb20
https://www.youtube.com/watch?v=nOdJHnK9418
https://www.youtube.com/watch?v=zGy_kCnxJMk
https://www.youtube.com/watch?v=i-1iFHXEF7A
https://www.youtube.com/watch?v=Y4fo6CUNQzc
https://www.youtube.com/watch?v=Qx35Vlf0pHU
https://www.youtube.com/watch?v=k9q4MRdvv7c
https://www.youtube.com/watch?v=Y4fo6CUNQzc
https://www.youtube.com/watch?v=Ue_OsMy7uO0
https://www.youtube.com/watch?v=USAKRPnf_Ho
https://www.youtube.com/watch?v=L7DplnYQY8o
https://www.youtube.com/watch?v=7QgsloCdE00
https://www.youtube.com/watch?v=LcNi9X-Hx2s
https://www.youtube.com/watch?v=LcNi9X-Hx2s
https://www.youtube.com/watch?v=LcNi9X-Hx2s
https://www.youtube.com/watch?v=LcNi9X-Hx2s
https://www.youtube.com/watch?v=LcNi9X-Hx2s
https://www.youtube.com/watch?v=uZYAqFMoH1s
https://www.youtube.com/watch?v=Yf05iLVjGCU
https://www.youtube.com/watch?v=3wy0kTc-91U
https://www.youtube.com/watch?v=3wy0kTc-91U
https://www.youtube.com/watch?v=3wy0kTc-91U
https://www.youtube.com/watch?v=3wy0kTc-91U
https://www.youtube.com/watch?v=3wy0kTc-91U
https://www.youtube.com/watch?v=PEXRIowpz8A
https://www.youtube.com/watch?v=sh2R6MTQaU8
https://www.youtube.com/watch?v=sh2R6MTQaU8
https://www.youtube.com/watch?v=sh2R6MTQaU8
https://www.youtube.com/watch?v=sh2R6MTQaU8
https://www.youtube.com/watch?v=sh2R6MTQaU8
https://www.youtube.com/watch?v=XlHFdxSXR2s
https://www.youtube.com/watch?v=XlHFdxSXR2s
https://www.youtube.com/watch?v=KlerqZbxNfI
https://www.youtube.com/watch?v=KlerqZbxNfI
https://www.youtube.com/watch?v=w_6_1lEkEI8
https://www.youtube.com/watch?v=w_6_1lEkEI8
https://www.youtube.com/watch?v=2ZdFfRtfqwQ
https://www.youtube.com/watch?v=2ZdFfRtfqwQ
https://www.youtube.com/watch?v=BamCDB28oCc
https://www.youtube.com/watch?v=BamCDB28oCc
https://www.youtube.com/watch?v=rJxpc6AYXD0
https://www.youtube.com/watch?v=rJxpc6AYXD0
https://www.youtube.com/watch?v=rJxpc6AYXD0
https://www.youtube.com/watch?v=rJxpc6AYXD0
https://www.youtube.com/watch?v=rJxpc6AYXD0
https://www.youtube.com/watch?v=rJxpc6AYXD0
https://www.youtube.com/watch?v=rJxpc6AYXD0
https://www.youtube.com/watch?v=rJxpc6AYXD0
https://www.youtube.com/watch?v=GFsZkXY-6Bc
https://www.youtube.com/watch?v=nwqmBWuEAF4
https://www.youtube.com/watch?v=nwqmBWuEAF4
https://www.youtube.com/watch?v=nwqmBWuEAF4
https://www.youtube.com/watch?v=2v0IIHQ_mJ0
https://www.youtube.com/watch?v=16WXu5E4ahM
https://www.youtube.com/watch?v=1gvSC32iiUs
https://www.youtube.com/watch?v=QGhAwR4ewRU
https://www.youtube.com/watch?v=N4LP0FzWH3I
https://www.youtube.com/watch?v=BypO1Ij4Ajo
https://www.youtube.com/watch?v=BypO1Ij4Ajo
https://www.youtube.com/watch?v=BypO1Ij4Ajo
https://www.youtube.com/watch?v=BypO1Ij4Ajo
https://www.youtube.com/watch?v=GuklpHMBKKE
https://www.youtube.com/watch?v=GuklpHMBKKE
https://www.youtube.com/watch?v=GuklpHMBKKE
https://www.youtube.com/watch?v=GuklpHMBKKE
https://www.youtube.com/watch?v=ruCAjAhDcmc
https://www.youtube.com/watch?v=ruCAjAhDcmc
https://www.youtube.com/watch?v=semtOTtoyz0
https://www.youtube.com/watch?v=semtOTtoyz0
https://www.youtube.com/watch?v=semtOTtoyz0
https://www.youtube.com/watch?v=semtOTtoyz0
https://www.youtube.com/watch?v=semtOTtoyz0
https://www.youtube.com/watch?v=7wqrBEGV29c
https://www.youtube.com/watch?v=7wqrBEGV29c
https://www.youtube.com/watch?v=xd-FFC45ikk
https://www.youtube.com/watch?v=xd-FFC45ikk
https://www.youtube.com/watch?v=xd-FFC45ikk
https://www.youtube.com/watch?v=-GoDYIrPv8o
https://www.youtube.com/watch?v=m-mXJWQYG7M
https://www.youtube.com/watch?v=m-mXJWQYG7M
https://www.youtube.com/watch?v=m-mXJWQYG7M
https://www.youtube.com/watch?v=m-mXJWQYG7M
https://www.youtube.com/watch?v=s2pTzWiyWxI
https://www.youtube.com/watch?v=s2pTzWiyWxI
https://www.youtube.com/watch?v=s2pTzWiyWxI
https://www.youtube.com/watch?v=s2pTzWiyWxI
https://www.youtube.com/watch?v=s2pTzWiyWxI
https://www.youtube.com/watch?v=OXVIfDS2oqw
https://www.youtube.com/watch?v=OXVIfDS2oqw
https://www.youtube.com/watch?v=OXVIfDS2oqw
https://www.youtube.com/watch?v=OXVIfDS2oqw
https://www.youtube.com/watch?v=OXVIfDS2oqw
https://www.youtube.com/watch?v=88hiQDyG8lY
https://www.youtube.com/watch?v=88hiQDyG8lY
https://www.youtube.com/watch?v=88hiQDyG8lY
https://www.youtube.com/watch?v=88hiQDyG8lY
https://www.youtube.com/watch?v=88hiQDyG8lY
https://www.youtube.com/watch?v=Zxb8UNKoGOA
https://www.youtube.com/watch?v=VYtB9oAFKQM
https://www.youtube.com/watch?v=8zxueEbgyws
https://www.youtube.com/watch?v=8zxueEbgyws
https://www.youtube.com/watch?v=qUF_eama6WI
https://www.youtube.com/watch?v=c824ayjsF3k
https://www.youtube.com/watch?v=rhOM9yIHiYk
https://www.youtube.com/watch?v=F-jHTKyEsVY
https://www.youtube.com/watch?v=S7QslP0uJqA
https://www.youtube.com/watch?v=r9i5E9vsjEQ
https://www.youtube.com/watch?v=vs2AS945O2I
https://www.youtube.com/watch?v=vs2AS945O2I
https://www.youtube.com/watch?v=aAbHESWz3GY
https://www.youtube.com/watch?v=zwvfEly4Ni4
https://www.youtube.com/watch?v=GQqmBPHbBJ8
https://www.youtube.com/watch?v=tFbIwi6bEJw
https://www.youtube.com/watch?v=drcZCkX9oKA
https://www.youtube.com/watch?v=On6n3rOiAGQ
https://www.youtube.com/watch?v=0jJW-fHX9js
https://www.youtube.com/watch?v=0_ZcCqqpS2o
https://youtu.be/LJiT3VHJwZI
https://www.youtube.com/watch?v=LgWqCM7IqYE
https://www.youtube.com/watch?v=8XmJwhSFn78
https://www.youtube.com/watch?v=iRX52GaiW64
https://www.youtube.com/watch?v=8XmJwhSFn78
https://www.youtube.com/watch?v=GNnQ9q_DX3w
https://www.youtube.com/watch?v=vVT0EL9nztc
https://www.youtube.com/watch?v=uqxp8NWb6I8
https://www.youtube.com/watch?v=pfQtQ-lGYOk
https://youtu.be/tGvuPsSf_3c https://youtu.be/o-ylvugYc0w
https://youtu.be/h9xxtkoufnM
https://youtu.be/7qMZGoSuO48 https://youtu.be/H8UT7VUoVPI
https://youtu.be/m0dfXh7UjEI
https://youtu.be/3mYGqI_k6NA https://youtu.be/2rugH2cUVrw
https://youtu.be/QUjPHz_R6Mw
https://youtu.be/tGvuPsSf_3c https://youtu.be/-G9VlV7KFHw
https://youtu.be/ln_KPvEZXOg
https://youtu.be/osyyLey5ipU https://youtu.be/citOKJ-GTP4
https://youtu.be/zAMd5yfByx8
https://youtu.be/zj-msR0F3Ws https://youtu.be/fCrxAqk-uCM
https://youtu.be/jw4y7nAbbA4https://youtu.be/Bh9KgvaRNTE
https://youtu.be/djNVhJiZQcs
https://youtu.be/z1HM05ekeIY
https://youtu.be/tGvuPsSf_3c https://youtu.be/o-ylvugYc0w
https://youtu.be/h9xxtkoufnM
https://youtu.be/7qMZGoSuO48 https://youtu.be/H8UT7VUoVPI
https://youtu.be/m0dfXh7UjEI
https://youtu.be/Nfhg8RWqP58 https://youtu.be/24HvdTdKiUI
https://youtu.be/6kzJFbHh0QA
https://youtu.be/3mYGqI_k6NA https://youtu.be/2rugH2cUVrw
https://youtu.be/QUjPHz_R6Mw
https://youtu.be/tGvuPsSf_3c https://youtu.be/-G9VlV7KFHw
https://youtu.be/ln_KPvEZXOg
https://youtu.be/osyyLey5ipU https://youtu.be/citOKJ-GTP4
https://youtu.be/zAMd5yfByx8
https://youtu.be/zj-msR0F3Ws https://youtu.be/fCrxAqk-uCM
https://youtu.be/jw4y7nAbbA4https://youtu.be/Bh9KgvaRNTE
https://youtu.be/djNVhJiZQcs
https://youtu.be/z1HM05ekeIY
https://youtu.be/osyyLey5ipU https://youtu.be/citOKJ-GTP4
https://youtu.be/zAMd5yfByx8
https://youtu.be/7qMZGoSuO48 https://youtu.be/H8UT7VUoVPI
https://youtu.be/m0dfXh7UjEI
https://youtu.be/3mYGqI_k6NA https://youtu.be/2rugH2cUVrw
https://youtu.be/QUjPHz_R6Mw https://youtu.be/_V4ZQuuf3uQ
https://youtu.be/bEwdRnc_ukE
https://youtu.be/hJ_hOEI4Jcs
https://youtu.be/djNVhJiZQcs https://youtu.be/Bh9KgvaRNTE
https://youtu.be/z1HM05ekeIY
https://youtu.be/XALfzf6O_7E https://youtu.be/osyyLey5ipU
https://youtu.be/citOKJ-GTP4 https://youtu.be/zAMd5yfByx8
https://youtu.be/osyyLey5ipU https://youtu.be/citOKJ-GTP4
https://youtu.be/zAMd5yfByx8
https://youtu.be/sZBsN0MobiQ https://youtu.be/uvT-4-WmFcg
https://youtu.be/zj-msR0F3Ws https://youtu.be/T6pHXwrq44Y
https://youtu.be/eBztBik5yrA https://youtu.be/qdTpLBZV90M
https://youtu.be/mDmEnRgQ-Bc
https://youtu.be/vpJeCyTp7iw https://youtu.be/osyyLey5ipU
https://youtu.be/citOKJ-GTP4 https://youtu.be/zAMd5yfByx8
https://youtu.be/ZQmDz5o60GE
https://youtu.be/VvFdSQ-3c8c https://youtu.be/zj-msR0F3Ws
https://youtu.be/T6pHXwrq44Y
https://youtu.be/AdlEOu603sE https://youtu.be/QXYKUJM-3lM
https://youtu.be/_qGtX3klu3Q
https://youtu.be/7qMZGoSuO48 https://youtu.be/H8UT7VUoVPI
https://youtu.be/m0dfXh7UjEI
https://youtu.be/zj-msR0F3Ws https://youtu.be/zj-msR0F3Ws
https://youtu.be/T6pHXwrq44Y
https://youtu.be/zj-msR0F3Ws https://youtu.be/zj-msR0F3Ws
https://youtu.be/T6pHXwrq44Y
https://youtu.be/GIqCE3yLJ4U https://youtu.be/kSturDl6rYk
https://youtu.be/wQd8bc0enRY
https://youtu.be/QWh_oeF8y3w https://youtu.be/wfLv3smMoCA
https://youtu.be/djNVhJiZQcs https://youtu.be/djNVhJiZQcs
https://youtu.be/Bh9KgvaRNTE https://youtu.be/z1HM05ekeIY
https://youtu.be/QWh_oeF8y3w https://youtu.be/wfLv3smMoCA
https://youtu.be/QWh_oeF8y3w
https://youtu.be/QWh_oeF8y3w
https://youtu.be/djNVhJiZQcs https://youtu.be/djNVhJiZQcs
https://youtu.be/Bh9KgvaRNTE https://youtu.be/z1HM05ekeIY
https://youtu.be/zj-msR0F3Ws https://youtu.be/zj-msR0F3Ws
https://youtu.be/T6pHXwrq44Y
https://youtu.be/QWh_oeF8y3w https://youtu.be/wfLv3smMoCA
https://youtu.be/djNVhJiZQcs
https://youtu.be/QWh_oeF8y3w https://youtu.be/wfLv3smMoCA
https://youtu.be/djNVhJiZQcs https://youtu.be/djNVhJiZQcs
https://youtu.be/Bh9KgvaRNTE https://youtu.be/z1HM05ekeIY
https://youtu.be/2l5c0jFNg5k
https://youtu.be/2l5c0jFNg5k
https://youtu.be/1gNcKvdZiAo
https://youtu.be/PmCaDImDCEk
https://youtu.be/PmCaDImDCEk
https://youtu.be/9EHrK8epIqc
https://youtu.be/9EHrK8epIqc
https://youtu.be/Elfy7DJIy6E
https://youtu.be/N-sLssjfwBY https://youtu.be/vcwXpCUqu9A
https://youtu.be/uMvDlxUK9XU
https://youtu.be/uMvDlxUK9XU
https://youtu.be/uMvDlxUK9XU
https://youtu.be/uMvDlxUK9XU
https://youtu.be/uX9i5YAVhQw
https://youtu.be/uX9i5YAVhQw
https://youtu.be/uX9i5YAVhQw
https://youtu.be/uX9i5YAVhQw
https://youtu.be/uX9i5YAVhQw
https://youtu.be/uX9i5YAVhQw
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/Ha9FNJhz0i0 https://youtu.be/BsY6CMCdtkc
https://youtu.be/LIeP0m1HmXI
https://youtu.be/LIeP0m1HmXI
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt0
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt1
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt2
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt3
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt4
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt5
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt6
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt7
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt8
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt9
https://youtu.be/cvduN1uFnTc https://youtu.be/Ae-awmqLBt10
https://youtu.be/cvduN1uFnTc https://youtu.be/u6MTy-x1MDA
https://youtu.be/6ie-bjuPgPA
https://youtu.be/6ie-bjuPgPA
https://youtu.be/6ie-bjuPgPA
https://youtu.be/6ie-bjuPgPA
https://youtu.be/6ie-bjuPgPA
https://youtu.be/6stjxTqGaAU
https://youtu.be/6stjxTqGaAU
https://youtu.be/6stjxTqGaAU
https://youtu.be/nsS_RTYvHSY https://youtu.be/UmglGtJPEh4
https://youtu.be/cAerJlWfAPM
https://youtu.be/nsS_RTYvHSY https://youtu.be/UmglGtJPEh4
https://youtu.be/cAerJlWfAPM
https://youtu.be/PfjYrYBCA6s https://youtu.be/YdXwolunT6Y
https://youtu.be/BUVmZJjhQGk
https://youtu.be/PfjYrYBCA6s https://youtu.be/YdXwolunT6Y
https://youtu.be/BUVmZJjhQGk
https://youtu.be/PfjYrYBCA6s https://youtu.be/YdXwolunT6Y
https://youtu.be/BUVmZJjhQGk
https://youtu.be/PfjYrYBCA6s https://youtu.be/YdXwolunT6Y
https://youtu.be/BUVmZJjhQGk
https://youtu.be/PfjYrYBCA6s https://youtu.be/YdXwolunT6Y
https://youtu.be/BUVmZJjhQGk
https://youtu.be/PfjYrYBCA6s https://youtu.be/YdXwolunT6Y
https://youtu.be/BUVmZJjhQGk
https://youtu.be/PfjYrYBCA6s https://youtu.be/YdXwolunT6Y
https://youtu.be/BUVmZJjhQGk
https://youtu.be/eKFkH3q-MWM https://youtu.be/lpDgF8UPu7U
https://youtu.be/OGnf_aWxJDg
https://youtu.be/eKFkH3q-MWM https://youtu.be/lpDgF8UPu7U
https://youtu.be/OGnf_aWxJDg
https://youtu.be/IXm-IX2O1IY
https://youtu.be/UQdfrBtJ0lg
https://youtu.be/UQdfrBtJ0lg
working and dressing the installation as recommended shall be
employed.
All bends and sets shall be in accordance with IEE regulation 522-08
formed with the aid of a helical spring fitted internally, with if necessary,
the conduit warmed sufficiently for it to move without avoidable wall
Wiring:
thinningNo wiring
of the outbesidecarried
of theout until the appropriate tests required or in
bend.
the electrical testing
Conduit system shall be installed so section have been as todone and compliance
ensure the consultant withhas
the
given his clearance for wiring
requirements of Specified Standard and Regulation. to commence. A loop in form of wiring shall
be
Joints used as far as
between PVCpracticable
conduit +orfittings
unlessshall otherwise
be made indicated. Joints in
with suitable
conductors
adhesive, but shall
expansion usingMethology
be madecouplings insulated
shall beterminal
installed blocks
wherecomplying
any length with
of
requirements of this specification. At expansion
conduit , inclusive of draw in boxes etc, exceeds five meters in length. joints adequate slack
shall
The minimum be left in and the cable.
maximum Where sizesconduits
of conduit are installed
to be employed for wiring by be
shall
others, a draw wire shall be provided
20mm and 32mmdiameter respectively, unless otherwise stated in between each draw in position.
Where
subsequent three-phase
sectionscircuits comprising single-core cables are installed in
of the specification.
trunking, all cables
Conduits in floors shall be routed of a shall be tiedandtogether
installedatso intervals
as to avoid not exceeding
the fixings
200mm. Cables forming part of alarm,
of floor standing equipment to be installed on the floor. control, communication or
monitoring circuits shall have identification sleeves at their terminations.
Identification shall be consistent with the relevant wiring diagrams.
EQUIPMENT REQUIREMENTS The requirements that will be engaged
for Power and lighting System Wiring works will be as follows: Measuring
tape Cutting plier Box spanner set Bending spring Pipe Wrench Drilling
Machine Crimping tool Screw driver Pulling spring Hammer Common
tools
Materials: Materials used will be as per the material submittal approved
by the engineer and will be as per the approved drawings in coordination
with other services.
Storage / Protection: DB, SMDB, and MDB and Accessories shall be
unloaded with care to avoid any damages. If they are shipped in packs or
pallets, each pack of pallet shall be lifted individually with suitable lifting
equipment. Every precaution shall be taken to preserve their cleanliness
before installation. Store in accordance with manufacturer’s instructions,
Properly protected from construction activities and weather conditions.
Installation:
To make sure that the entire installation is in conformance and in
accordance with the design intent of the project for the Electrical and Low
Voltage System in addition to the specification and as per approved shop
drawings and comply.
with local and International Standards.
All the switchboards shall be fabricated at the manufacturer’s works.
Before beginning installation in any area, examine all parts of the
adjoining works into which applicable work is to be placed. Should any
condition be found which will prevent the proper execution of the work,
installation shall not proceed in that area until such conditions are
corrected by the contractor.
Method
Fix all equipmentof Work. independently of wiring system. Use cadmium of zinc
Pre - Installation
electroplated bolts, Procedures.
nuts, washers and screw.
•Mount Light single
FixtureDB material
at 1800mminspection
from shall
finishbe carried
floor levelout to topto confirm rating,
of equipment,
quantity
unless shown and quality
otherwise as per ontechnical
drawing /specification.
schedules.
•Ensures
Light fixtures shall be stack
that clearance in front in of
a dry storage is
switchgear area
notwithlessan thanidentification
1m, or as
tag.
indicated.
•Number
Light fixtures
terminals, place shall be
cables andcleared
component of anypartsdebris.
to correspond with
•manufacturer
Light Fixtureshave shallcertified
be checkeddrawings.as per approved shop drawings/
instruction
Terminate PVC, of the SWA client.PVC and MICS cables inside enclosure by
•securing
Light fixture
cables installation gang shall
to switchboards withbe finalized
gland for execution
bracket; and enclosure of thewith
job.
•glanding
All required tools & tackles shall be
plates or fabricated steel extension boxes. shifted to the site before starting the
installation of light fixtures
• All materials shall be stored under safe custody near the workplace.
• Light fixtures location shall be as per approved shop drawings.
• The details of spacing light fixtures shall be as per approved shop
drawing.
• Shift
To makelight fixtures
sure supplied
that the entirefrom the client
installation is inasconformance
required to the andworkplace.
in
Method of Installation
accordance with the design of Light Fixtures.
intent of the project for the Electrical and Low
• InspectSystem
Voltage the place to installed
in addition to theLight fixtures as and
specification per approved
as per approved shop shop
drawing.
drawings and comply with Local and International Standards.
• Chalk lines
Adhere to the(gerudrawingspowder cementas
as closely colour removable
possible. The right type)is are used to
reserved
markthe
vary theruns
spacingand of lightoffixtures
sizes Cable Traysas per/ approved
Trunking and drawing.
to make offsets
• After
but marking
maintain as the light
far as fixturesthe
possible willfree
be shifted
area oftoeach the workplace.
duct work section,
• The light
where fitting support
necessary and accessories
to accommodate conditions will be fixedatasthe
arising perbuilding.
approved
drawing.
Before beginning installation in any area, examine all parts of the
• Wires will
adjoining be connected
work onto whichto the connector
applicable work of light
is to befitting
placed. as Should
per standard.
any
• Light fitting
condition will bewhich
be found mounted on the support
will prevent the proper fitted.execution of the work,
To make sure that the entire installation is in conformance and in
accordance with the design intent of the project for the Electrical and Low
Voltage System in addition to the specification and as per approved shop
drawings and comply with Local and International Standards.
Adhere to the drawings as closely as possible. The right is reserved to
vary the runs and sizes of Cable Trays / Trunking and to make offsets
but maintain as far as possible the free area of each duct work section,
where necessary to accommodate conditions arising at the building.
Before beginning installation in any area, examine all parts of the
adjoining work onto which applicable work is to be placed. Should any
condition be found which will prevent the proper execution of the work,
installation shall not proceed in that area until such conditions are
corrected by the contractor.
Cable Tray / Trunking shall be stored on site under cover in dry, well
ventilated storage facilities.
Where sizes of Cable Trays / Trunking are not detailed on drawing then
tray shall be adequately sized to support the cables without bunching
and a 25% reserve margin shall be allowed in size and weight be loaded.
Install the are
All routes lightchosen
heads toonallow
the post,
easeand feed wires
of access to allinto the post
cables when from the
bottom,
installed.until they protrude
All horizontal through
cables are tothe
betop.
set Then,
aroundconnect the rising
all vertical wire leads
from the as
services light heads to the
necessary. circuit
Ensure wires. Join
sufficient like-colored
clearance wiresfor
from soffit with twist
every
connectors.
installation. For strain relief, tape the wires together with vinyl tape.
Earth continuity conductors shall be provided across gaps in all Cable
Tray / Trunking runs and bolted connections.
Pipe Earthing REQUIREMENT The equipment that will be engaged for
EQUIPMENT
This is the most
Installation common
of DB, SMDB and and MDB
best system of earthing
works will as compared
be as follows: to
ire cutters
other systems
Measuring tapesuitable for the Wooden
Drill machine same earth and moisture
hammer conditions.
