You are on page 1of 1

1.

AHU selection:
For FAHU-CUC- the selected total cooling load is 116.4kw,but schedule of this AHU is
374kw, as in the following selection, no latent heat load is considered.

Reply ; Will reselect this unit and waiting the comments for the submittal.
2. For the access door, is the location of access door is the same direction with the cooling coil
connection direction.
Reply: Normally the same direction, but we can change it according to the request.
3. For the drain pipe location, as in the selection did not provide the location of the drain pipe
connection, please provide it.
Reply: Normally the location the same with the coil, but we can change it according to the
request.