Mechanical Comments:-
Action Code: (C) Revise and Submit:-
For electric drive Horizontal fire pumps technical specification and compliance (Section
13921):-
1. For your compliance to clause 1.5-C (product certificate):- Manufacturer test certificate for fire
pump, fire pump controller, pressure maintenance pump and pressure maintenance pump controller
to be submitted as you complied.
2. Your compliance to clause 1.6-E (electrical components) is not accepted, all pumps motors &
controllers shall be complied with this clause.
3. Your reply to item 2.8-A-4 & 5 can be accepted provided that the system pipe size equal to pump
suction and discharge seizes.
4. Your reply to item 2.8-A-6 & 7 is not accepted, test header manifold and hose valve shall be
provided as specified.
5. Your reply to item 2.8-A-9 is not accepted, ball drip valve shall be provided as specified.
6. List of spare parts to be provided.
7. The compliance for all missing clauses to be provided even if it will be contactor scope of work.
8. The contactor should confirm his compliance to all items quoted "By Contactor" in the supplier
compliance statement.
Cairo – Egypt,
Tel: + 202 2271 7351, Fax: +202 2671 5742
E-mail: dmg@dmg-eg.com, Website:www.dmg-eg.com
المجموعة للتصميم وإدارة المشروعات
h. The UL/FM certificate for the fire pump controller and automatic transfer switch shall be
submitted. The quoted model is not shown in the UL directory.
i. Each fire pump shall have dedicated controller and automatic transfer switch.
j. UL/FM certification for remote alarm panel to be submitted.
k. UL/FM certification for air release valve shall be submitted.
l. The technical selection material specification and UL/FM certification for pressure gauges
to be submitted.
m. The technical selection material specification for circulation relief valve to be submitted.
n. The technical selection material specification and UL/FM certification for Ball Drip Valve
to be submitted.
o. The technical selection material specification for Test Header Manifold to be submitted.
p. The technical selection material specification and UL/FM certification for Hose Valve to be
submitted.
q. The technical selection material specification and UL/FM certification for flow meter to be
submitted.
Important Note:-
In addition to missing compliance statements that should be quoted the supplier shall include in his
resubmission a point by point compliance to all comments mentioned her above.