Flat file Screw In this
drivers
method
Open and theboxgalvanized
spannerssteel and perforated
Crimping tool pipe of approved length and
diameter in place upright in a permanently wet soil, as shown below. The
size of the pipe depends upon the current to be carried and type of soil.
The pipe is placed at 3.75 meters. The bottom of the pipe is surrounded
by small pieces of coke or charcoal at a distance of about 15 cm.
ROUTE
AlternatePLANS:
layers ofTentative
coke andcable route
salt are plans
used will be furnished
to increase to thearea
the effective contractors,
indicating the roads road crossings, findings by excavating
of the earth and to decrease the earth resistance respectively. trial holes by the contractor
/ sub contractor. The work should be taken upon only after CESU Engineers approve
the final route.
Another pipe ofThe CESU
19 mm reserves
diameter andthe right to change,
minimum alter
length 1.25 deviate
meters is the route on
technical reasons.
connected at the top of GI pipe through reducing socket.
11.3. TRIAL PITS : The bidder shall excavate trial pits, for alignment purpose at
appropriate distance apart as warranted by the local conditions, keep a record of the
findings and close the trial holes properly to avoid hindrance / accidents to pedestrian
traffic. The final route / alignment of the cables shall be decided based on the finding
of the trial holes.
11.4. It is the responsibility of the bidder to maintain as far as possible the required statutory
clearances from other utility services.
11.5. Any damage caused, inadvertently to any utility services shall be the sole responsibility
of the contracto
When considering the location of the electrical transformer installation, it
is important to evaluate all safety codes. The installation should not
present any threat to the normal movement of personnel or equipment. If
the electrical transformer is installed at ground level, it is important to
Crane of suitable capacity & arrangement in line with the Manufacturer's recommendations. and as required at site.
evaluate soil characteristics and soil behavior.
Forklift of suitable capacity.
Chain Pulley Block.
Portable hand tools.
Poor soil conditions can lead to differential settlements damaging your
Portable Drilling Machine/ Grinding Machine & Angle Cutter.
transformer or electrical connections. If the electrical transformer is to be
Spirit Level.
installed over a concrete pad, it must have at least 3,000 psi, with
Crimping Tool.
chamfered edges on top of the base extending 20 inches down from
Panel
each end, shalland
be covered
a typical properly to prevent
base should be 6 x dust
7 feet& and
contamination.
12 inches. Shift the LT Panel from stores to the installation spot using h
• Shift the LT Panel from stores to the installation spot using hydra/forklift.
•For Forpadfloor mounted
mount panel, the
transformers exact
with location
ratings of thethrough
of 75kVA panel and fixing holes
500kVA, a to be marked on the concrete plinth provided by the
•typical
Remove the packing and ensure that the LT panel is free from
concrete base would be 5 1/2 x 6 1/2 ft. and 10 in. For units with transportation damages
•ratings
Install above
the panel in proper alignment and fix properly.
500kVA to 2500kVA, a typical concrete base would be 8 ft
•x Tighten
9 ft and all
10the connections as required
in. thick.
• Access around the panel to be checked for future maintenance as per regulations.
• Ensure the services contains water is away from the panel or properly protected against any accidental leakages.
• Incoming and outgoing cables shall be marked/identified as per approved shop drawing.
• All components of the panel shall be verified against the approved panel drawing for correct rating & size.
• All internal connections/modification will be carried out by the Manufacturer.
• All breakers (incoming/outgoing) shall be in “OFF” position and to be locked to prevent mishandling
• Check & ensure adequate space is available for maintenance
• After installation, the panel shall be properly cleaned and protected to prevent dust & contamination.
• Material inspection request shall be raised for QA/QC verification.
• Inspection request shall be raised for client inspection & sign off.
1.Initially the cable is meggered at 5kv for 1min.per phase to phase
andphase to earth.2. Remove the oversheath of the cable
accordingly.Remove the armourfrom the end of the over sheath.Attach a
wire binder around the armour20mm from the end of the
oversheath.Clean
Strict adherence tothe thisend of thestatement
method over sheath fora length
is critical to theofhealth
aboutand safety of all engaged
250mm.Slide
in the work. the sealing sleeve over the cable end.Disassemble the
clamping
Any deviation rings.Slide onebe
must first clamping
authorisedringby
lugthe
downwards overthe
Site Supervisor.
cable.3.Remove the bedding
Planned Task/Activity Description: 20mm above the end of the armour.Attach
an earthlead to each metal tape shield(if any)
Installation of New CCTV Equipment at Existing Points. or the lead sheath,as
appropriate,bysolderin
Location and Access: (attached or any other
planequivalent method.Pass the end of
as appropriate)
the earthatlead
Located right side of building, Access via car park.
Working Environment & Restrictions:
Exterior to main building in car park area.
Protection of others:
Immediate area around camera to be cordoned off with cones and safety tape.
Emergency Procedures:
Normal site evacuation procedure to apply.
Operatives/Competence:
IPAF trained operatives in attendance.
Personal Protective Equipment:
Safety Harness, High Visibility Vests, Safety Footwear, Hard Hats, Goggles.
Plant & Equipment:
Mobile Elevating Work Platform, Cordless Drill.
Materials Handling/Storage & Safety Information:
All material stored in MEWP either secured by lanyards or placed in fixed containers.
Wiring & ConnectionsVerify that hardware and devices are NRTL
listed for use with fire-alarm system before making
connections.Make addressable connections with a supervised
interface device to the following devices and systems. Install the
interface device less than 3 feet (1 m) from the device controller.
Make an addressable confirmation connection when such feedback is
available at the device or system being controlled.1.Alarm-initiating
connection to smoke-control system (smoke management) at fire-
fighter smoke-control system panel.2.Alarm-initiating connection to
stairwell and elevator-shaft pressurization systems.3.Smoke dampers in
air ducts of designated air-conditioning duct systems.4.Alarm-initiating
connection to elevator recall system and components.5.Alarm-initiating
Wiring & ConnectionsVerify that hardware and devices are NRTL
listed for use with fire-alarm system before making
connections.Make addressable connections with a supervised
interface device to the following devices and systems. Install the
interface device less than 3 feet (1 m) from the device controller.
Make an addressable confirmation connection when such feedback is
available at the device or system being controlled.1.Alarm-initiating
connection to smoke-control system (smoke management) at fire-
fighter Installing signal cablesystem
smoke-control and power cable:
panel.2.Alarm-initiating connection to
-stairwell Calculated cable length, color
and elevator-shaft pressurization must be exactly as the sample
systems.3.Smoke submitted
dampers in
to distinguish signal cable and power cable.
air ducts of designated air-conditioning duct systems.4.Alarm-initiating
-connection The signaltocable doesrecall
elevator not come system with
and thecomponents.5.Alarm-initiating
power cable, to avoid causing
many
connection signals.to activate emergency lighting control.6.Alarm-initiating
-connection Prepare cables, marking
to activate cables every
emergency shutoffs 5mforalong
gastheandaxis.
fuel
-supplies.7.Supervisory
Cable will follow duct or cable tray.
connections at valve supervisory
-switches.8.Supervisory
Cable insulation after cable connectionspulling.at low-air-pressure switch of each
-dry-pipe While waiting for equipment
sprinkler system.9.Supervisory installation,connections
cables mustatbe markedshunt
elevator and trip
rolled up neatly.
breaker.10.Supervisory connections at fire-pump power failure including
-a Check and request
dead-phase or phase for reversal
approvalcondition.11.Supervisory
and approval. connections at
-fire-pump Clean and sanitize excess
engine control panel. materials, keep the construction site clean
and
Installation tidy. Procedure / Method StatementThe devices/peripherals
Installation
(Smoke detectors, of notification
heat speakers:
detectors, break glass, duct detectors,
-beam Positioning,
detectors,installing
controlspeakers.
and monitoringThe installed
modules) speakers must conform
are connected to
in Class
the design and technical requirements of the
A circuit with the Control panels.The speakers & speaker with strobes are project.
-connectedCheck theinheightClassand coordinates
A circuit with theofControl
the speaker
panels.2according to the FP
Core 1.5mm2
construction drawing. If it is found that it is not
200 cable to be used for cabling the Initiating Device Circuits (IDC) to thetechnically or aesthetically
pleasing,
panel, additional then propose2c x adjustment
2.5mm2 FP200 consultancy.
cable is required for the
-smoke Mounting suspension
detector brackets,base
with sounder speakerfor brackets must of
the activation bethe
strong and
sounders
avoid shifting during use.
units.2 core 1.5mm2 FP 200 cable to be used for cabling the
-Speakers
The signalwith connectors
the panel, mustadditional
be properly 2c installed
x 2.5mm2 and tightened.
FP200 cable is
-required
Check carefully the speaker power supply,
from the FACP for the speaker with strobe for the to prevent inappropriate
activation of
power
the strobe supply
unitcausing
allied inspeaker damage.
vertical walls the run of conduit will be kept
-straight.Comply
When calibrating, withyouNFPAmust72choose the appropriate
for installation direction to ensure
of fire-alarm
the sound is evenly spread throughout the
equipment.Smoke-or Heat-Detector Spacing:Comply with NFPA 72, notice space.
-“Smoke-Sensing
For outdoor speakers must use &waterproofing
Fire Detectors” “Heat-Sensing to Fire
prevent rain, moisture
penetration.
Detectors”.Smooth ceiling spacing shall not exceed 30 feet (9 m).Fire-
-Alarm
Installation
Control of earthing
Unit: Surfaceconductors for outdoor
mounted, with topsloudspeakers.
of cabinets not
-more
Installthan
adapter, protective
72 inches (1830 box for above
mm) speakers. the finished floor.Annunciator:
Install with top of panel not more than 72 inches (1830 mm) above the
finished floor
nspection, testing and commissioningAll inspection and testing for fire
alarm system shall be carried out in accordance with specifications. Work
shall be carried out by the experienced site team under the
guidance of engineer and shall further be checked and approved by
quality engineer.a)Check the materials are approved.b)Check for any
damage or defects, name plate detailsc)Check all devices installed as
per the specifications & Drawing.d)Visual Inspection: Conduct visual
inspection prior to testing.e)Inspection shall be based on completed
and approved drawings and system documentation as per
NFPA.f)Comply with “Visual Inspection Frequencies” Table in the
“Inspection” Section of the “Inspection, Testing and Maintenance”
Chapter in NFPA 72; retain theg)“Initial/Reacceptance” column and list
only the installed components.
Make sure that walls are at least rough-plastered and finish levels are
marked by the civil contractor. If proper cladding levels are not marked,
the pipes could be too deep or too shallow inside. Pipes deep in the wall
will require use of extension nipples at faucets. Wall flanges of concealed
stop cocks, concealed shower mixer etc will not fit-in correctly.
Mark pipe lines on walls as shown on the working drawing.
Chase the walls to required depth using a chasing machine.
Assemble piping starting from branch left in shaft and install in the wall
Make sure that walls are at least rough-plastered and finish levels are
marked by the civil contractor. If proper cladding levels are not marked,
the pipes could be too deep or too shallow inside. Pipes deep in the wall
will require use of extension nipples at faucets. Wall flanges of concealed
stop cocks, concealed shower mixer etc will not fit-in correctly.
Mark pipe lines on walls as shown on the working drawing.
Chase the walls to required depth using a chasing machine.
Assemble piping starting from branch left in shaft and install in the wall
chase with clamps. Use pre-fabricated assemblies wherever possible.
Locate fixture outlets according to working drawing and tile-module
drawings. Title modules shall be marked on walls by the civil contractor.
Plug all openings and test the pipework for leaks under specified
pressure and for required duration. Test should be witnessed and
approved by authorized personnel.
Apply anti-corrosive coating or wrapping on the pipe, as specified (if
metal pipes are used). Ensure that the tested pipe joints are not
disturbed.
Insulate hot water pipes with the specified material.
Note: Wherever possible, pipes may be pre-insulated/pre-wrapped,
leaving joints, prior to installation in the wall chase.
Close
As thethe
namewallsuggests,
chases with cement mortar.
a Concealed If site
Cisterns conditions
a type require
of flushing a
cistern
depth fitted
that's of more thanthe
within 100mm to be chased,
wall, behind a Ledgeitwall,
is advisable
or withintoa use a suitable
Cabinet,
mesh while
popularly plastering
known as walland ‘making
hung good’.
toilets. ... Concealed Cisterns is a dual
flush valve that generates water savings
Mark for pipes on the plastered shaft walls according to details in the
working drawings. Ensure that the plastering is completed as it will be
almost impossible to plaster walls after the pipes are in place.
Fix brackets as per details shown on the working drawings. A clear gap
of 25 to 50mm shall be maintained between pipe and wall surface.
Clamp pipe assemblies on to the brackets. Make sure the pipes are in
‘line’ (horizontal runs) or in ‘plumb’ (vertical stacks). Where expansion /
contraction will be a concern, ensure that pipes are not rigidly held to
brackets.
Make cut-outs on the shaft walls for branch pipes at locations shown on
the drawings.
Insert sleeves wherever required. Ensure that annular space in sleeves
is not more than 25mm. Annular space shall be filled with yarn and
flexible sealant after installation of pipe through the sleeve.
Provide branches on the pipe assembly for connections to internal
pipework. Provide isolating valves on water supply pipes at locations
shown on working drawings; at easily reachable heights.
Test the pipes for leaks under specified pressure for the specified
duration.
Tests must be witnessed and approved by client’s representative.
Paint the pipes as per approved colour code and provide identification
labels where called for.
Take measurement of pipes installed. A representative of client must be
present and should acknowledge the records.
Terminate soil, waste and vent pipes with vent cowls at specified heights
above
Sanitary terrace level.
fixtures & CPEnsure
fittingsthat vent cowls are not terminated within one
meter (horizontally and
Flush the installed pipework vertically)
(waterfrom anyand
supply window openings.Terminate
drainage) to remove
water supply risers with automotive air vents (with isolating valves) and
debris or blockages, if any.
down pipes with drain plug/drain valve – all as per drawings. Ensure that
Install sanitary fixtures, faucets and washroom accessories. Use screws
water supply pipework would be self-venting and self-draining.
with nylon washers to fix vitreous chinaware and PTPE tape for
installation of faucets to pipework.
Check CP fittings for leaks and firmness. Refit them if necessary. Ensure
that proper tools are used. They must not make scratches or any other
kind of damages on the chrome plated fixtures.
Commission the toilets in the presence of the client’s engineer.
Handover the toilets formally using the forms provided for the purpose.
Disinfection
Sanitary fixtures & CP fittings
Flush the installed pipework (water supply and drainage) to remove
debris or blockages, if any.
Install sanitary fixtures, faucets and washroom accessories. Use screws
with nylon washers to fix vitreous chinaware and PTPE tape for
installation of faucets to pipework.
Check CP fittings for leaks and firmness. Refit them if necessary. Ensure
that proper tools are used. They must not make scratches or any other
kind of damages on the chrome plated fixtures.
Commission the toilets in the presence of the client’s engineer.
Handover the toilets formally using the forms provided for the purpose.
Disinfection
The water distribution system should be thoroughly disinfected before
being put to use. The following simple procedures will ensure satisfactory
results:
Flush and clean water tank(s) and distribution pipework with potable
water to remove dirt and any foreign matter.
Fill the tank(s) with water mixed with chlorine solution at the rate of 50
parts per million. Retain chlorinated water in the system allowing the
chlorine to spread throughout pipework.
Open the farthest draw-off points or drain plug/valve to draw water.
Repeat the procedure till odour of chlorine is felt at all locations when
checked at random.
Pipes in sunken floor or suspended in ceiling (Drainage)
Make sure that base water-proofing of toilet floors is completed.
Locate and mark positions of soil and waste outlets. Make core drills
where necessary.
Assemble pipe headers and connect them to branches left in the shaft for
this purpose. Pre-fabricate wherever possible.
Make sure that pipes are in proper slope and are supported adequately.
Always ensure that the spacing of supports is as per specifications.
Ensure that floor traps are installed in level (not tilted) so that the water
seal is not diminished.
Test the pipes and attend to leaks, if any.
Supervise the filling of sunken floors by civil contractor so that the
alignment and slope of drainage pipes are not disturbed. It is in the
plumbingthe
Venting contractor’s
grease trap interest to ensurerequirement
is an important that water proofing of the core
drills
of theispre-treatment
done and tested. installation. The venting
Keep
pipework all openmustends be 100mmplugged to prevent
diameter ingressAll
minimum. of construction debris.
Excavation4.1.1
Mark fortrap
grease pipes onUpon confirmation
the plastered
installations must have: shaftofwallsthe proposed
accordingpipe route as
to details per
in the
item
•working 2.4
Two 100mm above
drawings. the
vents excavation
Ensure
open to that for
thethe the pipe
plastering for
atmosphere will
is completed as it will be for
commence. Excavation
pipe
almost trench will
impossible
cross ventilation be carried
to plaster out by
walls means
after of
the backhoe
pipes areexcavator
in place. or
hydraulic
Fix brackets excavator.
as per Excavation
details shown
• An induct vent, high level directly off the grease is closely
on the monitored
working to
drawings.preventA clearovergap
excavation.
of 25
arrestor to 50mm Once shallexcavation
be maintained is completed,
between the
pipe reduced
and wall level at
surface. the
bottom
•Clamp oflevel
A highpipe the trenchvent
assemblies
educt is taken.
onofftothe This
the is required
brackets.
incoming Make for computation
drainage sure the pipes of are
the in
excavated
‘line’ (horizontal
Sufficient materialand
ventingruns) for compliance
or in ‘plumb’
will allow cooling (vertical to thestacks). Where expansion /At
of the wastewaterdesigned pipe level.4.1.2
area
to with
contraction bad
a suitablewill ground condition,
be a concern,
temperature, appropriated
ensure
enabling thethat pipes
separationshoring
areofnot shall be held
rigidly provided
to to
avoid
brackets.the sides of excavated
the oil and grease from the wastewater prior to trench from collapse and ensure safe
working
Make condition
flowingcut-outs
to on the
the sewer. within thewalls
shaft pipe for trench.4.2
branch pipes Dewatering of pipeshown on
at locations
trench4.2.1
the drawings. At area with high water table or during raining season,
dewatering
Insert sleeves pump shall be
wherever used to Ensure
required. removethat water withinspace
annular the pipe trench in
in sleeves
order
is not tomoreprovidethan a25mm.workable condition
Annular spaceforshall the bepipelaying,
filled withwelding
yarn and and
other
flexibleassociated
sealant after works within the
installation ofpipe
pipetrench.4.3
through the Pipe laying4.3.1 Pipe
sleeve.
laying will be carried out as soon as trenching is completed. Pipe to be
METHOD
laid will firstAND SEQUENCE
be inspected OF CONSTRUCTION
for damaged of external wrapping Any material
and welded
delivered
ends to betowire the brushed
site not confirming
clean to remove to the approved
mud/ dirt beforematerial submittal
placing into
shall be returned
position.4.3.2 Pipe towill
thebe supply
laid to andthereplaced
lines andwith approved
levels shown material.
on the
No materials
drawings or as willotherwise
be permitted directedto enter
by SO. the The
workalignment
locations for without
layingbeing
of
inspected on arrival to the site. Work
pipes will strictly follow the alignment pegs given by the surveyor. shall be carried out by the site
personnel
Water tightness undertest6.1
strict supervision
After a length andofguidance
pipeline has of the
been concerned
completed, it
engineers/
will be water supervisors/
tight testedforeman.against stop QA/QCends. The inspector/
testingengineer
will be carriedshall
check all the installations as per the installation/Test
outat approximately 2 km in length in between washouts or air valves. check sheets.
WIR will be prepared, signed by the subcontractor
The stop ends will be closed by approximately end caps with sufficient and shall be submitted
without
strengthdelay to Contractor/Consultant
to withstand the test pressure6.2 for The
theirwater
inspection
sourceand for approval
the water
as per approved
tightness test willITP. REE is
be obtained responsible
from adjacent for water all the
pipeinstallation
line or from the
activities
stream where for getting
afterfromthe work
Existing inspected
pipe line and approved
is not available.by If stream water
Contractor/Consultant. 6.2 Installation
is taken, it will be free from silt, contamination and pollution and procedure of uPVC Pipeagreed
Work
for
by SOWater Treatment Plant 6.2.1 General Requirements All the
materials received at site will be inspected, upon receipt. Any
discrepancies, damages, etc. should be notified and report to the
Thoroughly
No materialsclean will be thepermitted
pipe surfaces
to enter withthedamp
workcloth and let
locations dry thebeing
without surface. In case, if any foreign materials remain on the surf
Fireighting
inspected on arrival to the site. Work shall be carried out by the site cut pipes with a pipe cutter – machine mounted or m
Piping Cutting-Based on the approved shop drawings, square
For pipe sizes
personnel under of strict
2” and below, thread
supervision andthe pipe end
guidance of using the standard threading machine having BSPT dies. The threading m
the concerned
The pipes will
engineers/ be cut to the
supervisors/ actual
foreman. required
QA/QClength and threaded
inspector/ engineer fromshallboth sides. The pipe will be tapered and the threads will b
Pipe
checkJointing- The joint compound
all the installations as per thewill be applied on check
installation/Test the alesheets.
portionof the thread for itting assembly. The branches will be eithe
Fabrication
WIR will be & Installation
prepared, of Grooved
signed Pipe-The Floor
by the subcontractor andwhere
shallthe
be grooving
submittedmachine is placed will be protected with a cover of PV
Grooved itting is applicable for pipe sizes of 2 ½”
without delay to Contractor/Consultant for their inspection and approval and above. Pipes will be inspected to ensure plain ends. (NO Beveled ends).
Before assembly,ITP.
as per approved the grooved
REE isjoints will be cleaned
responsible for all thefrom any dust, debris, etc
installation
The branches
activities will bethe
for getting assembled at the fabrication
work inspected and approved shop byor on spot as per site requirements, All the open ends will be plugged
Fabrication of Pipe at Location
Contractor/Consultant. of Mechanical
6.2 Installation Tee of uPVC Pipe Work
procedure
The pipe will
for Water be marked
Treatment Plantat the
6.2.1 location
General of the mechanicaltee.The
Requirements All thepipe will be holed drilled to the suitable size of the branch an
Installation / Hanging of FF Piping system on
materials received at site will be inspected, upon receipt. Any Site
Complete
discrepancies, the marking
damages, of the
etc.routes
shouldofbe the pipe work
notified and by following
report to thethe approved shop drawings, combined services drawings an
After
supplier
Removal marking
for the
further
of floatable pipe routes,
action.
and depth the
All
postponed anchoring
particles between parking spaces) to the required support spacing as shown on the ap
construction/ points will
inspection/ be drilled
testing according
works
Parking
M10
shall be space
Anchors
carried width
willoutbeinand
used to
accordance (andwith
support distances
4” and below pipes
specifications. while
Work M12
shall beAnchors will be used to support 6”pipes and above, as reco
areRemoval
dramaticallyof BOD ( Biochemical
reduced since no oxygen
allowance demand)
need
nuts
carriedandoutwashers.
by the Approved
site foreman type of
staff pipe support
under the / be
guidance made
Hanger of forbe
will
site driving
attached to the threaded rods, nuts and washers will be insta
engineer
theRemoval
car into of micro-organic
the parking space which
or formay
the be the cause
opening of car ofdoors
dangerous
(for diseases
drivers
Clean internally
and shall further the pipes
be checked during construction
approved by consultant. If any clearance for access to valves.
and installation. provide
DOMESTIC
and passengers) WASTE WATER and CHARACTERISTIC
Anchors,
damage expansion joints, has
swingbeen jointshappened
and/or expansion
on the loops shallsite
be provided so that piping may expand and contract witho
The
No mainfor
driving reasonthe for material
designingneededof sewage treatment
the carplant
site, the
or building sewer in the cities is domestic wastewater
Installation
persons willlanes
ofbeFeed or ramps
mains are
responsible / Wet
for theStand to drive
Pipes
damage. to/from the
entrance/exit to a parking
Piping shall generally be runspace
parallel to walls and beams. Coordinate with other trades before finalizing the location of any pipin
Ceilingaheight
Install complete is minimized
combinedsince there pipe
fire stand is noandpedestrian traffic (drivers
and passengers)
sprinkler system with in theallparking
piping, area,
valves, andhangers, signs, valves, tests, etc., as per approved shop drawings. Furnish and install
No
Sealwalkways,
all valves,stairways
not provided or elevators
with tamper are needed
switches, to in
accommodate
open position by approved means. Flushing connection shall be as per N
pedestrians in the parking area
Installation of Sprinkler Heads & Accessories
Installation of sprinkler heads will be done after pipe work flushing is completed.
