PROJECT: Tower C01, C02. C03, C04, C05, C06, C07, C08, C11, C12, D01, D02, D03, D04 & D05
CENTRAL BUISNESS DISTRICT@ Egypt
CLIENT: Ministry of Housing Utilities & Urban Development
CONSULTANT: DAR Al-Handasah DT: 02/10/2019
MAIN CONTRACTOR: CHINA STATE CONSTRUCTION ENGRG. CORP. LTD. REF: EME-03107
2
Installer, and Contractor are jointly and severally liable remark manufactured standard.
and agree to repair or replace defective components of
the warranted item.
Warranty shall include:
1. Defective materials and installation. Comply
2. Failure to comply with requirements stated in technical Comply
specifications.
3. Structural failures including, but not limited to, Comply
excessive deflection.
4. Faulty operation of movable parts such as hardware. Comply
5. Deterioration of metals, metal finishes, and other Comply
materials beyond normal weathering and use.
6. Delamination of exterior or interior facing materials. Comply if
applicable
7. Making good and installation and finishing all items that Comply if product
are disturbed and that may be required due to repair or is under warranty.
replacement of defective items. Coordinate with
Employer, manufacturer, and installer of adjacent
disturbed items to ensure that their warranty is not
cancelled due to the repair work.
8. Warranty Period: Two years from date of Substantial Comply with Warranty will be 18
Completion. remark months from the date of
delivery or 12 months
from the date of
commissioning whichever
falls earlier.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Materials and equipment shall be standard products of
a manufacturer regularly engaged in the manufacturing
of such products, which are of a similar material, design
and workmanship. The standard products shall have
been in satisfactory commercial or industrial use for 5
years prior to bid opening. The 5 year use shall include
applications of equipment and materials under similar
circumstances and of similar size. The 5 years Comply
experience shall be satisfactorily completed by a
product that has been sold or is offered for sale on the
commercial market through advertisements,
manufacturer's catalogs, or brochures. Products having
less than a 5 year field service record shall not be
acceptable. Products shall be supported by a service
organization. System components shall be
environmentally suitable for the indicated locations.
2.2 GENERAL
A. Factory-packaged and -tested units rated according to Comply with EUCW-DA units are AHRI
AHRI 440, ASHRAE 33, and UL 1995. remark 440 certified.
B. Units shall include an enclosure for cabinet models and Comply
3
casing for concealed models.
C. Units shall have three speeds switch and shall be Comply
selected at medium speed.
D. Base unit shall be complete with galvanized casing, Comply with Auxiliary water coil,
water-coil assembly with auxiliary water coil, valve and remark valves, piping package &
piping package, drain pans, air filter, fan motor, and motor control will be
motor control. contractor's scope.
E. All thermal and acoustical insulation shall be sealed Comply with Offered insulation is
with a coating that is impervious to moisture. remark moisture resistant. Extra
coating by contractor.
F. Sound-power-level, decibels reference, 10 to the minus Comply with Please refer our catalogue
12 power watt, at the fan operating speed selected to remark for the sound power level
meet the specified capacity, shall not exceed the for each unit.
following values at the mid frequency of each octave
band:
OCTAVE BANDS
Frequency (hertz) 250 500 1,000 2,000 4,000
Power Level 60 55 53 50 48
G. Sound-power-level data or values for these units shall
be obtained in accordance with the test procedures
specified in ANSI/ASA S12.23. Sound-power values
apply to units provided with factory-fabricated cabinet
enclosures and standard grilles. Values obtained for the
standard cabinet models will be acceptable for
concealed models without separate tests provided Comply
there is no variation between models as to the coil
configuration, blowers, motor speeds, or relative
arrangement of parts. Each unit shall be fastened
securely to the building structure.
H. Capacity of the units shall be as indicated. Room fan- Comply with EUCW-DA units are AHRI
coil units shall be certified as complying with AHRI 440 remark 440 certified.
and shall meet the requirements of UL 1995.
2.3 CONFIGURATION
A. Vertical Units: An assembly for floor-to-floor mounting, Not Applicable All proposed units are
including cabinet, filter, chassis, coil, drain pan, fan, and horizontal units.
motor in blow-through configuration with hydronic or
direct-expansion cooling coil and electric heating coil.
B. Horizontal Units: An assembly including cabinet, filter, Comply with Unit assembly includes
chassis, coil, drain pan, fan, and motor in blow-through remark cabinet, filter, chassis, coil,
configuration with hydronic or direct-expansion cooling drain pan, fan, and motor
coil and electric heating coil. in blow-through
configuration.
C. Concealed Units: An enclosed, horizontal type assembly Comply with Unit assembly includes
including cabinet, filter, chassis, coil, drain pan, fan, and remark cabinet, filter, chassis, coil,
motor in blow-through configuration with hydronic or drain pan, fan, and motor
direct-expansion cooling coil with inlet and outlet duct in blow-through
collars. configuration with inlet
and outlet duct collars.
4
2.4 MATERIALS
A. Chassis: Galvanized steel, with flanged edges. Comply
B. Coil Section Insulation: minimum 13-mm (1/2-inch) Comply with Coil section insulation is
duct liner (coated glass fiber or foil-covered, closed-cell remark 8mm glass fiber.
foam) complying with ASTM C 1071 and attached with
adhesive complying with ASTM C 916.
1. Fire-Hazard Classification: Duct liner and adhesive shall Comply with Fire resistance is A1
have a combined maximum flame-spread index of 25 remark according to EN 13501-1
and smoke-developed index of 50 when tested standard.
according to ASTM E 84 by a qualified testing agency.
2. Airstream Surfaces: Surfaces in contact with the Noted
airstream shall comply with requirements in ASHRAE
62.1.
