CHECK & REVISE RECORD

No.: CBD-17-E05-EL-001

Package No. P01 Discipline EL Reviewed by

Design
Tower No. E05 FD Total pages.
Stage

Drawing No. Comments Reply/Revised


E18066- 1.There is no light under the mezzanine floor.
0105D-FD-
17-E05-EG-1-
GP-000-0

E18066- 1. There is no dewatering pump feeder


0105D-FD- routing system layout drawing.
17-E05-EG-1- 2. There is no installation height of the cable
GP-001-0 tray.
3. There is no main cable entrance location.
4. There is no cable tray support drawing.
5. There are no installation location of the
PP-PUMP panel and installation location
of pump control panel for make-up water
dewatering pump.

E18066- 1. Please give the cable types .


0105D-FD-
17-E05-EG-6-
GN-010-0

2. There is no motor control centers single


line diagram for dewatering pump.

Page 1 / 2 22-Apr-20
Package No. P01 Discipline EL Reviewed by

Design
Tower No. E05 FD Total pages.
Stage

Drawing No. Comments Reply/Revised


3. The smoke fan power is different between
E18066-0105D-FD-17-E05-EG-6-GN-
010-0 and E18066-0105D-FD-17-E05-
MH-1-RF-001.

4. There is no Grounding system diagram.


5. There is need to add Cell phone signal
amplifier.
6. There are no ELV system drawings for
CCTV,Access control.