Apply the PTFE tape only to the male portion of the sprinkler and install the upright sprinkler head using the wrench provided b
Fix the sprinkler floor control valve as per the approved shop drawing. Ensure that valves are located at an accessible location
Ensure that the sight glass of the test / drain valve is free of damage. Ensure that test / drain valves are provided as shown on
Installation of Cabinets, Hose Reel Valves and Fire Extinguishers
Prior to the installation the Project Engineer / Foreman will read, understand and strictly follow the manufacturer’s instructions.
Examine the location of the hose reel cabinets and ensure that opening is suficient for fixing all equipment and the mounting h
The cabinet (without the equipment) will be installed where applicable. Branches to the hose rack (reel)
/ hose valve will be fabricated and installed on site to ensure actual entry point to the cabinet. Location of Pipe sleeves shall be
Hose reel & valve will be installed as per the manufacturer’s instructions at the correct mounting height. Keep fire extinguisher
Shut off valve will be installed in the piping to the breaching inlet. Breeching inlet will be located at conspicuous location.
Hydrostatic Testing of Pipe Work
Make available a highlighted drawing of area intended for hydrostatic pressure testing. Indicate on the drawing the location of v
Make sure the test witness timing and pressure duration are agreed by the client/consultant.
Place safety warnings at all points where personnel may pass through within the vicinity of testing. Make sure that no equipme
The entire pipe work shall be hydrostatically tested for not less than 2 hours at 15 bars (or 1.5 times the working) pressure with
Physically check and ensure that all pipes undergoing test is strongly supported and addition of pipe work will not introduce un
Make sure that all pipe works are suitably plugged.
Attach the pressure pump to the desired location through an isolation valve, by pass valve and calibrated pressure gauge to in
The drain point will be plugged and the highest point of the system will be considered as the water supply point for pressure te
Fill the pipe with water and connect the test pump to the pipe work at the filling location, bleed all air from the pipe work.
Connect a calibrated and approved pressure gauge and fix an isolation valve just below the pressure gauge.
Apply pressure gradually until it reaches the test pressure. The test pressure will be as per agreed terms and as per Civil Defe
Hold the piping under pressure for duration of 2 hours and observe for any leakage or pressure drop, if the pressure gauge sh
Ensure that all equipment included are thoroughly cleaned and checked.
Ensure that all foreign debris is thoroughly lushed out from the whole pipework system. All automatic controls and safety devic
When various installations have been completed and pre-commissioning has been done, setting of work is to be carried out in
Ensure that all apparatus are working as per specification.
Ensure that all instruments/meters are correctly calibrated with certificates and are accurate.
Ensure that all services are tested and control systems are functioning correctly and are properly set, sequenced or interlocked
Final acceptance test
After the testing and commissioning of the entire firefighting piping system, final acceptance tests shall be carried out prior to th
Prior to the issuance of Certificate of Completion, tests shall be carried out whenever required by the authorities having jurisdic
Health and Safety Requirements
All necessary PPE and safety gear shall be worn at all times during the execution of work,
in full compliance with safety requirements, i.e. Helmets, Safety Shoes, Hand gloves and Safety signs etc.
Safety Checks
Safety checks will be made prior to commencement of work in order to ensure that materials and equipment are in safe workin
Ensure that all the access means-scaffolding, stepladders are of good quality and strength. Do not use weak or broken scaffol
Wear hand gloves whenever working at site
Wear Goggles of adequate visibility, whenever using gas torches, grinders, cutting machines, or doing chipping, drilling etc.. D
Wear safety belts whenever working at heights exceeding 1.5m Safety shoes must be worn always.
Wear full body harness when working at heights exceeding 4m and secure to a strong building or other structure.
Health and Safety Requirements
Sample
2
AllMake
necessaryof material
sure noPPEtwists willform
and be submitted
safety in the
gearrope forduring
shall approval
be worn prior
at all to
fixing. any during
times production work starts."
the execution of work,
"All
3 tees
in Connect
full willthe
compliance belever
of with
the same
safetysize
activating theassafety
the pipes
requirements, gear i.e.connected
toHelmets,
the car top to them, bushed
yokeShoes,
Safety using theoutlets
Hand will only
overspeed
gloves be used
governor
and Safety if theetc.
rope
signs
required
4 Mobilize
Safety outlet
Checksand size check is how
not of the standard
safety gear manufacture."
engages by pulling the overspeed governor rope. Also, ensure that the tension weig
"Reductions
5 Secure
Safety thewill
checks main bebe
will made
ropes made byprior
between means tothe ofcarstraight
commencement through
and counter-weight reducing
of work sockets,
inwedges
order reductions
toinensure
the overhead onarea’s
bendsand
that materials by equipment
bushes
pulley room,will
one
areatina safe
time.workin
not
6 be
Make used."
sure no twists form in the rope during fixing.
Ensure that all the access means-scaffolding, stepladders are of good quality and strength. Do not use weak or broken scaffol
"Valves
7 Conduct
Wear handandperiodical
other in
gloves line equipment
inspections
whenever working will
of the be
siteinstalled
atropes’ whereand
elongation indicated
make sure on thetheyapproved construction
are shortened drawings,
if necessary afterinstallation will beo
a prespecified
flow
8
Wear direction
Install all rope
Goggles ofoffluids."
retaining
adequate clips and ensure
visibility, whenever the safety
using gas pinstorches,
are positions steadily
grinders, cuttingin their place or doing chipping, drilling etc.. D
machines,
"Flexible
8 Car safety
Wear connection,
Platform andwhenever
belts anchors,
Walls guidesatexpansion
Installation
working heights exceedingjoints and1.5m loopsSafety
will beshoes
installed
must where indicated
be worn always. on approved
construction
1 Raise
Wear fullthe
body drawings."
platform
harness andwhen guideworking it onto at theheights
bottomexceeding
yoke. 4m and secure to a strong building or other structure.
"When
2 Makeinstalling
sure there universal
is proper and swingclearance
running type expansion joints the
by centering andaxial movement
aligning of the building structure shall
the platform.
beSecure
3 taken into consideration
it steadily with the at the time
bottom yoke of using
installation."
clamps and isolation pads.
"All
4 chilled
Install all water piping system
walls according to the willassembly
be provided with adequate
procedures and make removable
sure they sections to assist
are vertical andcleaning and for
sized appropriately.
ease of maintenance
5 Carefully lift the ceiling operations,
and connect just the equipment
it firmly connections."
to the walls.
"Screwed
6 Secure the pipecar workcabin andatjoints
the top upusing
to andclamps including and50mm
isolation mildpadssteel pipe Pipe ends will be threaded by the use of an appropria
Threads
7 Inspectwill thebe cut to the
verticality and correct
diagonalsthread of length.
the car body, making sure its center is aligned to the landing door’s center.
After
9 the suitable
Landing Doors and thread Carhas Door been cut, burrs, surplus oil and swarf will be removed prior to the selected fitting being screwed in
Threads
1 Draw the willlevel
be applied
line of the withfinished
threaded floorjoint at compound
all landings. of the approved type.
By means
2 Draw outofonanthe appropriate
car sill, thepipe centerwrench,
line ofthe theselected
door and fitting will beopening’s
the clear screwed width.
onto the pipe thread to the correct tightness requi
Flange d Jointing Procedure
3 Register the positions of the sill’s and header’s holes/brackets and use expander bolts to fix the same.
Fixing
4 Secure of flanges
the sill and to pipe headerendsand willensure
be either they screwed or welded type.
are aligned.
"The
5 type selected
To install the doorfor a specific
panels, application
lift them throughwill thebe carasand perensure
approved theirdetails and in compliance with the
alignment.
specification
6 Do the same requirements."
at every floor.
Gaskets
7 Install the will car’s
conform fronttoentrance
ANSIB 16.21 panels. and ASTMD200.
Follow below steps:
8 Mount the brackets to install the car door drive and make sure it is aligned.
"Clean
9 Secure both
theflange
sill and faces
header to be forjoined.
the car door and ensure the car door panels are aligned.
Hold
10 gasket in of
Installation correct position on clean flange face until flanges meet.
Pit Equipment
Using
1 Inspect onlythe undamaged
buffers forrust damage free bolts, nuts and washers,
from transportation makelubricate bolt threads
sure all relevant and all mating
components surfaces using an automotive gr
are available.
Tighten
2 Mark the bolts in the location
buffers’ sequence byas recommended
checking the layout by drawings.
the manufacturer until full torque is achieved.
Prior
3 Secure to any them pressure
in place testing
by using taking theplace
necessary check,means.and if necessary re-tighten bolts."
Procedure
4 Turn on the of Mechanical
buffers and Joints make sure the limit switch is activated and operates nominally.
TheShaft
11 mechanical joint consists of a split coupling housing and an insert-able rubber gasket.
Electrification
"To
7.11.1acceptInstall
"Before starting thethe themechanical
shaftpump trunkingsjoint the
installation andpipe endselectrification
layshaft
process must be grooved.
mechanical AC Grooves
orbundles insidewill
engineer be
thestudy
to achieved
trunking with
sections.
the pump the use of anwritten installation
manufacturers
appropriate
2 Connect
A layout drawing the grooving
wiresshould machine."
for all
belanding
approved door and locks.
pumps should be installed in locations indicated making sure that there is suficient a
Pipe
3
Set grooving
Install and connect
base-mounted and joint thewill
pumps onbeconcrete
wiring installed
for pit stop in accordance
switch, bases
equipment tensionwith the
asweight manufacturers
switch
indicated on and recommendations.
3-pin
drawings. sockets.
Suitable lifting equipment should be used to
"Prior
4 Lay to
the any prefabricated
travelling cable, pipework
terminating being
one released
Install suction and discharge pipe sizes equal to or greater than the diameter ofother
end inside from
the the pipe
control fabrication
panel and shop
the fortoinstallation
water on site,
the connection
pump connections. boxtheonshop manager
the car top. or
to
5 ensure
Install compliance
wiring from the with the
control specification
panel to the requirements."
machinery unit and the main
Install valves of types and at locations indicated that are same size as the piping connecting chilled water pump, bypasses, tes switch
6 Install all
Support pumps landing andcall pipingbuttons and indicators
separately so that weight and connectof piping thesystem
wires. does not rest on pumps or its support.
7 Install
Install the Emergency
piping accessories, Battery
hangers panel andand connectanchors,
supports, the wires. valves meters and gages, and equipment support as indicated for c
8 Finish up
Electrical all connections
Wiring: Install electrical on thedevices control panel.furnished by equipment manufacturers but not speciied as factory mounted. Furnish
9 Install
Verify theelectrical
that intercomwiring and connectis installed the according
wires. to manufacturer’s recommendations and installation requirements. Work to be
12
startCar
upInteriors
until wiring andinstallation
Car Electrification is acceptable."
1 Install the COP (Car Operating Panel) in the car and terminate all wires.
2 Install the hand rail’s brackets and mount it firmly.
3 Install the light curtain to the panels of the car door.
4 Complete the ceiling light’s wire configuration.
5 Install the final limit switch, synchronization switch, deceleration switches, and door zone switches on the roof of the car.
6 Install the junction box on car top.
7 Connect the earth wires to the earth bar.
8 Connect all the control switches, door operator cables, final limit switch, curtain of light cables, car operating panel cables, an
13. Safety
1 Permit to work (PTW) in shafts should be obtained prior to initiate job in the site
2 The skilled worker should only be assigned to the task of installation.
3 All personnel must complete project site EHS induction to work at the site.
4 Ensure the scope of work and specific risk assessment are communicated through Tool Box Talk.
5 Personal Protective Equipment or PPE must be used for the job (hard hat, high visibility vest, and safety shoes, Safety Glass
6 A safety harness is mandatory for working at height. Seek medical inspection person’s having a health problem.
7 All operators and signalman/ flagman must be trained and he or she must be third-party certified
8 Adequate light shall be provided if work at night.
9 Sufficient & suitable methods of access and egress for the delivery vehicles.
10 Signs and traffic signals to be followed speed limit to adhere.
An escalator installation method for installing a thin escalator at a position where a stairway is provided, said thin escalator inc
forming a first drilled portion by drilling an upper floor positioned on an upper side of said stairway and forming a second drilled
accommodating an upper flat portion of said thin escalator in said first drilled portion of said upper floor and accommodating a
2. An escalator installation method according to claim 1, wherein said frame forming said thin escalator main body has a heigh
3. An escalator installation method according to claim 1 or 2, wherein said frame forming said thin escalator main body is cons
4. An escalator installation method according to claim 1 or 2, wherein said frame forming said thin escalator main body is cons
5. An escalator installation method according to claim 1 or 2, wherein at least one of an upper end portion and a lower end por
6. An escalator installation method according to claim 1 or 2, wherein an upper flat portion and a lower flat portion of said fram
Fix the fan with anti-vibration mounts/pans by recommended fittings.
"Fix the flexible duct connector to the fan inlet and outlet and other end of flexible connector to the fan
related ducts, plenum boxes etc. as per approved drawing and manufacturer recommendation/instruction."
Fan shall be inspected against damage during hoisting/shifting and installation.
Clean the interior and exterior of the fan.
An escalator
"Electrical installation
power, controlmethod
wiring, andfor installing
earthing ashallthin be
escalator
carried at outa asposition
detailed where a stairwayapproved
in respective is provided, said thin escalator inc
electrical
forming
shop a first drilled
drawings and asportion by drilling anrecommendations."
per manufacturer upper floor positioned on an upper side of said stairway and forming a second drilled
accommodating
Installation an upper
of ceiling flat portion
suspended of saidFans
Ventilation thin escalator in said first drilled portion of said upper floor and accommodating a
2. An escalator
Check and ensure installation methodand
that clearance according to claimis1,available
proper access wherein at said theframe
placeforming said thin escalator main body has a heigh
of installation.
3. An escalator
"Mark the support installation
location as method according
per approved to claim 1 or 2, wherein
drawing/manufacturers said frame
details and fixforming said thin
the approved escalator main body is cons
anchor
4. An escalator
fastener installation method according to claim 1 or 2, wherein said frame forming said thin escalator main body is cons
in the slab."
5. An
Fix theescalator
hanger rods installation methodasaccording
and supports to claim 1 instruction
per manufacturers or 2, wherein andatapproved
least onedetailof an drawings.
upper end portion and a lower end por
6. An escalator
Provide installation
anti vibration isolatormethod according
as applicable to to
theclaim 1 or 2, wherein an upper flat portion and a lower flat portion of said fram
approval.
7. An escalator
Make sure easyinstallation
access andmethod suicientaccording
clearancetoisclaim 4, wherein
available when carrying
for maintenance andinremoval
said divided
of theportions of said frame from said
fan/motor.
"Shift the fan to the place of installation in a safe manner using hand trolley, fork lift, and crane as applicable. Suicient manpow
shifted to the place of installation."
Ensure air inlet and outlet orientation is as per approved drawing.
"Lift and install the fan carefully on the support.
Engage suicient manpower as required for safe
installation."
"Check the level of the installation in coordination of other service and
approved drawing."
"Cut and trim the support rod after finalizing the level, leave 25mm extra length of support rod for final
adjustment."
"Ensure that the electrical engineer installs the field wiring, control and earthing of the equipment and tighten
all the connections and terminals to the recommended torque."
Electrical power connection shall be done as per approved drawings and manufacturers recommendation.
Attach and fix identification labels on the equipment once the installation is complete.
"During installation & after the units have been successfully inspected, check & clean the unit from all debris and cover with po
the units are available for commissioning."
Method of Ventilation Fan Connections (Ducted Installation)
"Fix the flexible duct connector to the fan inlet and outlet and other end of flexible connector to the fan
related ducts, plenum boxes,sound attenuator etc. as per approved drawing and manufacturer recommendation/instruction."
"Installation of fan to turn or elbow should be at least one fan wheel diameter between the turn or elbow and
Above
the fan Ground Installation
inlet to achieve full of
fandrainage pipes
performance."
"1. Ensure that the mating areas
"In case off discharge side to achieve full fan of spigot andperformance
socket are thoroughly
there should clean
be at and square
least three equivalent duct
2. Install pipes with the appropriate hangers and clamps
diameters of straight ductwork between the fan discharge and any duct turns." at every 1 meter of possible distance."
"3. Set the pipes
Non Ducted installation joints properly and use solvent cement for jointing.
4. Accurate axial
"Installation of fanalignment
with an open of the spigot
inlet prior to
too close tojoining
a wall oris important.
bulkhead will cause reduced fan performance. It is
5. Complete
desirable the joint
to have by applying
a minimum leverage
of one fan wheelto the following
diameter socket the
between andfanusing
inleta and
timber
theblock
wall."to prevent damage."
Under Ground Installation of
Inspection and Testing of Ventilation Fans Drainage Pipes
"Trench Formation ensure that the ventilation fan complies with the speciication requirements and notify the
"During installation,
The trench
main contractor shall /be excavated
consultant by a Hand/Back
in advance at least hoe Loader,
24 hours afterinspection
before the area oftime."excavation is identified, The formation of the trenc
The excavated material shall be placed on one side of
In case of comments, rectify any installation defects and resubmit for approval. the trench leaving the other side clear for pipe handling, and the bed of
occur
"Ensure whilethe excavating
presence / to any
visit of of the underground
a factory authorizedservices." "1. Mark routing
service representative of pipe
to inspect, work
test andaccording
adjust ieldtoassembled
approved shop drawi
componen
2. Install piping as per approved
results in writing and submit to the consultant." shop drawing.
3. All horizontal
Perform drainage
the following ield piping
tests andshallinspections
be installed with
and 2% slope
prepare testunless
reports: otherwise indicated.
4. Install fittings for changes in
Disconnect and lock-out all power switches to fan. direction and branch connections with appropriate branches, bends and long sweep be
5. Sanitary
"Check tees and short
all fasteners, sweepand
set screws ¼ bends
lockingmay be used
collars on theif change
fan, wheel, in direction
bearings, of drive,
flow ismotor
from horizontal
base and to vertical
6. Use long turn
accessories double Y-branch and 1/8 bend fittings if two fixtures are installed back to back or side by side with common dr
for tightness."
7. Do not
Rotate thechange
fan wheel the bydirection
hand and of flow
assuremore nothan
parts90are
degrees.
rubbing.
8. Use the proper size of standard
Check for bearing alignment and lubrication. increasers and reducers if pipes of diferent sizes are connected.
9. Reducing the size of drainage piping
Check the v-belt drive for proper alignment and tension. in direction of flow is prohibited.
10. Install encasement on underground piping according
Check all guarding (if supplied) to ensure that it is securely attached to ASTM A and
674,not AWWA C105/with
interfering A 21.5.
rotation parts.
11.
CheckConnect
operation Soilofand waste
variable piping
inlet vanestoorexterior
discharge sanitary
dampers sewerage piping.
(if supplied) Use transition
for freedom fittings to join dissimilar piping m
of movement.
"1. The piping system
Check all electrical connection for proper attachment. to be tested shall be closed by plugging and blanking all openings in the system in an
2. Suitable plugs are inserted at the lower end of the drain or sewer and at the head of any connections.
3. A suitable bend together with a vertical length of pipe is fitted at the head of the sewer or drain to provide the necessary test
4. Close openings in piping system and fill with water to point of overflow. The sewer or drain under test should be left filled wit
5. During the water test, precautions should be taken to prevent any movement of the drain or sewer.
6. All ends shall be kept plugged after completion of test to protect from debris.
7. After successful testing & Inspection of pipe work, covering of pipe work can proceed as per approved drawing details."
Make
To be sure thethat
certain rainyou’ve
water chosen
outlets are
the approved and of for
right equipment correct
your size.
system, spend some time researching microinverters vs. string in
Install the approved quality rain water outlet as per the specification and approved drawings.
"Fix the
Once thesupports/brackets
equipment ordering in proper
process intervals as peryour
is complete, the standard oradded
property is as perto drawing details, with
your installer’s approved
queue.Your equipment (panels an
supporting materials for vertical rain water Pipes"
Install
4. Solar the vertical
panel rain water
installation: thedrain pipes as per the approved drawings.
big day
Check
The with installation
actual plumb levelisfor
anverticality
exciting dayof the
for pipes
every during & after installation.
solar homeowner. Make allyour
Your solar installer will start by prepping the supports rig
roof and ma
Provide clean-outs at every change of direction and as per drawing.
In order
After thetoelectrical
test the wiring
leakage close all openings
is complete, they will and fill racking
install the pipetowith wateryour
support or smoke
panelswhatever is required
(this is the byofcustomer.
only piece equipment that wi
Inspect the joints for any visible leakage or use soap water. If found any leakage repair it and retest the leakage.
Offertimeline
The the work forfor inspection
the from
installation willclient.
range from one to three days, completely dependent on the size of the system you are insta
Following this local inspection, you will be ready for official grid interconnection. A representative from your electric company w
Wiring: No wiring be carried out until the appropriate tests
required or in the electrical testing section have been done and
the consultant has given his clearance for wiring to commence.
A
No.loop in forminofroom
of points wiringasshall be used as far as practicable or
per drawing.
unless otherwise indicated. Joints in conductors
Quality of materials as per specification(ISI Mark)shall be made
using insulated terminal blocks complying
Location, Line and sizes of boxes, conduits as per with requirements
drawings. of
this
Jointsspecification.
and bends of At conduits
expansion joints adequate slack shall be
left in the cable. Checklist
Provision of fish Where
wire with conduits are installed
extra length ( ≥ 150mmfor wiring
). by
others, a draw wire shall be provided
Cover to outer face and steel ( ≥ 5mm ). between each draw in
position. Where three-phase circuits comprising
Distance between electric and telephone conduits (≥150mm). single-core
cables are installed
c/c distance between intwo
trunking, all cables
conduits of a than
is not less shall3be tied the larger.
times
together
Provisionattointervals
avoid entrynot of
exceeding 200mm.
cement slurry Cables
/ water forming
in system.
part
Check of for
alarm,
the control,
tightness communication
of conduits with or reinforcement
monitoring circuits
shall have identification
Staple to conduit @1000mm sleeves at their terminations.
Identification shall be consistent with the relevant wiring
diagrams. EQUIPMENT REQUIREMENTS The requirements
that will be engaged for Power and lighting System Wiring
works will be as follows: Measuring tape Cutting plier Box
spanner set Bending spring Pipe Wrench Drilling Machine
Crimping tool Screw driver Pulling spring Hammer Common
tools
Wiring: No wiring be carried out until the appropriate tests
required or in the electrical testing section have been done and
the consultant has given his clearance for wiring to commence.
A loop in form of wiring shall be used as far as practicable or
unless otherwise indicated. Joints in conductors shall be made
using insulated terminal blocks complying with requirements of
this specification. At expansion joints adequate slack shall be
left in the cable. Where conduits are installed for wiring by
others, a draw wire shall be provided between each draw in
position. Where three-phase circuits comprising single-core
cables are installed in trunking, all cables of a shall be tied
together at intervals not exceeding 200mm. Cables forming
part of alarm, control, communication or monitoring circuits
shall have identification sleeves at their terminations.
Identification shall be consistent with the relevant wiring
diagrams. EQUIPMENT REQUIREMENTS The requirements
that will be engaged for Power and lighting System Wiring
works will be as follows: Measuring tape Cutting plier Box
spanner set Bending spring Pipe Wrench Drilling Machine
Crimping tool Screw driver Pulling spring Hammer Common
tools
Is there good general illumination (with no glare) throughout
the factory? Is there regular cleaning and maintenance of lights
and windows? Where necessary, are windows or skylights
whitewashed or shaded to avoid glare? Is there local lighting
for close work to reduce eye strain and fatigue? Are "flickering"
fluorescent tubes replaced as soon as possible? Are the walls
and ceilings painted in light colours and kept clean? Is there
adequate emergency lighting in all areas? Are outside areas
satisfactorily lit for work and access during hours of darkness
for security as well as safety? Are computer screens positioned
so that ceiling lighting is not reflected to produce glare for
users? Do windows have blinds to prevent sunlight producing
glare on computer screens?
http://samples.jbpub.com/9781284041835/Electrical_Inspection_Checklists.pdf
http://samples.jbpub.com/9781284041835/Electrical_Inspection_Checklists.pdf
Is the clear height above steps/belt to head high hazards at least 2.3
metres?
