You are on page 1of 3

CHECK & REVISE RECORD

No.: CBD-17-E04-EL-001

Package No. P01 Discipline EL Reviewed by

Design
Tower No. E04 FD Total pages.
Stage

Drawing No. Comments Reply/Revised


E18066- 1.There is no light fixture under the
0105D-FD- mezzanine floor.
17-E04-EG-1- 2.Please specify the cable trunk type and the
GP-000-0 size and material of the wire conduit.
3.Please specify the installation height and
methed of the WP push button.

E18066- 1. There are no dewatering pump feeder


0105D-FD- routing system layout drawing,fire fighting
17-E04-EG-1- pump feeder routing system layout
GP-001-0 drawing and circulation pump feeder
routing system layout drawing.
2. There is no main cable entrance location.
3. There is no cable tray installation height
and material.

E18066- 1. Please give the cable types.


0105D-FD-
17-E04-EG-6-
GN-010-0

2. There are no motor control centers single


line diagrams for dewatering pump, fire
fighting pump, circulation pump.
3. The smoke fan power is different between

Page 1 / 3 22-Apr-20
Package No. P01 Discipline EL Reviewed by

Design
Tower No. E04 FD Total pages.
Stage

Drawing No. Comments Reply/Revised


E18066-0105D-FD-17-E04-EG-6-GN-
010-0 and E18066-0105D-FD-17-E04-
MH-1-RF-001

4. There is no Grounding system diagram.


5. There is need to add Cell phone signal
amplifier.
6. There are no ELV system drawings for
CCTV.
7. There is no fire alarm system layout
drawing.

Page 2 / 3 22-Apr-20
Package No. P01 Discipline EL Reviewed by

Design
Tower No. E04 FD Total pages.
Stage

Drawing No. Comments Reply/Revised

Reviewer Reviewer’s Recheck


Date Date

Page 3 / 3 22-Apr-20

You might also like