Is the step tread clean and flat? i.e. no sharp or knife edges Min
Width 2.5mm
Are all the combs in place? Max. 1 tooth missing in any one comb.
Min comb teeth width 2.5mm.
Are the combs at least 6 mm deep meshing into step/belt guides?
the steps?
Test Handrail - whilst travelling on the Escalator/Moving Walk pull on
the handrail to see if it slides back, should not slide back.
Is the Escalator/Moving Walk Handrail in good condition? ie. no
sharp edges or other hazards where fingers can get caught or
pinched.
Is the clear height above steps/belt to head high hazards at least 2.3
metres?
Is the step tread clean and flat? i.e. no sharp or knife edges Min
Width 2.5mm
Are all the combs in place? Max. 1 tooth missing in any one comb.
Min comb teeth width 2.5mm.
Are the combs at least 6 mm deep meshing into step/belt guides?
Are there any signs of step misalignment – scraping marks on the
sides of the guarding?
Is the step clearance excessive between side of step and guarding?
4mm one side max gap. Total both sides 7mm max gap (pen width
approx 5mm)
ATRIUM JALI
Atrium Brass finished int
Grinding
Grinding
Road side Cera grey sto
FLOORING Bank side flooring
SS GLASS JOB Corridor glass covering
CANOPY Entrance porch 1 install
WTP WTP: Tank, plumbing material, filtration pumps & pannel etc.
COVERING ISMB Covering for ms structure i.e. ISMB towards main staircase in basement
MS LADDER MS ladder for OHT
COVERING FIRE PUMP Covering for fire pump
COVERING CABLE TRAY Covering of cable tray both side of lift
LIGHTING PERGOLA Atrium pergola lighting
TENSILE FABRIC Tensile fabric structure
COVERING HVAC Covering for HVAC duct
LED SCREEN LED Screen installation
ELECTRIC CONNECTION Electric connection
WATER SUPPLY CONNECTION Water supply connection
SEWERAGE CONNECTION Sewerage connection
STORM WATER LINE
Storm water line connection
CONNECTION
POSSESSION Site cleaning for possession
Sub Activity Quantity Unit
Arrangement of material (release the material from
the store if the material is not available in stock, 925 Sqft
indent and shift the material to the workplace)
Arrangement of manpower
Indent of material
Applying primer
ply connection
er line connection
g for possession
Videos Link Link1 Link2 Link3 Methology Checklist
50 100
96 192
Steel work Fabrication Work Painting Work Miscellaneous Work
5 10
15 30
10 10
4 4
16 32
16 32
Daily Deputed Manpower DOS DOF
Working Days
Skilled Labour Unskilled
1 2 5 11-May 16-May
1 2 15 14-May 29-May
2 4 25 14-May 8-June
2 2 5 7-May 12-May
2 2 2 10-May 12-May
2 4 8 12-May 20-May
2 4 8 22-May 30-May
4 8 24 20-May 13-June
20-May 25-May
20-May 23-May
20-May 23-May
20-May 25-May
23-May 13-June
Shop's Stone Cladding 10Sqm
Work Unit Qty Rate
Stone cladding Sqm 10 645.78
V Groove Rmt 36 131
Total Amount 10Sqm
Total Amount Per Sqm
Actual cost Nos rate Amount
Mason 6.15 510 3137
Labour 12.30 310 3813
Total
Sunderies 6950
(Blade and 695
tools)
Profit 15% 1042
Total Amount 8687
Total Amount 869
G.total
10%
Amount remark
6457.8
4686 Approx
11144 Per 10 Sqm
1114 Per 1 Sqm
Remark
1190 1935 Sqm
2380
Per 10 Sqm
Per Sqm 0
Per 10 Sqm
Per Sqm
Amount remark
2260.23
197 Approx
2457 Per 10 Sqm
246 Per 1 Sqm
Remark
1996 9274 Sqm
2994
Per 10 Sqm
Per Sqm
Amount remark
3444
3444 Per 10 Sqm
344 Per 1 Sqm
Remark
451 1760 Sqm
902
Per 10 Sqm
Per Sqm
Amount remark
3767
3767 Per 10 Sqm
377 Per 1 Sqm
Remark
32 120 Sqm
65
Per 10 Sqm
Per Sqm
Amount remark
8072
8072 Per 10 Sqm
807 Per 1 Sqm
Remark
775 1800 Sqm
1162
Per 10 Sqm
Per Sqm
Amount remark
1937
1937 Per 10 Sqm
194 Per 1 Sqm
Remark
172 1277.5 Sqm
475
Per 10 Sqm
Per Sqm
Amount remark
157700
Remark
Amount remark
157700
Remark
Amount remark
28600
699400
1874400
Remark 1145934.3
221917.99
Amount remark
79538
Remark
Amount remark
139216
Remark
amount
3359200.964
765834.6432
4125035.607
1394400
480000
1874400
376000
121100
497100
Amount remark
1145934.319
221917.9932
1367852.312
3739352
373935.2312
4113288
cladding 0.9208611894
Day ZE 4-May
Assign to / Finish
S.No. supervisor` Task Name Main Activity
Problem Solver Date
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander Stone Cladding
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
FOR FOR
3 Deepak Er.Sikander GRANITE GRANITE
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander FLOORING FLOORING
4 Deepak Er.Sikander WITH TOE WITH TOE
Deepak Er.Sikander WALL WALL
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
PLANTER PLANTER
5 Deepak Er.Sikander ATRIUM ATRIUM
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander Plaster for cladding
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander Stone Cladding
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander TOILET TOILET
6 Deepak Er.Sikander TILE AND TILE AND
Deepak Er.Sikander STONE STONE
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander For stone work
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
EXTERNAL EXTERNAL
7 Deepak Er.Sikander PLASTER PLASTER
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
ITALIAN ITALIAN
8 Deepak Er.Sikander FLOORING FLOORING
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
9 Deepak Er.Sikander POLISH POLISH
Deepak Er.Sikander Grinding cutt
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander BASEMENT BASEMENT
10 Deepak Er.Sikander STONE STONE
FLOORING FLOORING
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Harishanker back side
Narendra Singh MS facade Atr
Harishanker facade
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
5 Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh AHPL Fixing
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh Escalators
Harishanker
Narendra Singh facade
Harishanker febrications
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh Shop Signage
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh Cement Board
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh Common area
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh Baffle ceiling
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh Tensile struct
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Jitendra singhNarendra Singh
Jitendra singhNarendra Singh
Jitendra singhNarendra Singh
Jitendra singhNarendra Singh
Jitendra singhNarendra Singh
Jitendra singhNarendra Singh
Jitendra singhNarendra Singh
Jitendra singhNarendra Singh
Jitendra singhNarendra Singh
Jitendra singhNarendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
6 Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
7 Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
8 Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Yogendra Er.Yusuf Khan Brick Work
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan Plaster Work
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan Work
Er.Yusuf KhaNarendra Singh extenal
Er.Yusuf KhaNarendra Singh (Texture
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh SS Railing (B
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh SS Railing St
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Er.Yusuf KhaNarendra Singh
Yogendra Er.Yusuf Khan Aerocon Panel
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
gulab singh Er.Yusuf Khan Wooden Wor
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan Merino
partation in
toilets
Lift
Er Vikas TyaNarendra Singh guiniting Lift Guniting
work
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh lift internal finishing
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh ( LGF &
Er Vikas Tyag
Narendra Singh waterbody )
Er Vikas Tyag
Narendra Singh & PVC core
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh OF
Er Vikas Tyag
Narendra Singh RETAINING
Er Vikas Tyag
Narendra Singh WALL
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh Trimix in
Er Vikas Tyag
Narendra Singh Basement
Er Vikas Tyag
Narendra Singh Area
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh Drain Makin
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh Sump pit Ma
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh Grating Of
Er Vikas Tyag
Narendra Singh drain and
Er Vikas Tyag
Narendra Singh sump pit
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Expansion
Er Vikas Tyag
Narendra Singh
Treatment
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Er Vikas Tyag
Narendra Singh
Jitendra kumJitendra singh Projection ex
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
foundation in
Neeraj kumarJitendra singh
basement
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Jitendra ranaJitendra singh Perapet wall
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Neeraj kumarJitendra singh Water Proofi
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Jitendra ranaJitendra singh Tile Fixing i
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh
Jitendra ranaJitendra singh Whitewash
Neeraj kumarJitendra singh in Pump
Neeraj kumarJitendra singh Room
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh Foodcourt
Jitendra kumJitendra singh Slab
Jitendra kumJitendra singh Extended
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Jitendra kumJitendra singh
Tarvelators
Neeraj kumarJitendra singh
Installation
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj kumarJitendra singh
Neeraj
Amit kumarJitendra singh
Singh/Girdh
Amit Narendra Singh House keepin
ar Verma
Singh/Girdh Narendra Singh
Amit
ar Verma
Singh/Girdh Narendra Singh
Amit
ar Verma
Singh/Girdh Narendra Singh
Amit
ar Verma
Singh/Girdh Narendra Singh
Amit
ar Verma
Singh/Girdh Narendra Singh
Amit
ar Verma
Singh/Girdh Narendra Singh
Amit
ar Verma
Singh/Girdh Narendra Singh HO
ar Verma
Amit Singh Narendra Singh mantinance
work
Amit Singh Narendra Singh
Amit Singh Narendra Singh
Amit Singh Narendra Singh
ayush garg Shiv Kumar Ramp
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar Stiching Slab
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar Polycabonate
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar Trimix Floorin
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
ayush garg Shiv Kumar
Car over
front lifts
Amusement
Front
Water
glazzing body
car lift at
Footing
atrium area
cabanas
Ice cafe
Solar
pannels
near St.1
shivkumar C.E.narender
and S5 (24
signage
shiv kumar C.E.narender
towards RR
Sanjeev
Kumar
Sanjeev/ Md Uvais Alam Flat Handover
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam Tiles Repair
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
/ Md Uvais Alam
Anuj Nehra
Sanjeev
Kumar
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam Installation
Anuj
KumarNehra Md Uvais Alam
Sanjeev/ Work
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/ Plaster
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam Repairing
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
/ Md Uvais Alam
Sanjeev
Anuj Nehra
Kumar / Md Uvais Alam
Sanjeev
Anuj Nehra
Kumar
Sanjeev/ Md Uvais Alam Putty and P.O
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam Final Paint W
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/ Railing and D
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam Installation
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam work
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam installation
Anuj
KumarNehra Md Uvais Alam
Sanjeev/ work
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
/ Md Uvais Alam
Anuj Nehra
Sanjeev
Kumar
Sanjeev/ Md Uvais Alam Acid Cleanin
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam White cement
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam ne room
Anuj
KumarNehra Md Uvais Alam
Sanjeev/ putty work
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam ne room
Anuj
KumarNehra Md Uvais Alam
Sanjeev/ paint work
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam Rain Water Ta
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
/ Md Uvais Alam
Anuj Nehra
Sanjeev
Kumar /
Anuj Nehra
Sanjeev
Kumar
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam Water lodging
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
/ Md Uvais Alam
Anuj Nehra
Sanjeev
Kumar
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam Complaint wo
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra Md Uvais Alam
Sanjeev/
Anuj
KumarNehra
Sanjeev/ Md Uvais Alam
Anuj
KumarNehra
/ Md Uvais Alam
Anuj Nehra
Sub Activity Quantity unit
1935 Sqm
aster for cladding
Arrangement of material (release the material from the store if the material is
1935 Sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Reference line for bunda
Sand Shifting 44.7 Cum
44.7 Cum
Cement shifting 429 Bags
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 1935 Sqm
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing
Mortar mixing
Bunda Laying 1500
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Plaster for cladding 1935 Sqm
Scaffolding and Chali removing 1935 Sqm
Scaffolding and Chali shifting
Cleaning with removing polythine
Curing 7 days minimum
Light Connection for Working
tone Cladding 1935 Sqm
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Stone cutting as per req. 1935 Sqm
V Groove and polish work 1935 Sqm
Stone Shifting 1935 Sqm
Chemical Shifting 28638 KG
Primer Shifting 2902.5 Ltr
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 1935 Sqm
Clean both the surfaces properly.
Light Connection for Working
Remove all the loose particles.
Apply primer first Coat.
Wait for 30 minutes
Apply primer second coat.
Allow it drying for 12 hours.
Make the paste of chemical Ardex Endura Ardiflex Endura accordingly using
water.
Apply the paste on both the surfaces (column and Stone)
Make the use of " travel tool " which make the layers on the surface
Paste/Fix the stone on the surface 1935 Sqm
Checking of stone cladding
Hole cutting As per required
Grouting 1935 Sqm
Scaffolding and Chali removing and shifting 1935 Sqm
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
223 Sqm
aster for cladding
Clearance of services work
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Reference line for bunda
Sand Screering for plaster 5.2 Cum
Sand Shifting 5.2 Cum
Cement shifting 49 Bags
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 223 Sqm
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing 223 Sqm
Mortar mixing
Bunda Laying 167
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Plaster 223 Sqm
Scaffolding and Chali removing 223 Sqm
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
tone Cladding 223 Sqm
Arrangement of material (release the material from the store if the material is
223 Sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Stone cutting as per req. 223 Sqm
V Groove and polish work 223 Sqm
Stone Shifting 223 Sqm
Chemical Shifting 3318.24 Kg
Primer Shifting 334.5 Ltr
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 223 Sqm
Clean both the surfaces properly.
Remove all the loose particles.
Apply primer first Coat.
Wait for 30 minutes
Apply primer second coat.
Allow it drying for 12 hours.
Make the paste of chemical Ardex Endura Ardiflex Endura accordingly using
water.
Apply the paste on both the surfaces (column and Stone)
Make the use of " travel tool " which make the layers on the surface
Paste/Fix the stone on the surface 223 Sqm
Checking of stone cladding
Hole cutting As per required 223 Sqm
Grouting 223 Sqm
Scaffolding and Chali removing and shifting 223 Sqm
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
84 Sqm
Clearance of services work
Ref line and level
Arrangement of material (release the material from the store if the material is
84 Sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Sand Shifting 1.9 Cum
Cement shifting 18.6 Bags
POP Shifting 300 kg
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 84 Sqm
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing 84 Sqm
Stone cutting as per req.
V Groove and polish work 84 Sqm
Stone Shifting 84 Sqm
Stote cladding from POP 84 Sqm
Measuring Box shifting
Mortar mixing
Mortar grouting
Stone pop removing
Checking of stone cladding
Hole cutting As per required 84 Sqm
Grouting 84 Sqm
Scaffolding and Chali removing and shifting 84 Sqm
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
9274 Sqm
Clearance of services and waterproofing work
Area Cleaning
Surface deep cleaning
Ref level marking
Reference layout marking
Arrangement of material (release the material from the store if the material is
9274 Sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Stone cutting with polish as per req. 9274 Sqm
Sand Shifting 463.7 Cum
Cement shifting 3339 Bags
Stone Shifting 9274 Sqm
Measuring Box shifting
Water in the workplace
LVL mark for PCC if required
Checking of level
PCC 9274 Sqm
Curing
LVL mark for flooring
Checking of level
Mortar mixing
curing before plaster
Plaster for flooring 9274 Sqm
Wet the tile 9274 Sqm
Tile spacers arrangement
Cement slurry for tile pasting 9274 Sqm
Tile laying 9274 Sqm
Checking of flooring
Hole cutting As per required
Grouting 9274 Sqm
Cleaning
Curing 7 days minimum
Light Connection for Working
40 Rmt
Clearance of services and waterproofing work
Area Cleaning
Surface deep cleaning
Ref level marking
Reference layout marking
Aggregate Shifting 3.4 Cum
Sand Shifting 1.7 Cum
Cement shifting 32.9 Bags
Water in the workplace
Shuttering, nail and binding wire arrangement
Extra bar removing
Rebaring
Steel binding
Shuttering oiling
layout checking
steel BBS making
reinfocement checking
cover block Foam fixing
wall shuttering 72 Sqm
Plump and alingment
concrete check list and pour card prepare
Measuring Box shifting
Nitobond laying before casting
Hand mixing of concrete
Casting 4 Cum
Plumb and Alignment checking
Deshuttering 72 Sqm
Material shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
aster for cladding 126 Sqm
Clearance of services and water proofing work
Arrangement of material (release the material from the store if the material is
126 Sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Reference line for bunda
Sand Screering for plaster 2.9106 Cum
Sand Shifting 2.9106 Cum
Cement shifting 27.94 Bags
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing
Mortar mixing
Bunda Laying 94.5
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Plaster 126 Sqm
Scaffolding and Chali removing
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
tone Cladding 77 Sqm
Arrangement of material (release the material from the store if the material is
77 Sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Stone cutting as per req. 77 Sqm
V Groove and polish work 77 Sqm
Stone Shifting 77 Sqm
Chemical Shifting 1146 Kg
Primer Shifting 116 Ltr
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing
Clean both the surfaces properly.
Remove all the loose particles.
Apply primer first Coat.
Wait for 30 minutes
Apply primer second coat.
Allow it drying for 12 hours.
Make the paste of chemical Ardex Endura Ardiflex Endura accordingly using
water.
Apply the paste on both the surfaces (column and Stone)
Make the use of " travel tool " which make the layers on the surface
Paste/Fix the stone on the surface 77 Sqm
Checking of stone cladding
Hole cutting As per required
Grouting 77 Sqm
Scaffolding and Chali removing and shifting
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
1760 Sqm
Clearance of services work
Clearance of waterproofing work
Arrangement of material (release the material from the store if the material is
1760 Sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Reference line for bunda
Sand Screering for plaster 40.7 Cum
Sand Shifting 40.7 Cum
Cement shifting 390.3 Baags
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 1760 Sqm
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing
Mortar mixing
Bunda Laying 1320
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Plaster 1760 Sqm
Checking of Plaster
Area Cleaning
Surface deep cleaning
Ref level marking
Reference layout marking
Tile shifting 1760 Sqm
Wet the tile
Tile spacers arrangement
Cement slurry for tile pasting
Tile laying 1760 Sqm
Checking of cladding
Grouting 1760 Sqm
Cleaning
Curing 7 days minimum
Light Connection for Working
or stone work 60 Sqm
Ref level marking
Reference layout marking
ms frame arragement
Ms frame making for counter
ms frame primer work 60 Sqm
ms frame fixing 60 Sqm
checking of level
Cement board fixing 60 Sqm
Stone cutting as per req. 60 Sqm
V Groove and polish work 60 Sqm
Stone Shifting 60 Sqm
Stone laying 60 Sqm
Hole cutting As per required
Light Connection for Working
1277.5 Sqm
Arrangement of material (release the material from the store if the material is
515 sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
quantity of material
indent of material
Scaffolding Fixing
MS wire mesh fixing 445 sqm
Ref Plumbing and alingment check
Bunda Fixing
Checking of Bunda
Guniting work
Plumb of Guniting work
Curing of giniting work
lift pit lvl marking
lift pit dewatering
malwa cleaning
filling of pitt
material shifting for slab casting
BBS making and steel binding
slab casting
scaffolding fixing inside
steel cutting
surface repairing
Wall putty for inside Whitewash 789 kg
Arrangment of men power for whitewash
Arrangement of material (release the material from the store if the material is
350 sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Area Cleaning
Surface deep cleaning
Surface Treatment
Polymer First coat
Fiber Mesh fixing
Polymer second coat
Polymer Final Coat
Waterproofing Testing
Testing to quality Engineer
Protection Plaster
Arrangement of material (release the material from the store if the material is
755 sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
store material shifting
Scaffolding Fixing
Nipple Fixing
Nipple Grouting
MS wire mesh fixing 550 sqm
Batasha nails 3'' 50 kg
Ref Plumb and Alignment
Bunda Fixing
Guniting work
Plumb and Allignment
Curing of guniting work
Arrangement of material (release the material from the store if the material is
75 sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Ref lvl marking
cutting and filling
Dressing and leveling
Sprinkling of water
compaction of soil
benchmark for PCC
Stopper fixing outside
Laying of PCC (M10) 8 cum
Curing of pcc
Steel BBS making 400 kg
Steel shifting
Steel binding
cover block fixing
stopper fixing
arrangment of RMC (m25) 12 cum
Laying of concrete
Channel Fixing for Trimix
Top level checking
Laying of Concrete for Trimix (M25) 8 cum
Surface Treatment (gouming)
Channel Removing
Curing of trimix
Groove Cutting as per reqd.
Arrangement of material (release the material from the store if the material is
75 Rmtr
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Layout marking of drain
Ref level marking
excavation for drain
Dressing and leveling
Sprinkling of water
compaction of soil
benchmark/lvl mark for PCC
laying of pcc
Brick work for drain
PCC bend at to of brick work
Cement plaster of drain with W/P compound
Checking of drain slope
Curing of plaster work
Arrangement of material (release the material from the store if the material is
1 nos
not available in stock, indent and shift the material to the workplace)
malwa removing 12 m^3
Monpower Arragement
Layout marking of sump pit
reqd. quintity of material
indent of material
shifting of material
Ref.Level marking
excavation for drain
Dressing and leveling
benchmark/lvl mark for PCC
laying of pcc
Brick work for sump pit
Steel cutting (BBS making)
Steel binding
cover block fixing
Laying of concrete in floor area
Layout marking and starter
side wall steel binding
foot rest fixing
cover block fixing
wall shuttering
Line and alignment
pouring of concrete
Deshuttering of wall
Cement plaster of drain with W/P compound
Arrangement of material (release the material from the store if the material is
2914 kg
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Marking of layout
cutting of MS angle
main frame welding
subframe welding
grinding
red oxide primer coating 10 litr
shifting of material
frame fixing
enamel paint one and more coat 50 litr
Arrangement of material (release the material from the store if the material is
150 Rmtr
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Scaffolding Fixing
Remove the theromacaol sheet
RCC surface to clean properly
Surface Treatment
Fixing of EDPM fire stone fixing with epoxy Adhesive
Aluminum Sheet ,hole and sloote fixing with ss screw fastner
GI plate fixing Slooted with ss screw Screw fastner
SS plate fixing Slooted with ss screw Screw fastner
Arrangement of material (release the material from the store if the material is
70 SQM
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Material Required.
Indent of material
Ref Level marking
Slab shuttering
shuttering levelling
drilling for rebar
Slab cleaning and oiling
steel rebaring
steel BBS making 1110 kg
Steel binding
cover block fixing
outer shuttering and cutout fixing.
Clereance of services work
Arrangment of RMC(M25) 14 cum
laying of concrete
Mad making for curring
pounding of water
Arrangmant of material 45 sqm
Arrangmant of men power
layout/lvl marking
steel rebaring
steel binding
outer shuttering fixing
laying of concrete M 20 11 cum
Deshuttering
curring as need
Arrangement of material (release the material from the store if the material is
195 RMTR
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Wall layout marking
Wall starter making
BBS making
Steel binding
cover block Foam fixing Cover Block (40mm) 780 nos
Clearance for Services
Wall shuttering fixing 480 sqft
line and alingment checking
Pouring of concrete (M25) 32 cum
Deshuttering of wall
line and alingment checking
date marking
curring on regular bassics
Arrangement of material (release the material from the store if the material is
5.5 SQM
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Reqd.material
Indent of material
scaffolding fixing
steel cutting and cleaning
Surface deep cleaning
Surface Treatment
nipple fixing
nippel grouting
Fiber Mesh fixing
Polymer second coat
fastflex coating work
Waterproofing Testing
Protection Plaster
Arrangement of material (release the material from the store if the material is
475 SQM
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Reqd.material Tile 5100 sqft
Reqd. Material Course sand 635 cft
Reqd. Material cement 204 bags
Indent of material
scaffolding fixing
material shifting
Ref line and plump
Bunda fixing
Preportation and mixing of mortar
Tile fixinng
Clour peegment fillng
Surplus material reshiffitnig
Cleaning
curring on regular bassics
Arrangement of material (release the material from the store if the material is
310 SQM
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Reqd.material Putty 400 kg
Reqd.material Paint 100 ltr
Indent of material
scaffolding fixing
Surface Treatment
covering of equpment
One coat of wall putty
2nd coat of wall putty if required
one and more coat of paint
Descaffolding
Cleaning Properly
Arrangement of material (release the material from the store if the material is
130 SQM
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Reqd.material
Indent of material
scaffolding fixing
Ref line and lvl marking
Drilling for plate
MS plate fixing
line and level of plate
Cutting and Febrication
welding and grinding
line and level checking
One coat of Primer
Line and level marking
Balance RCC Structure At UGF lvl and LGF
Arrangment of material
Arrangment of men power
scaffolding fixing
Shuttering fixing for projection
BBS making and binding
line and levelling checking
cover bolck fixing and outer side fixing
arrangment of RMC
Concrete pouring
Deshuttering of Slab
curring on regular bassics
Pit making at LGF lvl
Cutting and chipping as per required
All noising size to be clear with all respect
core cutting reqd for working as per required.
arrangment of hangging (extra MS beam)
Drilling for plate as per required
MS plate fixing
support welding as per required
Arrangment of material
Usable material Stocked properly
Surplus material shift to store
Non Usable material shift to yard
scape material shift to scrape yard
Floor cleaning stair case and floor
SS railling And shop Glass celaning
Way to marketing office and around the site clean
Arrange of material as per need 3766 sqft
arrangment of men power as per required
Searching of new vender as per site requirement
Coordinate with the vender for waterproofing work
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Retaining wall layout.
layout checking
steel BBS making 7 MT
steel binding 7 MT
reinfocement checking
cover block Foam fixing 400 Nos
wall shuttering 247 Sqm
Plump and alingment
concrete check list and pour card prepare
Arangment of RMC 50 Cum
wall casting
Plumb and Alignment checking
Wall de shuttering
date marking
curring on regular bassics
Level marking
Slab and beam shuttering 550 Sqm
bottom line and alingment
slab shuttering
slab levelling and cleaning
shuttering LVL checking
Oiling work for shuttering
drilling for rebar 650 Nos
steel rebaring 650 Nos
Beam and slab BBS making 28 MT
Beam and slab steel binding 28 MT
salb reinforcement checking
Clearance for Services
outer shuttering and cutout fixing.
Pour card and check list prepere
arrangment of RMC 150 Cum
Pouring of concrete
pounding of water
Arrangement of material (release the material from the store if the material is
580 Sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
PCC surface neet cleaning
BSS cutting and making
Steel binding 1150 kg
Cover block fixing 560 Nos.
outer Shuttering fixing
arrangment of RMC 85 Cum
Laying of concrete in floor area 580 SQM
Drawing and
decision pending
Deshuttering work
curring on regular bassics
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Ref Level marking
ref line marking
Drilling for plate fixing
MS plate fixing 480 Kg
Alingment of ms base plate
frame making 2900 Kg
scaffolding fixing 3200 Sft
frame fixing 2900 Kg
frame line and allingment checking
one coat of red oxide primer 20 Litter
Polyycarbonate sheet fixing 300 SQM
Silicon filling 68 Litter
descaffolding 3250 Sft
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
floor level marking 1500 SQM
chenal fixing 1500 SQM
concrete Laying 115 Cum
top suface treatment 1500 SQM
Arrangement of material (release the material from the store if the material is
2960 Sqm
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
scaffolding fixing 2960 Sqm
Surface Treatment 1500 Sqm
steel cutting 1460 SQM
Joint reparing with wall putty 300 kg
sanding work with empery paper 160 Nos
One and more coat of wall putty 2400 Kg
sanding work with empery paper 100 Nos
one coat of primer 640 Litter
drawing and
decision pending
drawing and
decision pending
one and more coat of paint 850 Litter
Desacffolding work 2960 Sqm
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement Drawing and
decision pending
Drilling work for fixing 120 Nos
speed breaker instullation 8 R.Mtr.
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Raod sinage fixing
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Stone cutting as per req. and cladding work 8200 Sft
Stone cladding work (RR and rear side) 3100 Sft
V Groove and polish work 4000 Rft
Stone Shifting 11300 Sft
Water in the workplace
Scaffolding and Chali shifting
Sand shifting 53 Cum
Cement Shifting 378 Bags
Scaffolding binding and Chali fixing
Checking of stone cladding
Hole cutting As per required
Grouting 10 kg
Scaffolding and Chali removing and shifting
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
Ahpl cladding work 3000 sftand
Drawing
M.S. framing work for AHPL decsoin pending
3.6 MT
FRP jali installation (Both Side) 200 Sqm
Acrylic box fixing with S.S. frame 48 Sqm
Clearance of services work
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Reference line for bunda
Sand Screering for plaster 100 Cum
Sand Shifting 100 Cum
Cement shifting 645 Bags
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing
Mortar mixing
Bunda Laying
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Plaster
Checking of Plaster 19800 sft
Area Cleaning 19800 sft
Surface deep cleaning 19800 sft
Ref level marking
Reference layout marking
Wet the tile
Tile spacers arrangement 5000 Nos
Cement slurry for tile pasting
Tile laying 15200 sft
Tiles cladding work 4600 Sft
Grouting 303 Litter
Cleaning
Curing 7 days minimum
Light Connection for Working
Gaurd room door and window 10 Sqm
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
water proofing with fast flex layers 12000 Sft
Monpower Arragement
Level marking
cutting and filling 28420 sft
Dressing and leveling 28420 Sft
water sprinkling 10000 Litter
compection of soil by roller 28420 Sft
level checking
Clearance of services work
first layer stone laying 90 to 63 mm 512 Cum
Stone layer compection oby roller 28420 Sft
level checking
secound layer stone laying 45 to 63 mm 384 Cum
Stone layer compection oby roller 28420 Sft
level checking
GSB filling work 306 Cum
water sprinkling 25000 Litter
layer compection by roller 28420 Sft
level checking
Prepretion level for PCC 28420 Sft
Chenal and level marking for pcc 28420 Sft
laying of concrete 263 Cum
ABS drain chenal fixing with sloop 400 Mtr.
layout and level marking for stone and tile laying 15200 Sft
Cleaning and epoxy filling in joint 303 Litters
ready made bench instullation 36 R. Mtr.
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Cleaning of debries
filling with planter soil 3200 Cum
plantation of trees
grass covering
granite stone step fixing 760 sft
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Foundation or base making for scuptures
stone fixing at top lvl
instullation of scruptural
Fixing of light fixtures if any
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
Monpower Arragement
Removing of exiting Structure
claening of debries
layout and level marking
excavation 2 Cum
PCC 1 Cum
Steel binding of footing (total steel works) 100 Kg
RCC footing 1.5 Cum
RCC of wall steel binding and shuttering work 15 SQM
Casting RCC wall 1 Cum
complection of foundation work
instulation of electrical and plumbing
water proofing with fast flex layers 20 sqm
Tile and stone fixing 250 Sft
fixing of pump and nozzels
S.S. work 350 Kg
instullation of light fextures
Installation of sculpture
hand over with working with all respect
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
manpower arrangement
Shuttering material shifting work 6000 CFt
Scaffolding fixing 2 Cum
Column layout 3.5 MT
Stater filling 5 cum
RCC of First lift cols. 3 cum
Casting RCC second lift cols. 3 cum
RCC tie beam at lower ground floor level 4.5 Cum
RCC cols first lift 3 cum
Casting RCC second lift cols. 3 cum
RCC tie beam at ground floor level 4.5 cum
Monpower Arragement
Rebaring chemical 5 litter
Reference Line marking
Reference LEVEL marking
Cutting And Chipping as per need
Drilling for Plate fixing 520 Nos
MS plate fixing 780 Kg
MS Plate line and alignment
Frame making 60 MT
Double coat primer 247 litter
Scaffolding fixing (A) 600 SQM
Frame Shifting 60 MT
frame fixing 60 MT
Frame Line & Leveling
frame support fixing
Arrangement of material (release the material from the store if the material is
not available in stock, indent and shift the material to the workplace)
manpower arrangement
Scaffolding fixing (A) 1000 Sqm
Sheet Making 895 Sqm
Sheet fixing 895 Sqm
Sheet line and leveling
Polytheen removong 895 Sqm
Sillicone pasting 150 litter
Sheet cleaning 895 Sqm
Drawing and
layout marking for ss slotted chanel decsion pending
Toy Tran
cricket simulator
Robot football
Drawings
Foundations
Installation
Testing
Commisioning
Handing over
Final handover
Base frame structure 16 MT
Fixing of FRP jaali ( Single side) 140 SQM
Fixing of LED modules 87.77 SQM
Fixing of flex 422 SQM
Cleaning
Manpower Arragement 15 Flats
Material arrangement and shifting work
Surface cleaning and sanding
Putty and P.O.P mortar making
P.O.P repairing
Sanding work
Putty work
Cleaning Work
Manpower Arragement 44300 Sft
Material arrangement and shifting work
Sanding work
Final Paint work
Cleaning work
Manpower Arragement 15 Flats
Material arrangement and shifting work
Sanding work
Paint work
Cleaning work
Manpower Arragement 15 Flats
Material arrangement and shifting work
Electrical fitting Installation work
Cleaning
Manpower Arragement 15 Flats
Material arrangement and shifting work
Plumbing fitting installation work
Cleaning
Manpower Arragement 15 Flats
Material arrangement and shifting work
Acid cleaning work
Manpower Arragement 15 Flats
Material arrangement and shifting work
White cement grouting work
Client visit for handover
Manpower Arragement 5000 Sft
Material arrangement and shifting work
Sanding work
Putty Mixing work
putty work
Cleaning work
Manpower Arragement 5000 Sft
Material arrangement and shifting work
Sanding work
Paint work
Cleaning
Rain water holding tank making work
Refrence level transfer and marking work
Excavation work 24.69 Cum
Tank PCC 1.5 Cum
Layout of tank
Tank Reinforcement work floor slab and wall
Cover block fixing work
Floor slab castinng work 2.46 Cum
RCC wall binnder binding work
Tank foot rest fixing work
Wall shuttering work 59.85 Sqmt
Cover block fixing work
Wall casting work 17.95 Cum
Tiles Repairing
Putty and POP repair (hair cracks repairing)
Door & Door Fittings repair work
Seepage work
Paint touchup
Tiles and stone repairing in comman area
Paint touchup in comman area
Elevation patta +60 mm repairing work
Video Link 2 Video Link 1 Video Link 3
https://www.youtube.com/watch?v=Ydo3-DgP2kY&t=290s
https://www.youtube.com/watch?v=AOFR3rHkceA&t=979s
https://www.youtube.com/watch?v=dt6xdarVWqA
https://www.youtube.com/watch?v=Nrvg-m-LNxs
https://www.youtube.com/watch?v=AbJ5Y4cHzrM
https://www.youtube.com/watch?v=6Mi0yD2luBY
https://www.youtube.com/watch?v=NzfobHoKJbA
https://www.youtube.com/watch?v=55lgyF-gAMs
https://www.youtube.com/watch?v=PhPKFXeJqeU&t=498s
https://www.youtube.com/watch?v=nU0_EbHoIcY
https://www.youtube.com/watch?v=jkyvesz6R10
https://www.youtube.com/watch?v=VFuw5Q5Innk
https://www.youtube.com/watch?v=mHCPf-w-3qY
https://www.youtube.com/watch?v=OqImODy8rgA&t=323s
https://www.youtube.com/watch?v=2aObmO-D880&t=8s
https://www.youtube.com/watch?v=3qRRBlvUbSY
https://www.youtube.com/watch?v=iO-Bcf5WoCI&t=52s
https://www.youtube.com/watch?v=t_sSfsS1gxQ&t=406s
https://www.youtube.com/watch?v=gjt7wvA_llU
https://www.youtube.com/watch?v=TepPPSSwTjk
https://www.youtube.com/watch?v=U1SdYO0M0hg
https://www.youtube.com/watch?v=QzotiOSbFm4
https://www.youtube.com/watch?v=GAEQutGjZ9c
https://www.youtube.com/watch?v=0XPQemf9_Us
https://www.youtube.com/watch?v=wePycUgMWis
https://www.youtube.com/watch?v=JhGYPvJYVQw
https://www.youtube.com/watch?v=avyy_iEJKxY
https://www.youtube.com/watch?v=8NUFYGE4Lug
https://www.youtube.com/watch?v=jLcpoI1keo0
https://www.youtube.com/watch?v=PFmgBrJCAj0
https://www.youtube.com/watch?v=1SfsR-96f5U
https://www.youtube.com/watch?v=ut2ioSMtOwg
https://www.youtube.com/watch?v=Xaeo2npSpYY
https://www.youtube.com/watch?v=SPcd_eYXr-8
https://www.youtube.com/watch?v=KM5mgKjiEOg
https://www.youtube.com/watch?v=gVkDB5adMxc
https://www.youtube.com/watch?v=8Z25dZWSC8Y
https://youtu.be/6M2GRK3jyVE https://www.youtube.com/watch?v=neLYzmJLW6E&t=62s
https://youtu.be/f98QM_2Nje8
https://www.youtube.com/watch?v=2-fk8rjPyJI&t=198s
https://youtu.be/2-fk8rjPyJI https://youtu.be/K2gltOWcL_0
https://youtu.be/6u1cOhVn9Bo https://youtu.be/HbZ-QEZx8gk https://youtu.be/8UHU4bAxwvM
https://youtu.be/m0mnwCWFLRQ
https://youtu.be/fp3soXUJD_Q https://youtu.be/P0l-SfmTVuU
https://youtu.be/u7pylpmWcA0 https://youtu.be/mYon16oW8kA https://youtu.be/T1D2FtADNzM
https://youtu.be/m0mnwCWFLRQ
https://youtu.be/P0l-SfmTVuU https://youtu.be/P0l-SfmTVuU
https://www.youtube.com/watch?v=vLNmpK9YjL8
https://www.youtube.com/watch?v=z_UqLuQDZog
https://www.youtube.com/watch?v=FJdQhUBPKC
https://www.youtube.com/watch?v=NCtaBSa8wAE&feature=youtu.be
https://www.youtube.com/watch?v=9Ccu-_IupP4&feature=youtu.be
https://www.youtube.com/watch?v=4m7JH_xKAxg
https://www.youtube.com/watch?v=jmWpO6UlZMU&feature=youtu.be
https://www.youtube.com/watch?v=mupsAagePLg&feature=youtu.be
https://www.youtube.com/watch?v=F4E2V1QkSLo
https://www.youtube.com/watch?v=YIh6qmXRaJE&feature=youtu.be
https://www.youtube.com/watch?v=0N_ffzOVjbs&feature=youtu.be
https://www.youtube.com/watch?v=CFAzsQrJylI&f
https://www.youtube.com/watch?v=1AOPkfUtW1M&feature=youtu.be
https://www.youtube.com/watch?v=7N0As9RehIE&feature=youtu.be
https://youtu.be/OYdcdDK2XYY https://youtu.be/3j1W_rHbVIg
https://www.youtube.com/watch?v=DCd5yjmZKus
https://www.youtube.com/watch?v=7k2peVMYvUg
https://www.youtube.com/watch?v=zV2aLS3IyQk
https://youtu.be/xeU-uFbQEG0 https://youtu.be/SMQeXAiwTUw
https://youtu.be/lnIcMJlr73o https://youtu.be/01CoOa0KtG4 https://youtu.be/Btqza1lnUjg
https://youtu.be/M4C9ncE2fYA https://youtu.be/qDPhTKXgIRE https://youtu.be/KNT7FhuXttA
Labou Carpai
Checklist Methology Mason Massion Labour
r nter
1190 2380
149
156
137 274
10 10
69
52 103
4 4
26
1996 2994
175 524
173
998
166
173
2 2
2 2
4 12
2
7
47 47
24
31
451 902
10 10
90
97
12
16 32
172 344
28 28
86
93
775 1162
40
10 25
77
84
413 413
32 65
16
23
U4bAxwvM
18 52 28
4 15 2
14 80 30
3 6
94 75
6 10
2 2
1
30
10 10
2
2
50
2 2
1 1
2
12 16
20 40
1
1 1
6 6
6 6
68 68
2 2
360 360
150 150
6 6
120 120
100 200
100 200
100 255
80 198
60 120
304 304
83 83
10 10
60
30 30
3 3
4
1 4
1 2
2
1 1
5 5
13 13
168
2 4
2 4
2 7
2 7
2 7
2 7
2 7
2 7
30 30
1 1
190 190
12 12
106
1 1
25 25
3 30
2 10
4 18
1 6
1 4
2 8
Miscellaneous Daily Deputed
Shuttering Work Steel work Fabrication Work Painting Work
Work Manpower
117 117 2
2
14 14 1
2
2
5 5 1
12
4
1
1
2 4 1
4 4 2
2 1
2
5
107 107 2
2
14 14 2
13 13 2
2
10
2
8
2
13 6
2
2
120 72
33
4 6
4 4
2 2
4 3
18
8
5
4
15
4
10
3
4
6
3
8
3
12
3
1
8 4
1
1
1
2
2
1
5
2
2
10 8 6 8
2
10 3 1 3 10
10
20 20
200 100 20
24 24
30
50
6 6
93 93
4 4
80 80
219 219
6
5
2
145 145
3
4
4
1 1
23 23
13 13
3 3
43 43
10 10
800 800
306 306
24 24
17 17
1
1
2
2
2 3 1
2 2
4 4 2
2
300 300 10
12 12 3
72 72 6
10
1
1
1
0
1
1
1
1
2
1
2
1
2
1
1
1
2
2
Daily Deputed
Working DOS DOF
Manpower
Days
Unskill
ed
10-May 5-Oct
8-May 2-Oct
10-May 5-Oct
9-May 4-Oct
We need We need
10-May 5-Oct
between the between the
11-May start date and
6-Oct start date and
11-May the final date
6-Oct the final date
-MOHD -MOHD
9-May 4-Oct
SIKANDER SIKANDER
2 59 11-May 6-Oct
7-May 2-Oct
9-May 3-Oct
11-May 6-Oct
5-May 3-Oct
5-May 3-Oct
After the work is After the work is
10-May 5-Oct
completed. completed.
According to GM According to GM
Sir, Sir,
11-May 6-Oct
We will start We will start
12-May 7-Oct
removing removing
polyethylene. polyethylene.
-MOHD -MOHD
1 149 11-May 26-Oct
SIKANDER SIKANDER
1 156 12-May 13-Oct
16-May 6-Oct
15-May 5-Oct
11-May 1-Oct
15-May 5-Oct
16-May 6-Oct
16-May 6-Oct
16-May 6-Oct
16-May 6-Oct
16-May 6-Oct
15-May 5-Oct
16-May 6-Oct
15-May 5-Oct
15-May 5-Oct
15-May 5-Oct
15-May 5-Oct
15-May 5-Oct
16-May 6-Oct
16-May 6-Oct
16-May 6-Oct
16-May 6-Oct
16-May 6-Oct
16-May 6-Oct
4 26 14-May 8-Jun
13-May 7-Jun
13-May 7-Jun
7-May 1-Jun
13-May 7-Jun
We need We need
14-May 8-Jun
between the between the
14-May 8-Jun
start date and start date and
14-May the final date
8-Jun the final date.
-MOHD -MOHD
SIKANDER SIKANDER
We need We need
between the between the
start date and start date and
the final date the final date.
-MOHD -MOHD
13-May 7-Jun
SIKANDER SIKANDER
1 5 14-May 8-Jun
12-May 6-Jun
2 2 13-May 7-Jun
12-May 6-Jun
13-May 7-Jun
14-May 8-Jun
14-May 8-Jun
14-May 8-Jun
14-May 8-Jun
21-May 15-Jun
14-May 8-Jun
12-May 6-Jun
13-May 7-Jun
Material not Material not
1 26 14-May 8-Jun
available. available.
1 34 15-May 22-May -MOHD -MOHD
SIKANDER SIKANDER
10-May 23-Oct
10-May 23-Oct
9-May 22-Oct
11-May 24-Oct
10-May 23-Oct
8-May 21-Oct
10-May 23-Oct
10-May 23-Oct
11-May 24-Oct
11-May 24-Oct
11-May 24-Oct
8-May 21-Oct
8-May 21-Oct
8 44 9-May 22-Oct
1 44 10-May 29-Oct
11-May 24-Oct
11-May 24-Oct
11-May 24-Oct
10-May 23-Oct
11-May 24-Oct
11-May 24-Oct
11-May 24-Oct
11-May 24-Oct
11-May 24-Oct
11-May 24-Oct
6 166
1 166 11-May 24-Oct
1 173 12-May 1-Nov
9-Jul 11-Jul
15-Jun 17-Jun
15-Jun 17-Jun
17-Jun 19-Jun
1 2 18-Jun 20-Jun
6-Jul 8-Jul
6-Jul 8-Jul
9-Jul 11-Jul
9-Jul 11-Jul
4-Jul 6-Jul
1 2 22-Jun 24-Jun
2 2 26-Jun 28-Jun
21-Jun 23-Jun
24-Jun 26-Jun
27-Jun 29-Jun
4-Jul 6-Jul
2 2 5-Jul 7-Jul
6-Jul 8-Jul
9-Jul 11-Jul
9-Jul 11-Jul
9-Jul 11-Jul
9-Jul 11-Jul
6 2 9-Jul 11-Jul
9-Jul 11-Jul
1 2 12-Jul 14-Jul
12-Jul 14-Jul
13-Jul 15-Jul
1 7 12-Jul 19-Jul
19-Aug 11-Sep
18-Aug 10-Sep
17-Aug 9-Sep
17-Aug 9-Sep
17-Aug 9-Sep
18-Aug 10-Sep
19-Aug 11-Sep
19-Aug 11-Sep
18-Aug 10-Sep
16-Aug 8-Sep
16-Aug 8-Sep
17-Aug 8-Sep
19-Aug 11-Sep
17-Aug 9-Sep
17-Aug 9-Sep
18-Aug 10-Sep
19-Aug 11-Sep
20-Aug 12-Sep
20-Aug 12-Sep
20-Aug 12-Sep
20-Aug 18-Sep
2 24 24-Aug 16-Sep
22-Aug 14-Sep
22-Aug 14-Sep
23-Aug 15-Sep
24-Aug 16-Sep
24-Aug 16-Sep
24-Aug 16-Sep
22-Aug 14-Sep
22-Aug 14-Sep
22-Aug 14-Sep
24-Aug 16-Sep
24-Aug 16-Sep
24-Aug 16-Sep
25-Aug 17-Sep
25-Aug 17-Sep
25-Aug 17-Sep
25-Aug 17-Sep
25-Aug 17-Sep
25-Aug 17-Sep
After clearance
25-Aug 17-Sep
of Civil and
25-Aug service work
17-Sep Material not
-MOHD
1 24 24-Aug 16-Sep available.
SIKANDER
1 31 25-Aug 24-Sep -MOHD
Material not
SIKANDER
available.
-MOHD
10 90 29-May-2020 27-Aug-2020
SIKANDER
27-May-2020 25-Aug-2020
24-May-2020 22-Aug-2020
28-May-2020 26-Aug-2020
27-May-2020 25-Aug-2020
We need We need
28-May-2020 26-Aug-2020
between the between the
29-May-2020 27-Aug-2020
start date and start date and
We final
the needdate. We final
the needdate.
29-May-2020 27-Aug-2020
between the between the
-MOHD -MOHD
26-May-2020 24-Aug-2020
start date and
SIKANDER start date and
SIKANDER
2 53 29-May-2020 the final date.
27-Aug-2020 the final date.
-MOHD -MOHD
SIKANDER SIKANDER
2 5 29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
27-May-2020 25-Aug-2020
27-May-2020 25-Aug-2020
28-May-2020 26-Aug-2020
29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
29-May-2020 27-Aug-2020
1 90 29-May-2020 27-Aug-2020
1 97 30-May-2020 4-Sep-2020
We need We need
5-Jun-2020 4-Sep-2020
between the between the
6-Jun-2020 start date and
5-Sep-2020 start date and
5-Jun-2020 the final date.
5-Sep-2020 the final date.
-MOHD
We need -MOHD
8-Jun-2020 6-Sep-2020
SIKANDER
between the SIKANDER
2 6 11-Jun-2020 start date and
9-Sep-2020
2 7 10-Jun-2020 the final date.
8-Sep-2020
-MOHD
10-Jun-2020 8-Sep-2020
SIKANDER
We need We need
2 6 13-Jun-2020 11-Sep-2020
between the between the
21-Jun-2020 19-Sep-2020
start date and start date and
22-Jun-2020 the final date.
20-Sep-2020 the final date.
-MOHD -MOHD
23-Jun-2020 21-Sep-2020
SIKANDER SIKANDER
After guinting
6 5 23-Jun-2020 21-Sep-2020 work
-MOHD
SIKANDER
4 86 2-Jun 26-Aug
26-May 19-Aug
26-May 19-Aug
26-May 19-Aug
31-May 24-Aug
31-May 25-Aug
1-Jun 26-Aug
2-Jun 26-Aug
2-Jun 26-Aug
26-May 21-Aug
29-May 24-Aug
31-May 26-Aug
2 14 31-May 19-Aug
2-Jun 26-Aug
31-May 24-Aug
31-May 24-Aug
3-Jun 25-Aug
1-Jun 25-Aug
1-Jun 25-Aug
2-Jun 26-Aug
29-Aug 1-Sep
2-Sep 3-Sep
After tensile
1 86 23-Jun-2020 work
16-Sep-2020
1 93 24-Jun-2020 -MOHD
24-Sep-2020
SIKANDER
15 77 24-Aug 9-Nov
22-Aug 7-Nov
22-Aug 7-Nov
22-Aug 7-Nov
24-Aug 9-Nov
17-Aug 2-Nov
22-Aug 7-Nov
23-Aug 8-Nov
24-Aug 9-Nov
24-Aug 9-Nov
24-Aug 9-Nov
24-Aug 9-Nov
14-Aug 30-Oct
14-Aug 24-Aug
5 8 15-Aug 25-Aug
5 5 26-Aug 31-Aug
27-Aug 7-Sep
23-Aug 8-Nov
23-Aug 8-Nov
24-Aug 9-Nov
24-Aug 9-Nov
24-Aug 9-Nov
24-Aug 9-Nov
24-Aug 9-Nov
1 77 24-Aug 9-Nov
1 84 25-Aug 17-Nov
8 52 10-Nov 1-Jan
10-Nov 15-Nov
15-Nov 20-Nov
20-Nov 25-Nov
25-Nov 30-Nov
30-Nov 5-Dec
5-Dec 10-Dec
9-Dec 14-Dec
13-Dec 18-Dec
18-Dec 23-Dec
22-Dec 27-Dec
27-Dec 1-Jan
4 16 11-May 27-May
9-May 26-May
9-May 26-May
10-May 26-May
10-May 26-May
8-May 26-May
10-May 26-May
10-May 26-May
11-May 27-May
11-May 27-May
11-May 27-May
9-May 24-May
9-May 24-May
8-May 23-May
9-May 24-May
10-May 31-May
11-May 27-May
11-May 27-May
11-May 27-May
11-May 27-May
11-May 27-May
11-May 27-May
11-May 27-May
1 16 11-May 27-May
1 23 12-May 4-Jun
60 6-May 5-Jul
2 7 4-May 11-May
2 7 4-May 11-May
4 16 4-May 20-May
16 6-May 22-May
16 6-May 22-May
16 6-May 22-May
28 6-May 3-Jun
14 21-May 4-Jun
3 10 9-May 19-May
28 10-May 7-Jun
30 11-May 10-Jun
48 12-May 29-Jun
50 16-May 5-Jul
50 5-May 24-Jun
16 60 6-May 5-JulAll programe and
date sechedule
60 6-May 5-Julare applicable
15 15-Jun 30-Jun
from recive of
17 15-Jun 2-Julgfc drawing may
be change.
16 19-Jun 5-Jul -Narendra
45 11-May Singh
25-Jun
7 4-May 11-May
5 4-May 9-May
3 4-May 7-May
15 4-May 19-May
15 19-May 3-Jun
15 19-May 3-Jun
15 19-May 3-Jun
10 19-May 29-May
3 29-May 1-Jun
4 30-May 3-Jun
2 2-Jun 4-Jun
15 3-Jun 18-Jun
15 3-Jun 18-Jun
16 4-Jun 20-Jun
4 30-May 3-Jun
12 2-Jun 14-Jun
15 4-Jun 19-Jun
15 4-Jun 8 day has been
19-Jun
taken for shop
8 12-Jun 20-Jun
paya layout.
9 12-Jun 21-Jun -Narendra
4 21-Jun Singh
25-Jun
30 12-May 11-Jun
7 6-May 13-May
30 6-May 5-Jun
29 11-May 9-Jun
30 12-May 11-Jun
29 13-May 11-Jun
30 11-May 10-Jun
4 15 3-Jun 18-Jun
work will be start
15 2-Jun 17-Jun
after complete of
12 4-Jun 16-Jun
aeracon panel
15 3-Jun fixing.
18-Jun
-Narendra
15 3-Jun 18-Jun
Singh
45 4-May 18-Jun
38 4-May 11-Jun
16 4-May 20-May
10 4-May Fixing will start
14-May
As per disscused after recived of
40 6-May 15-Jun
with vendar he is material.
35 9-May
purchage the 13-Jun -Narendra
39 10-May Singh
material in 3 18-Jun
70 parts
19-May and also
28-Jul
depand on
4 19-May
payment by 23-May
30 compeny side.
19-May 18-Jun
56 20-May 15-Jul
56 20-May 15-Jul
55 21-May 15-Jul
55 22-May 16-Jul
62 12-May 13-Jul
63 13-May 15-Jul
60 17-May 16-Jul
58 19-May 16-Jul
25 11-May 5-Jun
Work will be start
25 12-May 6-Jun
after recived the
69 20-May 28-Jul
gfc detail
69 20-May drawings.dates
28-Jul
my be minner
change .
Work will be start
after recived the
gfc detail
drawings.dates
my be minner
69 20-May 28-Jul
change .
90 19-May 17-Aug
15 4-May 19-May
4 10-May 14-May
2 11-May 13-May
3 12-May 15-May
3 12-May 15-May
3 13-May 16-May
3 13-May 16-May
7 14-May 21-May
7 14-May 21-May
7 15-May 22-May
7 15-May 22-May
7 16-May 23-May
7 16-May 23-May
3 17-May 20-May
7 18-May 25-May
7 19-May 26-May
6 20-May 26-May
7 20-May 27-May
7 20-May 27-May
3 18-May 21-May
4 19-May 23-May
7 20-May 27-May
7 20-May 27-May
60 19-May 18-Jul
60 26-May 25-Jul
60 2-Jun 1-Aug
60 3-Jun 2-Aug
65 4-Jun 8-Aug
7 10-Aug 17-Aug
60 10-Jun 9-Aug
60 11-Jun 10-Aug
60 11-Jun 10-Aug
15 2-Aug 17-Aug
7 10-Aug 17-Aug
16 94 5-May 15-May
5-May 10-May
7-May 10-May
5-May 8-May
5-May 12-May
5-May 9-May
7-May 12-May
8-May 9-May
16-May 20-May
15-May 17-May
16-May 28-May
23-May 25-May
23-May 9-Jun
20-May 9-Jun
5 75 30-May 5-Jun
5-May 20-May
5-May 5-May
6-Jun 9-Jun
2-Jun 8-Jun
5-May 30-May
9-Jun 15-Jun
10-Jun 17-Jun
20-Jun 5-Jul
25-Jun 25-Jul
6 40 10-May 17-May
15-May 17-May
5-May 17-May
16-May 25-May
16-May 25-May
18-May 20-Jun
18-May 20-Jun
19-May 20-Jun
20-May 20-May
20-May 20-May
25-May 20-Jun
30-May 24-Jun
1 40 15-May 20-May
5-May 10-May
5-May 8-May
21-May 23-May
21-May 23-May
22-May 28-May
22-May 29-May
28-May 29-May
25-May 30-May
29-May 5-Jun
28-May 5-Jun
30-May 17-Jun
15 54 8-May 1-Jul
7-May 10-May
5-May 5-May
7-May 16-May
10-May 28-May
6-May 15-May
10-May 28-May
10-May 29-May
12-May 6-Jun
4-Jun 10-Jun
5-Jun 10-Jun
8-Jun 15-Jun
10-Jun 17-Jun
10-Jun 20-Jun
20-May 22-Jun
25-May 25-Jun
20-May 30-Jun
30-May 5-Jul
5 22 12-Jun 15-Jun
10-Jun 20-Jun
10-Jun 12-Jun
21-Jun 23-Jun
22-Jun 3-Jul
2-Jul 7-Jul
4-Jul 5-Jul
7-Jul 8-Jul
10-Jul 12-Jul
11-Jul 13-Jul
13-Jul 18-Jul
20-Jun 19-Jul
3 10 15-Jul 20-Jul
1-Jul 10-Jul
15-Jul 30-Jul
18-Jul 10-Aug
20-Jul 8-Aug
5 25 7-May 10-Jul
5-May 10-May
9-May 13-May
4 5 9-May 13-May
15-May 17-May
17-May 18-May
18-May 20-May
22-May 28-May
27-May 6-Jun
6-Jun 12-Jun
25-May 7-Jun
28-May 6-Jun
7-Jun 16-Jun
9-Jun 19-Jun
20-Jun 30-Jun
30-Jun 4-Jul
5-Jul 7-Jul
8 30 8-May 15-May
6-May 7-May
7-May 10-May
10-May 25-May
12-May 23-May
12-May 23-May
15-May 30-May
16-May 2-Jun
3 8 6-May 22-May
6-May 7-May
6-May 6-May
3 7-May 10-May
8-May 12-May
6-May 7-May
10-May 16-May
11-May 17-May
12-May 18-May
9-May 21-May
9-May 21-May
10-May 22-May
2 5 5-May 6-May
6-May 6-May
5-May 6-May
5-May 6-May
7-May 14-May
7-May 15-May
30 20-Jun 28-Jun
30-Jun 5-Jul
29-Jun 5-Jul
3-Jul 5-Jul
4-Jul 7-Jul
4-Jul 7-Jul
5-Jul 6-Jul
7-Jul 7-Jul
8-Jul 9-Jul
9-Jul 10-Jul
9-Jul 11-Jul
10-Jul 13-Jul
13-Jul 14-Jul
16-Jul 25-Jul
20-Jul 28-Jul
28-Jul 5-Aug
2 10 7-May 9-May
5-May 8-May
9-May 9-May
15-May 15-May
10-May 12-May
11-May 14-May
13-May 16-May
15-May 18-May
20-May 21-May
22-May 22-May
23-May 23-May
23-May 23-May
25 5-Jun 30-Jun
60 4-May 3-Jul
1 20 15-May 30-Jun
15-May 30-Jun
20-May 20-Jun
21-May 30-Jun
22-May 5-Jun
21-May 23-Jun
22-May 30-Jun
22-May 5-Jun
28-May 10-Jun
10-Jun 10-Jun
8-Jun 10-Jun
12 80 25-May 27-May
20-May 25-May
1-Jun 7-Jun
30-May 1-Jun
2-Jun 5-Jun
2-Jun 10-Jun
8-Jun 12-Jun
10-Jun 14-Jun
9-Jun 14-Jun
15-Jun 17-Jun
14-Jun 18- Jun
14-Jun 16-Jun
16-Jun 18-Jun
16-Jun 19-Jun
5-Jun 18-Jun
5 28 5-May 2-Jun
1 5-May 5-May
1 5-May 6-May
1 5-May 5-May
2 6-May 8-May
6 7-May 13-May
2 12-May 16-May
4 16-May 20-May
2 21-May 23-May
6 24-May 30-May
2 31-May 2-Jun
15 3-Jun 18-Jun
3 25 5-May 30-May
6 6-May 12-May
15 8-May 23-May
8 19-May 27-May
4 28-May 1-Jun
1 1-Jun 2-Jun
8 3-Jun 11-Jun
8 12-Jun 20-Jun
pvc core fixing
4 21-Jun 25-Jun process is not
final yet. its
working is not
included
-vikas Tyagi
pvc core fixing
process is not
2 26-Jun 28-Jun final yet. its
7 6-May 13-May working is not
included
-vikas Tyagi
4 29 6-May 4-Jun PERFECT WATERPROOFING
1 7-May 8-May
1 9-May 10-May
1 11-May 12-May
1 13-May 14-May
2 15-May 17-May
2 18-May 20-May
2 21-May 23-May
guniting machine
work will be
2 24-May will be shifted
26-May completed within
after the
2 27-May 29-May 15 days when
completion of lift
1 30-May 31-May store material
wall guniting
will be shifted
3 1-Jun work
4-Jun -vikas Tyagi
-vikas Tyagi
5 51 1-June 22-July
1 1-Jun 1-Jun
2 2-Jun 4-Jun
1 5-Jun 5-Jun
4 6-Jun 10-Jun
8 11-Jun 19-Jun
4 20-Jun 24-Jun
4 25-Jun 29-Jun
6 30-Jun 6-Jul
10 7-Jul 17-Jul
4 18-Jul 22-Jul
15 23-Jul 7-Aug
8 5-May 12-May
1 5-May 5-May
1 6-May 6-May
2 6-May 8-May
1 9-May 9-May
0
1 10-May 10-May
0 11-May 11-May
1 11-May 11-May
3 1 12-May 13-May
13-May 13-May
13-May 13-May
1 14-May 14-May
1 15-May 15-May
0 15-May 15-May
1 16-May 16-May
3 1 17-May 17-May
1 17-May 17-May
1 19-May 19-May
1 20-May 20-May
3 1 21-May 22-May
2 23-May 25-May
1 26-May 26-May
1 27-May 27-May
4 27-May 31-May
1 27-May 27-May
1 28-May 28-May
1 28-May 28-May
1 28-May 29-May
1 29-May 29-May
4 1 30-May 31-May
1 1-Jun 1-Jun
1-Jun 1-Jun
2 5 2-Jun 7-Jun
4 10 5-May 15-May
4 4 16-May 20-May
2 1 21-May 22-May
5 1 23-May 24-May
1 1 25-May 26-May
2 1 27-May 28-May
5 2 29-May 31-May
3 2 1-Jun 3-Jun
2 2 4-Jun 6-Jun
10 7 7-Jun 14-Jun
7-Jun 7-Jun
6 3 15-May 18-May
0 8 19-Jun 27-Jun
2 15 7-May 22-May
1 06 May 06 May
5 07 May 11 May
1 12 May 12 May
7 13 May 19 May
2 06 May 08 May
35 06 May 10 June
35 06 May 10 June
35 06 May 12 June
38 06 May 13 June
38 07 May 14 June
38 07 May 14 June
38 07 May 14 June
43 08 May 20 June
7 05/May/2020 12 May 2020
1 05 May 05 May
7 06 May 12 May
23 06 May 28 May
1 06 May 06 May
23 06 May 28 May
23 06 May 30 May
24 06 May 30 May
25 07 May 30 May
25 07 May 30 May
25 07 May 30 May
30 07 May 06 June
27 days 04 May 2020 31 May 2020
1 04 May 04 May
15 05 May 20 May
16 05 May 21 May
1 05 May 05 May
17 06 May 22 May
14 10 May 24 May
13 15 May 28 May
2 29 May 30 May
2 30 May 31 May
40 05 May 2020 15 June
1 05 May 05 May
35 06 May 10 June
3 06 May 8 May
34 07 May 10 June
34 08 May 11 June
34 08 May 11 June
33 09 May 11 June
33 09 May 11 June
36 06 May 11 June
25 20 May 15 June
16 days 15 May 31 May
1 15 May 15 May
1 16 May 16 May
1 17 May 17 May
1 17 May 17 May
1 18 May 18 May
1 18 May 18 May
1 23 May 23 May
7 24 May 30 May
1 4-May 5-May
1 6-May 7-May
2 7-May 9-May
1 10-May 11-May
1 12-May 13-May
4 14-May 18-May
1 20-May 21-May
1 22-May 23-May
5 24-May 29-May
1 30-May 31-May
1 1-Jun 2-Jun
1 3-Jun 4-Jun
2 5-Jun 7-Jun
0 5-Jun 7-Jun
2 8-Jun 10-Jun
0 11-Jun 11-Jun
7 11-Jun 18-Jun
1 19-Jun 20-Jun
8 21-Jun 29-Jun
1 30-Jun 1-Jul
0 30-Jun 30-Jun
2 30-Jun 2-Jul
1 2-Jul 3-Jul
1 4-Jul 5-Jul
2 6-Jul 8-Jul
2 9-Jul 11-Jul
1 12-Jul 13-Jul
8 20-Jul 28-Jul
1 29-Jul 30-Jul
1 29-Jul 30-Jul
1 29-Jul 30-Jul
1 31-Jul 1-Aug
1 31-Jul 1-Aug
2 31-Jul 2-Aug
7 3-Aug 10-Aug
1 01-Jul 02-Jul
1 03-Jul 04-Jul
2 05-Jul 07-Jul
1 08-Jul 09-Jul
1 10-Jul 11-Jul
1 10-Jul 11-Jul
1 10-Jul 11-Jul
1 12-Jul 13-Jul
1 14-Jul 15-Jul
1 16-Jul 17-Jul
7 18-Jul 25-Jul
1 1-Jul 2-Jul
1 3-Jul 4-Jul
1 5-Jul 6-Jul
1 7-Jul 8-Jul
2 9-Jul 11-Jul
1 12-Jul 13-Jul
1 14-Jul 15-Jul
5 16-Jul 21-Jul
2 22-Jul 24-Jul
2 25-Jul 27-Jul
1 28-Jul 29-Jul
1 30-Jul 31-Jul
4 1-Aug 5-Aug
3 6-Aug 9-Aug
1 10-Aug 11-Aug
1 20-Jul 21-Jul
1 22-Jul 23-Jul
1 24-Jul 25-Jul
2 26-Jul 28-Jul
2 29-Jul 31-Jul
1 1-Aug 2-Aug
1 15 July 16 July
1 17 July 18 July
3 19 July 22 July
8 23 July 31 July
3 1 August 4 August
8 5 August 13 August
6 14 August 20 August
10 21 August 31 August
3 1 September 4 September
4 5 September 9 September
8 10 September 18 September
2 19 September 21 September
10 2-Aug 12-Aug
10 2-Aug 12-Aug
7 4-May 11-May
2 12-May 14-May
6 60 15-May 14-Jul
5 60 25-May 24-Jul
2 60 25-May 24-Jul
25-May 24-Jul
25-May 24-Jul
25-May 24-Jul
25-May 24-Jul
25-May 24-Jul
25-May 24-Jul
1 25-Jul 26-Jul
3 27-Jul 30-Jul
10 31-Jul 10-Aug
1 11-Aug 12-Aug
1 13-Aug 14-Aug
8 15-Aug 23-Aug
7 24-Aug 31-Aug
15 2 Aug 17 Aug
15 2 Aug 17 Aug
3 15 15 Jul 1 Aug
15 15 Jul 1 Aug
1 4-May 5-May
1 6-May 7-May
1 8-May 9-May
1 10-May 11-May
3 12-May 14-May
2 16-May 18-May
1 19-May 20-May
1 21-May 22-May
1 23-May 24-May
1 25-May 26-May
1 27-May 28-May
1 29-May 30-May
1 31-May 1-Jun
2 2-Jun 4-Jun
1 5-Jun 6-Jun
1 7-Jun 8-Jun
1 9-Jun 10-Jun
6 12-Jun 18-Jun
1 19-Jun 20-Jun
1 21-Jun 22-Jun
1 23-Jun 24-Jun
1 25-Jun 26-Jun
1 27-Jun 28-Jun
1 29-Jun 30-Jun
1 1-Jul 2-Jul
1 3-Jul 4-Jul
30 5-Jul 4-Aug
4 30 15 Jul 14 Aug
15 15 Aug 30 Aug
8 31 Aug 8 Sep
7 9 Sep 16 Sep
8 5 Aug 13 Aug
1 4-May 5-May
4 30 6-May 5-Jun
1 6-Jun 7-Jun
1 8-Jun 9-Jun
3 10-Jun 13-Jun
2 14-Jun 16-Jun
1 17-Jun 18-Jun
1 19-Jun 20-Jun
1 21-Jun 22-Jun
1 23-Jun 24-Jun
6 25-Jun 1-Jul
2 2-Jul 4-Jul
1 5-Jul 6-Jul
6 7-Jul 13-Jul
2 14-Jul 16-Jul
1 17-Jul 18-Jul
6 19-Jul 25-Jul
4 26-Jul 30-Jul
2 31-Jul 2-Aug
1 3-Aug 4-Aug
1 5-Aug 6-Aug
1 7-Aug 8-Aug
4 9-Aug 13-Aug
0 9-Aug 13-Aug
30 14-Aug 13-Sep
15 14-Sep 29-Sep
5 30-Sep 5-Oct
15 7-May 22-May
47 15-Jul 31-Aug
10 31-Aug 10-Sep
10 15-Aug 25-Aug
1 11July 12July
1 13July 14July
4-May 10-July
4-May 10-July
1 13July 14July
1 15July 16July
1 17July 18July
1 19July 20July
1 21July 22July
2 23July 25July
1 26July 27July
26July 27July
7 28July 4August
4 5August 9August
8 10August 18August
2 19August 21August
1 22August 23-August
1 4-May 5-May
1 6-May 7-May
1 8-May 9-May
1 10-May 11-May
1 12-May 13-May
1 14-May 15-May
2 16-May 18-May
2 19-May 21-May
3 22-May 25-May
2 26-May 28-May
2 29-May 31-May
3 1-Jun 4-Jun
1 1-Jun 2-Jun
2 3-Jun 5-Jun
1 5-Jun 6-Jun
0 7-Jun 7-Jun
0 7-Jun 7-Jun
6 7-Jun 13-Jun
4 14-Jun 18-Jun
0 19-Jun 19-Jun
15 19-Jun 4-Jul
6 5-Jul 11-Jul
6 12-Jul 18-Jul
2 19-Jul 21-Jul
8 22-Jul 30-Jul
1 31-Jul 1-Aug
2 2-Aug 4-Aug
1 20-July 21-July
1 22-July 23-July
2 24-July 26-July
3 27-July 30-July
8 31-July 8-August
2 9-August 11-August
2 12-August 14-August
8 15-August 23-August
2 24-August 26-August
2 27-August 29-August
4 30-August 3-September
4 4-September 8-September
2 9-September 11-September
4 12-September 16-September
0 17-September 17-September
6 17-September 23-September
2 19-September 21-September
7 15 19-May 3-Jun
15 4-Jun 19-Jun
15 15-Jun 30-Jun
1 1
4 10 04 May 14 May 2020
6 1 15 May 2020 15 May 2020
1 1 16 May 2020 16 May 2020
1 5 17 May 2020 22 May 2020
1 23 May 2020 23 May 2020
1 24 May 2020 24 May 2020
2 25 May 2020 26 May 2020
1 27 May 2020 27 May 2020
2 27 May 2020 28 May 2020
1 28 May 2020 28 May 2020
2 29 May 2020 30 May 2020
All type of
Mr Rajeev Singh 7874658967 New Contractor
construction work
Mr Sarfaraz 7820029181 New Contractor
All type of
Mr. Gurupreet Singh 7417977656 New Contractor
construction work
Mr Irshad 9717161431 New Contractor
All type of
Mr Rajeev Singh 7874658967 New Contractor
construction work
Mr Sarfaraz 7820029181 New Contractor
All type of
Mr. Gurupreet Singh 7417977656 New Contractor
construction work
Mr Irshad 9717161431 New Contractor
All type of
Mr Rajeev Singh 7874658967 New Contractor
construction work
Mr Sarfaraz 7820029181 New Contractor
All type of
Mr. Gurupreet Singh 7417977656 New Contractor
construction work
Mr Irshad 9717161431 New Contractor
All type of
Mr Rajeev Singh 7874658967 New Contractor
construction work
Mr Sarfaraz 7820029181 New Contractor
All type of
Mr. Gurupreet Singh 7417977656 New Contractor
construction work
Mr Irshad 9717161431 New Contractor
All type of
Mr Rajeev Singh 7874658967 New Contractor
construction work
Mr Sarfaraz 7820029181 New Contractor
All type of
Mr. Gurupreet Singh 7417977656 New Contractor
construction work
Mr Irshad 9717161431 New Contractor
All type of
Mr Rajeev Singh 7874658967 New Contractor
construction work
All type of
Mr. Gurupreet Singh 7417977656 New Contractor
construction work
All type of
Mr Rajeev Singh 7874658967 New Contractor
construction work
Mr Sarfaraz 7820029181 New Contractor
All type of
Mr. Gurupreet Singh 7417977656 New Contractor
construction work
Mr Irshad 9717161431 New Contractor
All type of
Mr. Gurupreet Singh 7417977656 New Contractor
construction
All type of work
Mr Rajeev Singh 7874658967 New Contractor
construction work
Mr Sarfaraz 7820029181 New Contractor
Mr Harinder 8766386818 New Contractor
All type of
Mr Rajeev Singh 7874658967 New Contractor
construction work
Mr Sarfaraz 7820029181 New Contractor
All type of
Mr. Gurupreet Singh 7417977656 New Contractor
construction work
Mr Irshad 9717161431 New Contractor
PERFECT WATERPROOFING 9152481035
SANTOSH SHARMA 9213930066
pc lokendra 85888933568
pradeep 80764445072 carpenter
Sunil kumar 9891917923
Salman 8920530369 Structure work
Bansal 9810454084 Structure work
Sanjeev Sharma 9410602716 Structure work
RD Construction 7838234393 Structure work
Kailash Tomar construction 9350965841 Structure work
Merveilleux builders and
9716734492 All types of work
developers
Veeru 8447328432 Structure work
Jiyarul 7678673211 Structure work
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander LIFT FACIA
3 Deepak Er.Sikander FOR GRANITE
Deepak Er.Sikander STONE
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
FLOORING
4 Deepak Er.Sikander WITH TOE
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
PLANTER
5 Deepak Er.Sikander CASTING
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
TOILET TILE
6 Deepak Er.Sikander AND STONE
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
EXTERNAL
7 Deepak Er.Sikander PLASTER
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
ITALIAN
8 Deepak Er.Sikander FLOORING
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
9 Deepak Er.Sikander POLISH
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander BASEMENT
10 Deepak Er.Sikander STONE
FLOORING
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander Arium / back
Harishanker
Narendra Singh side facade
febrication
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
5 Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh koi data feed
Harishanker nahi hai
Narendra Singh
Harishanker -SHISHIR
Narendra Singh
Harishanker KUMAR AZAD
Narendra Singh quantity related
Harishanker -SHISHIR
Narendra Singh
Harishanker KUMAR AZAD
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra
pleaseSingh
attach
Harishanker
Narendra
vedio Singh
Harishanker
Narendra-SHISHIR
Singh
Harishanker KUMAR AZAD
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Jitendra singh Narendra Singh
Jitendra singh Narendra Singh
Jitendra singh Narendra Singh
Jitendra singh Narendra Singh
Jitendra singh Narendra Singh
Jitendra singh Narendra Singh
Jitendra singh Narendra Singh
Jitendra singh Narendra Singh
Jitendra singh Narendra Singh
Jitendra singh Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
6 Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
Harishanker
Narendra Singh
7 Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
8 Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Harishanker Narendra Singh
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
attach vedio link attach vedio link
Yogendra Er.Yusuf-SHISHIR
Khan -SHISHIR
Yogendra Er.Yusuf
KUMAR Khan
AZAD KUMAR AZAD
Yogendra Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Gulab Singh Er.Yusuf Khan
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Er.Yusuf Khan Narendra Singh
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
Yogendra Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
gulab singh Er.Yusuf Khan
yogender yusuf
yogender yusuf
yogender yusuf
yogender yusuf
yogender yusuf
yogender yusuf
yogender yusuf
yogender yusuf
shivkumar C.E.narender
Deliveries of kiosks
Installation of kiosks
Completion of flooring '
Completion of plumbing works
Completion of electrical works
Completion of HVAC
Fixtures fittings
Handover
Toy Tran
cricket simulator
Robot football
Drawings
Foundations
Installation
Testing
Commisioning
Handing over
Final handover
Base frame structure 16 MT
Fixing of FRP jaali ( Single side) 140 SQM
Fixing of LED modules 87.77 SQM
Fixing of flex 422 SQM
Daily routine
-MOHD
SIKANDER
Clearance of
services work
-MOHD
SIKANDER
Mr Rajeev All type of
7874658967 New Contractor
Singh construction work
Mr Sarfaraz 7820029181 New Contractor
Mr. Gurupreet All type of
7417977656 New Contractor
Singh construction work
Mr Irshad 9717161431 New Contractor
Clearance of
services work
-MOHD
SIKANDER
Mr Rajeev All type of
7874658967 New Contractor
Singh construction work
Mr Sarfaraz 7820029181 New Contractor
Mr. Gurupreet All type of
7417977656 New Contractor
Singh construction work
Mr Irshad 9717161431 New Contractor
Mr Rajeev All type of
7874658967 New Contractor
Singh construction work
Mr Sarfaraz 7820029181 New Contractor
Mr. Gurupreet All type of
7417977656 New Contractor
Singh construction work
Mr Irshad 9717161431 New Contractor
Clearance of
services work
-MOHD
SIKANDER
Mr Rajeev All type of
7874658967 New Contractor
Singh construction work
Mr Sarfaraz 7820029181 New Contractor
Mr. Gurupreet All type of
7417977656 New Contractor
Singh construction work
Mr Irshad 9717161431 New Contractor
After Guniting
work will start
-MOHD
SIKANDER
Mr Rajeev All type of
7874658967 New Contractor
Singh
Mr. Gurupreet construction
All type of work
7417977656 New Contractor
Singh construction work
Mr Rajeev All type of
7874658967 New Contractor
Singh construction work
Mr Sarfaraz 7820029181 New Contractor
Mr. Gurupreet All type of
7417977656 New Contractor
Singh construction work
Mr Irshad 9717161431 New Contractor
RD
7838234393 Fabrication work
Construction
Kailash Tomar
Merveilleux 9350965841 fabrication work
construction
builders &
Enlightenment 9716734492 fabrication
fabrication work
work ,
Developers
interiors Pvt 9582025408 HPL cladding , ,
fabrication work
Eon
Ltd interior facade finishing
8048117085 HPL cladding
fabrication , ,
work
products
Amit buildwell 8860260177 facade finishing
HPL cladding ,
Ashi facade 9540015000 facade finishing
Fabrication work
Aas
9015879098 Fabrication work
Mohammed
Shiva Kant 9718779092 Fabrication work
Mukesh
Kumar
9999610363 Trimix Flooring
Soni Yadav
Engineering
9310448026 Trimix Flooring
RD
Construction
7838234393 Painting Work
Kailash Tomar
Merveilleux
construction
9350965841 Painting Work
builders &
Merveilleux 9716734492 Painting Work
Developers
builders & 9716734492 Painting Work
Developers
Singh Agency 9305646611 Painting Work
RD
Construction
7838234393 Stone cladding Work
Kailash Tomar
Merveilleux
construction
9350965841 Stone cladding Work
builders & 9716734492 Stone cladding Work
Developers
Singh Agency 9305646611 Stone cladding Work
Vipin Kumar 9305646611 Stone cladding Work
Rashid 8383060953 Stone cladding Work
Soab Ali 8130452370 Stone cladding Work
Akash 8586094117 Stone cladding Work
Mahavir 8860344224 Stone cladding Work
Uday 9958487910 Stone cladding Work
Sonu 9899976778 Stone cladding Work
Adil Ali 9876841304 Stone cladding Work
Imran 9761321751 Stone cladding Work
Shyam Dev 9555523545 Stone cladding Work
Shatrughan 9958874877 Stone cladding Work
RD
Construction
7838234393 Tile fixing work
Kailash Tomar
Merveilleux
construction
9350965841 Tile fixing work
builders & 9716734492 Tile fixing work
Developers
Singh Agency 9305646611 Tile fixing work
Vipin Kumar 9305646611 Tile fixing work
Rashid 8383060953 Tile fixing work
Soab Ali 8130452370 Tile fixing work
Akash 8586094117 Tile fixing work
Mahavir 8860344224 Tile fixing work
Uday 9958487910 Tile fixing work
Sonu 9899976778 Tile fixing work
Adil Ali 9876841304 Tile fixing work
Imran 9761321751 Tile fixing work
Shyam Dev 9555523545 Tile fixing work
Shatrughan 9958874877 Tile fixing work
Hattu ram 9152946767 Drive Way
RK
construction
9152791024 Drive Way
Uday
construction
9152415396 Drive Way
HSR infra 9811213021 Drive Way
Eon interior
8048117085 Water proof
products
Vipin Kumar 9305646611 Water proof
Ajay Gaur 9211561401 Water proof
HK Verma 9990359492 Water proof
Manjar Alam 9891729615 Water proof
Prem Jha 9958034411 Water proof
Pawan 7678524171 Water proof
Ashi facade 9540015000 Fabrication work
Aas
9015879098 Fabrication work
Mohammed
Shiva Kant 9718779092 Fabrication work
RD
7838234393 Fabrication work
Construction
Kailash Tomar
Merveilleux 9350965841 fabrication work
construction
builders &
Enlightenment 9716734492 fabrication
fabrication work
work ,
Developers
interiors Pvt 9582025408 HPL cladding , ,
fabrication work
Eon
Ltd interior facade finishing
8048117085 HPL cladding
fabrication , ,
work
products
Amit buildwell 8860260177 facade finishing
HPL cladding ,
facade finishing
TOTAL MANPOWER
S.NO. WORK UNIT QTY
MASON LABOUR
1 SHOP'S FACIA SQM 1935 1190 2380
2 ITALIAN LIFT FACIA SQM 223 137 274
3 GRANITE LIFT
PASSAGE FACIA
FLOORING SQM 84 52 103
4 WITH TOE WALL SQM 9274 1996 2994
5 STONE
PLANTER SQM 77 47 47
TOILET TILE AND
6 SQM 1760 451 902
STONE
7 EXTERNAL PLASTER SQM 1277.5 172 344
8 ITALIAN FLOORING SQM 1800 775 1162
9 POLISH SQM 2300 413 413
BASEMENT STONE
10 SQM 120 32 65
FLOORING
TOTAL
Rate
Amount
Total Amount
DAILY DEPLOYED WORKING
DOS DOF
MASON LABOUR DAYS
8 16 149 11May 6October
2 4 69 27 June 2020 03 September 2020
2 4 26 14-May 8-Jun
12 18 166 11-May 24-Oct
2 2 24 24-Aug 16-Sep
5 10 90 29-May-2020 27-Aug-2020
2 4 86 2-Jun 26-Aug
10 15 77 24-Aug 9-Nov
8 8 52 10-Nov 1-Jan
2 4 16 11-May 27-May
53 85
510 310
27030 26350
53380 Per Day
BALANCE ACTIVITY LIST OF MEP AT DELHI 6 PROJECT.
S.No. Task Name Main Activity
1
Cealing Conduiting at 4th floor
2
3
Ceiling Wiring at 4th floor
4
5
6
7
8 DB Dressing at all floor
9
10
11
12
Submain Wiring & Connection .
13
14
15
16
Electrical Work
17 Fixing of Cooridor light fixtures
(Internal)
18
19
20
21
22
Toilet Ceiling conduiting and wiring
23
24
25
26
Fixing of Toilet Ceiling & Wall light
27
fixtures
28
29
30 Electrical Cable tray erection at 4th
31 floor
32
LV Cable tray erection at 4th floor
33
30
31 fixing of outdoor pole box
32
33
34
Making of Maintenance Earth Pit
35
36
37
Laying of HT Cable
38
39
40
41 Laying of LT Cable
42
43
44
45
46
DB fixing in all shops
47
48
49
50
51 Electrical Work
Installation of Transformers (PSS),
52 (External/High Side)
53
54
55
Installation of DG Sets
56
57
58
Installation of Main LT panel
59
60
Installation APFC Panel
61
62 Installation of Common Lighting
63 Panel
64
Installation of Elevator Panel
65
66
Installation of Escalator Panel
67
68
Installation of Meter Boards
69
70
71
LT Cable Termination
72
73
74
75
76
77 Cabling of CCTV System at all Floor
78
79
80
82
83
84
85 Fixing of CCTV cameras at all floor
86
87
88
89
90
91 Fire Detection system Internal
92 cabling
93
94
95
96 Low Voltage Work
97
Fixing of Detectors.
98
99
100
101
102
103
104
Fixing of MCP, Hooter, etc.
105
106
107
108
Fixing of Fire Panel
109
110
111
112
fixing of ceiling speakers at all floors
113
114
fixing of ceiling speakers at all floors
115
116 Fixing of PA System and Amplifier
117 system for speakers.
118
Erection of GI Header Pipe for
119
Domestic Line
120
121 Erection of GI Header Pipe for
122 Flushing Line
123 Erection of uPVC sch-80 Pipe for
124 soft water Line (for cooling tower)
Plumbing Work
125 Fixing of Valves in water supply line
(Basement)
126 for Lgf Shops
127 Fixing of Water meter in water
128 supply line for Lgf Shops
129 LGF shops Water supply line
130 connection with downcommer line .
131 Installation of sump Pumps in
132 basement
133
134 Toilet Internal CPVC Piping
135 (Domestic) for B & C type Toilet
136
137
138 Toilet Internal CPVC Piping
139 (Flushing) for B & C type Toilet
140
141
142 Toilet Internal UPVC Pipe laying
143 and Hounching for B & C type Toilet
144
145
146
Fixing of PVC Cistern of WC for B &
147
C type Toilet
148
149
150
151 Fixing of Urinal sensor inside the
152 toilet for B & C type Toilet
153
154
155 Testing of Cpvc line from Over
156 Head Tank
157
158 Shaft Riser and Rain Water Riser
159 Pipe Erection
160
161
162 GI Riser feeding Overhead Tank
163
164
165 Plumbing Work
(Internal) Terrace Ring Line Piping and Shaft
166
Pipe Connection
167
168
169
Conection of Terrace ring line with
170
OHT tanks.
171
172
173
174
Wtaer Supply line (Down Commer)
175
coneection with Toilets internal pipe
176
177
178
179
180
Fixing of WC in all toilets
181
182
183
184
185
186 Fixing of Wash Basin in all toilets
187
188
189
190
Fixing of Urinal with sensors in all
191
toilets
192
193
194
CP Fixture Fitting
195
196 CP Fixture Fitting
197
198
199
200
201
202 Laying of Pipe line for Garden
203 Hydrants
204
205
206 Borewell Connection to UGT
207
208
209 Fixing of garden Hydrent
210
211
212
213
214
215
PUMP ROOM Installation of Water Treatment
216
Installation (WTP) Plant (WTP)
217
218
219
220
221
222
Painting of equipments as per code
223
STP
224 Testing and Commissioning of STP
Installation of GI Duct for STP
225
Exhaust
226 Operations,Dependent/indoor/Powd
227 er coated ,Pebble Grey Color ,2.0
Mechanical Car
228 T . Safety-Electromagnetic
Parking System
229 Locks,Lockers from Top to Bottom
at every 100mm to ensure
230
231 Third floor sprinkler work
Third floor sprinkler work
232
233
234
Third floor hydrant work
235
236
237
238
Fourth floor sprinkler work
239
240
241
242
Fourth floor hydrant work
243
244
245
Fire-fighting
246
247 Basement Balance work
248
249
250
251
External Hydrant
252
253
254
255
256 FHC Work all Floors
257
258
259
Second floor
260
261 First Floor
262
263 Basment balance work
264
265 First Floor Balance Work
266
267
Second Floor Balance Work
268
269
270
271
ThirdFloor Balance Work
HVAC Work
ThirdFloor Balance Work
272
273
274 HVAC Work
275
Fourth Floor Balance Work
276
277
278
279 Pipe installation in Vertical shaft
280
281
Cooling tower erection
282
283
Pump installation
284
Additional Units for third floor open
285
area
286 Pump panel
287
Bore in earth
288
Rain water Harvesting
289
Pit execution
290
291
Passenger lift
292
293
Lifts Central Lifts
294
295
Glass lift
296
297
298
Part-1
299
300
301
302
303 Escalators
304 Part-2
305
306
307
308
Central Part (to UGF Bridge)
309
310
Travellator Basement
311
312
313
314
315
316
317 Axial Flow fans
318
319
320
321
322
Ventilation system
323 Jet Fans
324
325
326 Centrifugal in line fans
327
328
329
330 Duct
331
332
Panels
333
334
335
sewer work
336
Sewer and Rain water
337
Pipe work
338
339 Storm Work
340
341
Solar Panels Roof Top Solar Installation
342
RWH pit-3 1 no
RWH pit-4 1 no
RWH pit-3 1no
RWH pit-4 1 no
100 mtr
Near B type toilet
Near B type toilet
150 mtr
4-May-2020
Days
2 3 Days 24-May-2020 27-May-2020
2 3 Days 28-May-2020 31-May-2020
2 5 Days 1-Jun-2020 6-Jun-2020
2 4 Days 7-Jun-2020 11-Jun-2020
2 3 Days 12-Jun-2020 15-Jun-2020
2 2 Days 16-Jun-2020 18-Jun-2020
3 12 Days 19-Jun-2020 1-Jul-2020
2 7 Days 14-May-2020 21-May-2020
2 7 Days 22-May-2020 29-May-2020
2 7 Days 30-May-2020 6-Jun-2020
2 5 Days 7-Jun-2020 12-Jun-2020
2 2 Days 2-Jul-2020 4-Jul-2020
2 2 Days 5-Jul-2020 7-Jul-2020
2 2 Days 8-Jul-2020 10-Jul-2020
2 2 Days 11-Jul-2020 13-Jul-2020
Days
t-1
t-1
t-1
s-2
s-2
sb-1
p-1
sb-1
t-1
ts-1
sb-1
p-1
t-1
ts-1
sb-1
p-1
t-2
ts-1
sb-1
p-1
t-3
t-3
t-3
t-1
t-1
t-1
t-2
t-1
team-1
team-1
team-2
team-2
team-1
team-2
team-3
team-4
team-5
team-6
team-1
team-2
team-3
team-4
team-1
team-2
team-3
team-4
team-1
team-2
team-3
team-4
team-1
team-1
team-1
team-1
team-2
team-3
team-4
team-1
team-2
team-3
team-4
team-1
team-2
team-3
team-4
team-1
team-2
team-3
team-4
team spare
team-1
team-2
team-3
team-1
team-1
team-1
team-1
team-1
team-1
team-2
team-2
team-2
team-1
team-2
team- 1 and 2
team 1
work will be started
team-1 work will be started
S.No. supervisor Assign to / Task Name
Problem Solver
1 SHOP'S FACIA
2
3 Deepak Er.Sikander
4 Deepak Er.Sikander
5 Deepak Er.Sikander
6 Deepak Er.Sikander
9 Deepak Er.Sikander
10 Deepak Er.Sikander
11 Deepak Er.Sikander
12 Deepak Er.Sikander
13 Deepak Er.Sikander
14 Deepak Er.Sikander
15 Deepak Er.Sikander
16 Deepak Er.Sikander
17 Deepak Er.Sikander
18 Deepak Er.Sikander
19 Deepak Er.Sikander
20 Deepak Er.Sikander
21 Deepak Er.Sikander
22 Deepak Er.Sikander
23 Deepak Er.Sikander
24 Deepak Er.Sikander
25 Deepak Er.Sikander
Deepak Er.Sikander
1 Deepak Er.Sikander
2 Deepak Er.Sikander
3 Deepak Er.Sikander
4 Deepak Er.Sikander
5 Deepak Er.Sikander
6 Deepak Er.Sikander
7 Deepak Er.Sikander
8 Deepak Er.Sikander
Deepak Er.Sikander
1 Deepak Er.Sikander
2 Deepak Er.Sikander
3 Deepak Er.Sikander
4 Deepak Er.Sikander
Deepak Er.Sikander
1 Deepak Er.Sikander
2 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
1 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander LIFT FACIA FOR
2 Deepak Er.Sikander ITALIAN STONE
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
3 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
4 Deepak Er.Sikander
Deepak Er.Sikander
5 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
6 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
7 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
8 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
1 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander LIFT FACIA FOR
Deepak Er.Sikander GRANITE STONE
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak
https://youtu.be/m-UVBkk6eKk Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
2 Deepak Er.Sikander
Deepak Er.Sikander PASSAGE FLOORING
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander PLANTER CASTING
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
3 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak
https://youtu.be/Qe8YH1Pg4Mw Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander TOILET TILE AND
Deepak Er.Sikander STONE
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander EXTERNAL PLASTER
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
4 Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander ITALIAN FLOORING
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander POLISH
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander Basement Lobby Stone
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Deepak Er.Sikander
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender Staircase painting
Harishanker C. E. Narender External texture paint
Harishanker C. E. Narender Enamel paint on MS works
Fixing of cement board
Harishanker C. E. Narender under railing is missing
Harishanker C. E. Narender
Harishanker C. E. Narender
5 Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
6 Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
7 Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
8 Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Harishanker C. E. Narender
Er.Yusuf Khan C. E. Narender
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan Balance internal aeracon pannel
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
1 Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er.Yusuf Khan
Er Vikas Tyagi
-
Er. Jitendra Singh
Tarvelators Installation
support
Amit Singh/Girdhar
Verma
Amit Singh
Shiv Kumar
yogender yusuf
shivkumar shishir azad
1935
Plaster for cladding the store if the material is not available in stock,
indent and shift the material to the workplace) 1935
Monpower Arragement
Reference line for bunda
Sand Screering for plaster
Sand Shifting
Cement shifting
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 1935
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing
Mortar mixing
Bunda Laying
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Plaster 1935
Scaffolding and Chali removing 1935
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
Stone Cladding the store if the material is not available in stock, 1935
indent and shift the material to the workplace)
Monpower Arragement
Stone cutting as per req.
V Groove and polish work 1935
Stone Shifting
Chemical Shifting
Primer Shifting
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 1935
Clean both the surfaces properly.
Remove all the loose particles.
Apply primer first Coat.
Wait for 30 minutes
Apply primer second coat.
Allow
Make itthe
drying
pasteforof12 hours. Ardex Endura Ardiflex
chemical
Endura
Apply theaccordingly usingthe
paste on both water.
surfaces (column and
Stone)
Make the use of " travel tool " which make the layers
on the surface
Paste/Fix the stone on the surface 1935
Checking of stone cladding
Hole cutting As per required
Grouting 1935
Scaffolding and Chali removing and shifting 1935
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
223
Plaster for cladding the store if the material is not available in stock,
indent and shift the material to the workplace)
Monpower Arragement
Reference line for bunda
Sand Screering for plaster
Sand Shifting
Cement shifting
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 223
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing 223
Mortar mixing
Bunda Laying 223
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Plaster 223
Scaffolding and Chali removing 223
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
Stone Cladding the store if the material is not available in stock, 223
indent and shift the material to the workplace)
Monpower Arragement
Stone cutting as per req. 223
V Groove and polish work 223
Stone Shifting 223
Chemical Shifting
Primer Shifting
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing
Clean both the surfaces properly.
Remove all the loose particles.
Apply primer first Coat.
Wait for 30 minutes
Apply primer second coat.
Allow
Make itthe
drying
pasteforof12 hours. Ardex Endura Ardiflex
chemical
Endura
Apply theaccordingly usingthe
paste on both water.
surfaces (column and
Stone)
Make the use of " travel tool " which make the layers
on the surface
Paste/Fix the stone on the surface 223
Checking of stone cladding
Hole cutting As per required 223
Grouting 223
Scaffolding and Chali removing and shifting 223
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
84
Clearance of services work
Ref line and
the store level
if the material is not available in stock,
indent and shift the material to the workplace)
Monpower Arragement
Sand Shifting
Cement shifting
POP Shifting
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 84
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing 84
Stone cutting as per req.
V Groove and polish work 84
Stone Shifting 84
Stote cladding from POP 84
Measuring Box shifting
Mortar mixing
Mortar grouting
Stone pop removing
Checking of stone cladding
Hole cutting As per required 84
Grouting 84
Scaffolding and Chali removing and shifting 84
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
9274
Clearance of services and waterproofing work
Area Cleaning
Surface deep cleaning
Ref level marking
Reference
the store if layout marking
the material is not available in stock,
indent and shift the material to the workplace)
Monpower Arragement
Stone cutting with polish as per req.
Sand Shifting
Cement shifting
Stone Shifting 9274
Measuring Box shifting
Water in the workplace
LVL mark for PCC if required
Checking of level
PCC 9274
Curing
LVL mark for flooring
Checking of level
Mortar mixing
curing before plaster
Plaster for flooring 9274
Wet the tile 9274
Tile spacers arrangement
Cement slurry for tile pasting
Tile laying 9274
Checking of flooring
Hole cutting As per required
Grouting 9274
Cleaning
Curing 7 days minimum
Light Connection for Working
Clearance of services and waterproofing work
Area Cleaning
Surface deep cleaning
Ref level marking
Reference layout marking
Aggregate Shifting
Sand Shifting
Cement shifting
Water in the workplace
Shuttering, nail and binding wire arrangement
Extra bar removing
Rebaring
Steel binding
Shuttering oiling
layout checking
steel BBS making
reinfocement checking
cover block Foam fixing
wall shuttering
Plump and alingment
concrete check list and pour card prepare
Measuring Box shifting
Nitobond laying before casting
Hand mixing of concrete
Casting
Plumb and Alignment checking
Deshuttering
Material shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
Plaster for cladding
Clearance
the store if of
theservices
materialand water
is not proofing
available work
in stock,
indent and shift the material to the workplace)
Monpower Arragement
Reference line for bunda
Sand Screering for plaster
Sand Shifting
Cement shifting
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing
Mortar mixing
Bunda Laying
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Plaster
Scaffolding and Chali removing
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
Stone Cladding the store if the material is not available in stock,
indent and shift the material to the workplace)
Monpower Arragement
Stone cutting as per req.
V Groove and polish work
Stone Shifting
Chemical Shifting
Primer Shifting
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing
Clean both the surfaces properly.
Remove all the loose particles.
Apply primer first Coat.
Wait for 30 minutes
Apply primer second coat.
Allow
Make itthe
drying
pasteforof12 hours. Ardex Endura Ardiflex
chemical
Endura
Apply theaccordingly usingthe
paste on both water.
surfaces (column and
Stone)
Make the use of " travel tool " which make the layers
on the surface
Paste/Fix the stone on the surface
Checking of stone cladding
Hole cutting As per required
Grouting
Scaffolding and Chali removing and shifting
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
1760
Clearance of services work
Clearance
the store if of
thewaterproofing work
material is not available in stock,
indent and shift the material to the workplace) 1760
Monpower Arragement
Reference line for bunda
Sand Screering for plaster 40.7
Sand Shifting 40.7
Cement shifting 390.3
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing 1760
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing
Mortar mixing
Bunda Laying 1320
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Plaster 1760
Checking of Plaster
Area Cleaning
Surface deep cleaning
Ref level marking
Reference layout marking
Tile shifting 1760
Wet the tile
Tile spacers arrangement
Cement slurry for tile pasting
Tile laying 1760
Checking of cladding
Grouting 1760
Cleaning
Curing 7 days minimum
Light Connection for Working
For stone work 35
Ref level marking
Reference layout marking
ms frame arragement
Ms frame making for counter
ms frame primer work 35
ms frame fixing 35
checking of level
Cement board fixing 35
Stone cutting as per req. 35
V Groove and polish work 35
Stone Shifting 35
Stone laying 35
Hole cutting As per required
Light Connection for Working
Clearance
the store if of
theservices
materialwork
is not available in stock,
indent and shift the material to the workplace)
Monpower Arragement
Reference line for bunda
Sand Screering for plaster
Sand Shifting
Cement shifting
Water in the workplace
Scaffolding and Chali shifting
Scaffolding binding and Chali fixing
Chipping as per req. and hacking on rcc surface
Chicken mesh and Nail Shifting and fixing
Mortar mixing
Bunda Laying
Quality verification for boonda is ok or not
Curing a day before plastering
Measuring Box shifting
Safety net binding
Plaster
Scaffolding and Chali removing
Scaffolding and Chali shifting
Cleaning
Curing 7 days minimum
Light Connection for Working
1800
Clearance of services work
Clearance of waterproofing work
Area Cleaning
Surface deep cleaning
Ref level marking
Reference
the store if layout marking
the material is not available in stock,
indent and shift the material to the workplace)
Monpower Arragement
Stone cutting with polish as per req. 1800
Sand Shifting
Cement shifting
Stone Shifting 1800
Measuring Box shifting
Water in the workplace
LVL mark for PCC
Checking of level
Sunken filling 1800
PCC 1800
Curing
LVL mark for flooring
Checking of level
Mortar mixing
Plaster for flooring 1800
Cement slurry for tile pasting
Flooring 1800
Checking of flooring
Hole cutting As per required 1800
Grouting 1800
Cleaning
Curing 7 days minimum
Light Connection for Working
Footing cabanas
Ice cafe
Solar pannels
Drawings
Foundations
Installation
Testing
Commisioning
Handing over
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm https://www.youtube.com/watch?v=Nrvg-m-LNxs
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm https://www.youtube.com/watch?v=6Mi0yD2luBY
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm https://www.youtube.com/watch?v=PhPKFXeJqeU&t=498s
Sqm
Cum
Cum
Baags
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
https://www.youtube.com/watch?v=VFuw5Q5Innk
Sqm https://www.youtube.com/watch?v=2aObmO-D880&t=8s
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
https://www.youtube.com/watch?v=t_sSfsS1gxQ&t=406s
SQM
NOS
SQM
SQM https://www.youtube.com/watch?v=0XPQemf9_Us
KG
SQM
SQM
SQM
SQM
Add video
Add video
Add video
SQFT
SQFT
https://youtu.be/mYon16oW8kA
https://youtu.be/wjSUoKiT3xI
SQM
https://www.youtube.com/watch?v=9Ccu-_IupP4&feature=youtu.be
https://www.youtube.com/watch?v=mupsAagePLg&feature=youtu.b
RMTR
SQM
SQM
SQM
SQM
https://www.youtube.com/watch?v=0N_ffzOVjbs&feature=youtu.be
https://www.youtube.com/watch?v=7N0As9RehIE&feature=youtu.be
Nos
Sqm
Cum
https://youtu.be/3j1W_rHbVIg
Sqm
Nos
Nos
150
kg
Nos.
Cum
SQM
Cum
Cum
Sqm
Sqm
SQM
kg
Nos
Kg
Nos
Litter
Litter
Sqm
Nos
R.Mtr.
https://www.youtube.com/watch?v=7k2peVMYvUg
https://youtu.be/SMQeXAiwTUw
Link 2 Link 3 Checklist
https://www.youtube.com/watch?v=Ydo3-DgP2kY&t=290s
https://www.youtube.com/watch?v=dt6xdarVWqA&t=210s
https://www.youtube.com/watch?v=NzfobHoKJbA
https://www.youtube.com/watch?v=AbJ5Y4cHzrM
https://www.youtube.com/watch?v=55lgyF-gAMs
https://www.youtube.com/watch?v=nU0_EbHoIcY
https://www.youtube.com/watch?v=jkyvesz6R10
https://www.youtube.com/watch?v=mHCPf-w-3qY
https://www.youtube.com/watch?v=OqImODy8rgA&t=323s
https://www.youtube.com/watch?v=3qRRBlvUbSY
https://www.youtube.com/watch?v=iO-Bcf5WoCI&t=52s
https://www.youtube.com/watch?v=gjt7wvA_llU
https://www.youtube.com/watch?v=GAEQutGjZ9c
https://www.youtube.com/watch?v=wePycUgMWis
https://youtu.be/6M2GRK3jyVE https://youtu.be/f98QM_2Nje8
https://youtu.be/ypsc1oWafeY https://youtu.be/yUzGjerch6A
https://youtu.be/SMa6CDLhXcY https://youtu.be/blEfVOZWBfE
https://youtu.be/SMa6CDLhXcY https://youtu.be/blEfVOZWBfE
https://www.youtube.com/watch?v=2-fk8rjPyJI&t=198s
https://youtu.be/K2gltOWcL_0
https://youtu.be/6u1cOhVn9Bo https://youtu.be/8UHU4bAxwvM
https://youtu.be/m0mnwCWFLRQ
https://youtu.be/P0l-SfmTVuU
https://youtu.be/u7pylpmWcA0 https://youtu.be/T1D2FtADNzM
https://youtu.be/wjSUoKiT3xI https://www.youtube.com/watch?v=FJdQhUBPKC4
https://www.youtube.com/watch?v=NCtaBSa8wAE&feature=youtu.be
https://www.youtube.com/watch?v=4m7JH_xKAxg&feature=youtu.be
https://www.youtube.com/watch?v=jmWpO6UlZMU&feature=youtu.be
https://www.youtube.com/watch?v=F4E2V1QkSLo&feature=youtu.be
https://www.youtube.com/watch?v=YIh6qmXRaJE&feature=youtu.be
https://www.youtube.com/watch?v=CFAzsQrJylI&feature=youtu.be
https://www.youtube.com/watch?v=1AOPkfUtW1M&feature=youtu.be
https://youtu.be/OYdcdDK2XYY
https://www.youtube.com/watch?v=DCd5yjmZKus
https://www.youtube.com/watch?v=zV2aLS3IyQk
https://youtu.be/xeU-uFbQEG0
Civil Work Shuttering Work
Methology Massion Labour Carpainter Helper
https://youtu.be/iO-Bcf5WoCI
https://youtu.be/iO-Bcf5WoCI
https://youtu.be/7NqP68HiChc
https://youtu.be/jblY39xUymg
https://youtu.be/i7xpMPGVzeo
https://youtu.be/RMXRXCgplyY
https://youtu.be/YPpkUS1bzHI
https://youtu.be/jwLuTKxrhVU
https://youtu.be/y4sAVDHzg_4
https://youtu.be/8rwk3paHOO0
https://youtu.be/_FZNuew_YXg
https://youtu.be/GJ-CiTIMexo
https://youtu.be/mHCPf-w-3qY
https://youtu.be/608blx5KJE4
https://youtu.be/MfHN-tOhD1k
https://youtu.be/GJ-CiTIMexo
https://youtu.be/m-UVBkk6eKk
https://youtu.be/m-UVBkk6eKk
https://youtu.be/ZDjpEwUqli0
https://youtu.be/n8kBtGZpQ0U
https://youtu.be/n8kBtGZpQ0U Deepak Er.Sikander
https://youtu.be/hjj29-5iDMA
https://youtu.be/11u_1cdS37s
https://youtu.be/voVC4aNfduo
https://youtu.be/GJ-CiTIMexo
https://youtu.be/7NqP68HiChc
https://youtu.be/jblY39xUymg
https://youtu.be/eyfPAWV-sC4
https://youtu.be/TWWn92qYFHA
https://youtu.be/y4sAVDHzg_4
https://youtu.be/7NqP68HiChc
https://youtu.be/8rwk3paHOO0
https://youtu.be/GJ-CiTIMexo
https://youtu.be/m-UVBkk6eKk
https://youtu.be/m-UVBkk6eKk
https://youtu.be/ZDjpEwUqli0
https://youtu.be/n8kBtGZpQ0U
https://youtu.be/n8kBtGZpQ0U
https://youtu.be/Qe8YH1Pg4Mw
https://youtu.be/Qe8YH1Pg4Mw
https://youtu.be/11u_1cdS37s
https://youtu.be/SKL0bx3pxNA
https://youtu.be/iO-Bcf5WoCI
https://youtu.be/eyfPAWV-sC4
https://youtu.be/TWWn92qYFHA
https://youtu.be/m-UVBkk6eKk
https://youtu.be/m-UVBkk6eKk
https://youtu.be/y4sAVDHzg_4
https://youtu.be/SKL0bx3pxNA
https://youtu.be/11u_1cdS37s
https://youtu.be/SKL0bx3pxNA
https://youtu.be/GJ-CiTIMexo
https://youtu.be/iO-Bcf5WoCI
https://youtu.be/m-UVBkk6eKk
https://youtu.be/wjSUoKiT3xI
https://youtu.be/GJ-CiTIMexo
https://youtu.be/y4sAVDHzg_4
https://youtu.be/PhPKFXeJqeU
https://youtu.be/PhPKFXeJqeU
https://youtu.be/xc-AnLcX4l0
https://youtu.be/hjj29-5iDMA
https://youtu.be/GJ-CiTIMexo
https://youtu.be/aPGsxNdc5Sg
https://youtu.be/cAQ2RhM_g2E
https://youtu.be/Xm66bYIpsLI
https://youtu.be/6g7cnU4R3Bg
https://youtu.be/rhAaa3I-yVw
https://youtu.be/etZOPOVGEyc
https://youtu.be/I2T9Cti8tNY
https://youtu.be/43QixQDJtI8
https://youtu.be/-DybD2ZeB7Y
https://youtu.be/vlthMuqDbr8
https://youtu.be/GJ-CiTIMexo
https://youtu.be/GJ-CiTIMexo
https://youtu.be/jblY39xUymg
https://youtu.be/eyfPAWV-sC4
https://youtu.be/TWWn92qYFHA
https://youtu.be/y4sAVDHzg_4
https://youtu.be/GJ-CiTIMexo
https://youtu.be/8rwk3paHOO0
https://youtu.be/GJ-CiTIMexo
https://youtu.be/m-UVBkk6eKk
https://youtu.be/m-UVBkk6eKk
https://youtu.be/n8kBtGZpQ0U
https://youtu.be/n8kBtGZpQ0U
https://youtu.be/Qe8YH1Pg4Mw
https://youtu.be/Qe8YH1Pg4Mw
https://youtu.be/11u_1cdS37s
https://youtu.be/hjj29-5iDMA
https://youtu.be/GJ-CiTIMexo
https://youtu.be/jblY39xUymg
https://youtu.be/eyfPAWV-sC4
https://youtu.be/TWWn92qYFHA
https://youtu.be/y4sAVDHzg_4
https://youtu.be/GJ-CiTIMexo
https://youtu.be/8rwk3paHOO0
https://youtu.be/dc4lm4qGjy0
https://youtu.be/11u_1cdS37s
https://youtu.be/SKL0bx3pxNA
https://youtu.be/GJ-CiTIMexo
https://youtu.be/vKnBzfOXBoo
https://youtu.be/BmAYaF0fiqE
https://youtu.be/m-UVBkk6eKk
https://youtu.be/m-UVBkk6eKk
https://youtu.be/iO-Bcf5WoCI
https://youtu.be/jblY39xUymg
https://youtu.be/eyfPAWV-sC4
https://youtu.be/TWWn92qYFHA
https://youtu.be/y4sAVDHzg_4
https://youtu.be/qLNwo6LBJAA
https://youtu.be/8rwk3paHOO0
https://youtu.be/GJ-CiTIMexo
https://youtu.be/wjSUoKiT3xI
https://youtu.be/GJ-CiTIMexo
https://youtu.be/y4sAVDHzg_4
https://youtu.be/49fV7QCnoug
https://youtu.be/iO-Bcf5WoCI
https://youtu.be/hjj29-5iDMA
https://youtu.be/GJ-CiTIMexo
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/LDM7Rlv-3Os
https://youtu.be/m-UVBkk6eKk
https://youtu.be/wjSUoKiT3xI
https://youtu.be/GJ-CiTIMexo
https://youtu.be/y4sAVDHzg_4
https://youtu.be/iO-Bcf5WoCI
https://youtu.be/hjj29-5iDMA
https://youtu.be/GJ-CiTIMexo
https://youtu.be/eyfPAWV-sC4
https://youtu.be/FbUJIdkiS9s
https://youtu.be/FbUJIdkiS9s
https://youtu.be/KI1fTuUhOzQ
https://youtu.be/zuRk80VOgYw
https://youtu.be/eyfPAWV-sC4
https://youtu.be/voVC4aNfduo
https://youtu.be/FbUJIdkiS9s
https://youtu.be/KI1fTuUhOzQ
https://youtu.be/zuRk80VOgYw
https://youtu.be/n8kBtGZpQ0U
https://youtu.be/BmAYaF0fiqE
https://youtu.be/fzKqFiOpSIA
https://youtu.be/OQUYRNQ6Usg
https://youtu.be/UFxghKXr9Ao
https://youtu.be/unn4QRQufJ0
https://youtu.be/unn4QRQufJ1
https://youtu.be/unn4QRQufJ2
https://youtu.be/tFmgOK5IdC4
https://youtu.be/hjzDT0M41uo
https://youtu.be/hjzDT0M41uo
https://youtu.be/hjzDT0M41uo
https://youtu.be/hjzDT0M41uo
https://youtu.be/f98QM_2Nje8
https://youtu.be/6M2GRK3jyVE
https://youtu.be/Xm66bYIpsLI
https://www.youtube.com/watch?v=neLYzmJLW6E&t=62s
https://youtu.be/6g7cnU4R3Bg
https://youtu.be/etZOPOVGEyc
https://youtu.be/iUTL50BfZPU
https://youtu.be/iUTL50BfZPU
https://youtu.be/-DybD2ZeB7Y
https://youtu.be/vlthMuqDbr8
https://youtu.be/voVC4aNfduo
https://youtu.be/FbUJIdkiS9s
https://youtu.be/eyfPAWV-sC4
https://youtu.be/FbUJIdkiS9s
https://youtu.be/608blx5KJE4
https://youtu.be/2zS64yfcHTs
https://youtu.be/2zS64yfcHTs
https://youtu.be/2zS64yfcHTs
https://youtu.be/2zS64yfcHTs
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/43QixQDJtI8
https://youtu.be/GJ-CiTIMexo
https://youtu.be/8rwk3paHOO0
https://youtu.be/eyfPAWV-sC4
https://youtu.be/GJ-CiTIMexo
https://youtu.be/TWWn92qYFHA
https://youtu.be/qLNwo6LBJAA
https://youtu.be/y4sAVDHzg_4
https://youtu.be/GJ-CiTIMexo
https://youtu.be/O15m9c8ZMr4
https://youtu.be/O15m9c8ZMr4
https://youtu.be/O15m9c8ZMr4
https://youtu.be/O15m9c8ZMr4
https://youtu.be/O15m9c8ZMr4
https://youtu.be/LvIbJNF1938
https://youtu.be/FbUJIdkiS9s
https://youtu.be/FbUJIdkiS9s
https://youtu.be/3UJBk3dR2WY
https://youtu.be/1i9Hsvw8Chc
https://youtu.be/1i9Hsvw8Chc
https://youtu.be/3UJBk3dR2WY
https://youtu.be/FbUJIdkiS9s
https://youtu.be/3UJBk3dR2WY
https://youtu.be/1i9Hsvw8Chc
https://youtu.be/85e3nb_SK_0
https://youtu.be/s64apnTtjPc
https://youtu.be/s64apnTtjPc
https://youtu.be/s64apnTtjPc
https://youtu.be/s64apnTtjPc
https://youtu.be/FbUJIdkiS9s
https://youtu.be/unn4QRQufJ0
https://youtu.be/D1rzdbKBuos
https://youtu.be/D1rzdbKBuos
https://youtu.be/OQUYRNQ6Usg
https://youtu.be/VOrbQ7_YCW8
https://youtu.be/xbqkBMdAwkA
https://youtu.be/xbqkBMdAwkA
https://youtu.be/xbqkBMdAwkA
https://youtu.be/3UND8EPN4zw
https://youtu.be/FOaiXsOvp9s
https://youtu.be/FOaiXsOvp9s
https://youtu.be/xDyWgw8e0L0
https://youtu.be/xDyWgw8e0L0
https://youtu.be/xlRpTuWpcgQ
https://youtu.be/xDyWgw8e0L0
https://youtu.be/FuUzvkswM78
https://youtu.be/fBYNYMT97ao
https://youtu.be/cI97XeREJfM
https://youtu.be/O15m9c8ZMr4
https://youtu.be/O15m9c8ZMr4
https://youtu.be/O15m9c8ZMr4
https://youtu.be/O15m9c8ZMr4
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/fQLMErUSQBY
https://youtu.be/GJ-CiTIMexo
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/Sr083MZC9gM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/QZJgly5zceM
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/9t3NQwBJLAc
https://youtu.be/_XgOXgL4dLk
https://youtu.be/_XgOXgL4dLk
https://youtu.be/_XgOXgL4dLk
https://youtu.be/_XgOXgL4dLk
https://youtu.be/A3bWDgF7_BI
https://youtu.be/A3bWDgF7_BI
https://youtu.be/A3bWDgF7_BI
https://youtu.be/A3bWDgF7_BI
https://youtu.be/A3bWDgF7_BI
https://youtu.be/PhUch1-gfYQ
https://youtu.be/PhUch1-gfYQ
https://youtu.be/PhUch1-gfYQ
https://youtu.be/K2gltOWcL_0
https://youtu.be/K2gltOWcL_0
https://youtu.be/K2gltOWcL_0
https://youtu.be/2-fk8rjPyJI
https://youtu.be/2-fk8rjPyJI
https://youtu.be/2-fk8rjPyJI
https://youtu.be/zuRk80VOgYw
https://youtu.be/PhUch1-gfYQ
https://youtu.be/PhUch1-gfYQ
https://youtu.be/8UHU4bAxwvM
https://youtu.be/8UHU4bAxwvM
https://youtu.be/8UHU4bAxwvM
https://youtu.be/8UHU4bAxwvM
https://youtu.be/6u1cOhVn9Bo
https://youtu.be/6u1cOhVn9Bo
https://youtu.be/6u1cOhVn9Bo
https://youtu.be/6u1cOhVn9Bo
https://youtu.be/HbZ-QEZx8gk
https://youtu.be/HbZ-QEZx8gk
https://youtu.be/HbZ-QEZx8gk
https://youtu.be/HbZ-QEZx8gk
https://youtu.be/HbZ-QEZx8gk
https://youtu.be/HbZ-QEZx8gk
https://youtu.be/fp3soXUJD_Q
https://youtu.be/fp3soXUJD_Q
https://youtu.be/fp3soXUJD_Q
https://youtu.be/fp3soXUJD_Q
https://youtu.be/P0l-SfmTVuU
https://youtu.be/P0l-SfmTVuU
https://youtu.be/P0l-SfmTVuU
https://youtu.be/m0mnwCWFLRQ
https://youtu.be/m0mnwCWFLRQ
https://youtu.be/m0mnwCWFLRQ
https://youtu.be/m0mnwCWFLRQ
https://youtu.be/fp3soXUJD_Q
https://youtu.be/GvOI0UHDi04
https://youtu.be/GvOI0UHDi04
https://youtu.be/GvOI0UHDi04
https://youtu.be/GvOI0UHDi04
https://youtu.be/GvOI0UHDi04
https://youtu.be/GvOI0UHDi04
https://youtu.be/T1D2FtADNzM
https://youtu.be/T1D2FtADNzM
https://youtu.be/T1D2FtADNzM
https://youtu.be/mYon16oW8kA
https://youtu.be/mYon16oW8kA
https://youtu.be/uRCp2qG8Hqo
https://youtu.be/uRCp2qG8Hqo
https://youtu.be/uRCp2qG8Hqo
https://youtu.be/fp3soXUJD_Q
https://youtu.be/fp3soXUJD_Q
https://youtu.be/GJ-CiTIMexo
https://youtu.be/1BsNoFztd1s
https://youtu.be/1BsNoFztd1s
https://youtu.be/1BsNoFztd1s
https://youtu.be/1BsNoFztd1s
https://youtu.be/1BsNoFztd1s
https://youtu.be/36h6BEXvSTY
https://youtu.be/wjSUoKiT3xI
https://youtu.be/wjSUoKiT3xI
https://youtu.be/wjSUoKiT3xI
https://youtu.be/wjSUoKiT3xI
https://youtu.be/wjSUoKiT3xI
https://youtu.be/wjSUoKiT3xI
https://youtu.be/wjSUoKiT3xI
https://youtu.be/wjSUoKiT3xI
https://www.youtube.com/watch?v=FJdQhUBPKC4
https://www.youtube.com/watch?v=FJdQhUBPKC4
https://www.youtube.com/watch?v=FJdQhUBPKC4
https://www.youtube.com/watch?v=FJdQhUBPKC4
https://www.youtube.com/watch?v=FJdQhUBPKC4
https://www.youtube.com/watch?v=FJdQhUBPKC4
https://www.youtube.com/watch?v=FJdQhUBPKC4
https://youtu.be/GJ-CiTIMexo
Steel work Fabrication Work Painting Work
Fitter Helper Welder Helper Painter Helper
Allow it drying
for 12 hours.
Layout marking
Miscellaneous Work
Skilled Labour Unskilled