C. Drain Pans: Galvanized steel, with connection for drain. Comply with Extended drain pan by
Drain pan shall be insulated with polystyrene or remark Contractor scope.
polyurethane insulation. Drain pan shall extend to
underside of valves, strainers and accessories, and be
formed to slope from all directions to drain connection.
D. Cabinet: Galvanized steel, with removable panels. -
1. Vertical Unit Front Panels: Removable, galvanized steel, Not Applicable
with galvanized steel discharge grilles and channel-
formed edges and with insulation on back of panel.
2. Horizontal Unit Bottom Panels: Fastened to unit with Comply with All are removable panels
cam fasteners and hinge and attached with safety remark fastened with screws.
chain; with cast-aluminum discharge grilles.
E. Cabinet Finish: Bonderize, phosphatize, and flow-coat Comply with For ceiling concealed units,
with baked-on primer with manufacturer's standard remark outer panel shall be
paint, in color selected by Engineer, applied to factory- galvanized steel sheet, for
assembled and -tested fan-coil unit before shipping. ceiling exposed units
epoxy coating will be
provided on outer panel.
F. Enclosure shall be constructed of not lighter than 18- Comply with Please refer attachment
gauge, 1.3millimeter, galvanized steel, properly remark for casing construction and
reinforced and braced. Front panel of enclosure shall thickness details for
be removable and provided with 1/2-inch (13 proposed models FCU’s.
millimeter) thick insulation conforming to NFPA 90A, to (Attachment#01). Casing
prevent condensation. will be lined 8mm fiber
glass on coils section &
15mm PE insulation for fan
section and For EUSW D
there will be standard
10mm PE insulation.
Insulation will be
according to EN13501-1.
Discharge louvers shall be four-way adjustable and shall By Contractor
be designed to properly distribute air throughout the
conditioned space.
All ferrous-metal surfaces shall be galvanized. All Comply
exposed-to-view enclosure corners and edges shall be
5
rounded.
Discharge louvers shall be mounted in a top panel that By Contractor Noted
is removable for coil cleaning.
Access doors shall be hinged and shall be provided for Comply with Offered unit are with
all piping and control compartments. remark screw fitted access door.
Enclosure finish shall be manufacturer's standard in Comply
color selected by the Engineer.
2.5 WATER COILS
A. Cooling/Heating Coils: Copper tube, with mechanically Comply Maximum entering water
bonded aluminum fins spaced no closer than 2.5 mm temperature of 95 deg C
and with manual air vent. Coils shall be rated for a (203 deg F).
minimum working pressure of 1378 kPa (200 psig) and
a maximum entering water temperature of 104 deg C
(220 deg F).
2.6 DIRECT-EXPANSION REFRIGERANT COILS
A. Copper tube, with mechanically bonded aluminum fins
spaced no closer than 2.5 mm and brazed joints at
fittings. Comply with AHRI 210/240, and leak test to Not Applicable
minimum 450 psig (3105 kPa) for a minimum working
pressure of 2068 kPa (300 psig). Include thermal
expansion valve.
2.7 ELECTRIC-RESISTANCE HEATING ELEMENTS
A. Nickel-chromium heating wire, free from expansion Noted FCU’s are selected as per
noise and 50-Hz hum, embedded in magnesium-oxide project schedule. Please
insulating refractory and sealed in high-mass steel or refer Specified/Offered
corrosion-resistant metallic sheath with fins no closer sheet.
than 4 mm. Element ends shall be enclosed in terminal
box. Fin surface temperature shall not exceed 288 deg
C (550 deg F) at any point during normal operation.
1. Circuit Protection: One-time fuses in terminal box for
over current protection and limit controls for over
temperature protection of heaters.
2. Wiring Terminations: Match conductor materials and
sizes indicated.
2.8 FAN
A. Centrifugal, with forward-curved, double-width wheels Comply with EUSW-HR models are belt
and fan scrolls made of galvanized steel or remark driven & single speed
thermoplastic material; directly connected to or V-belt units, other all units are
driven from motor. Fan shall be suitable for these direct driven & 3 speed
speed operations. Fan-coil capacity shall be based on operation, selected at
medium speed. medium speed. Please
refer catalogue for sound
details.
The noise level shall not exceed NC30 unless otherwise By MEP Contractor
specified.
2.9 FAN MOTORS
A. Comply with requirements in Section 230513 "Common Noted
Motor Requirements for HVAC Equipment."
6
B. Motors for Direct-Drive Units: Permanent-split Comply All direct drive units are
capacitor, multispeed motor with integral thermal- with permanent split
overload protection and resilient mounts. capacitor, 3 speed motor
with internal thermal
overload protection.
Offered EUSW-HR units
are with Single speed
motors.
C. Motors for Belt-Drive Units: Totally enclosed, fan- Comply
cooled, with hinged mount, adjustable motor pulley
and permanently lubricated bearings.
D. Wiring Terminations: Match conductor materials and Noted
sizes of connecting power circuit.
Connect motor to chassis wiring with plug connection. Comply with Motor shall be connected
remark to chassis by connection
strip.
2.10 ACCESSORIES
A. Outdoor-air aluminum wall boxes with integral By MEP Contractor Noted
eliminators and insect screen, for fan-coil units with
outdoor-air intake.
B. Steel sub base, height as indicated. Not Applicable All FCUs are ceiling
suspended type.
C. Steel recessing flanges for recessing fan-coil units into Not Applicable All FCUs are ceiling
ceiling or wall. suspended type.
D. Filters: 25-mm thick, washable type, aluminum filters Comply with EUCW-DA units will have
and frames. remark 25mm aluminum filter and
balance units will have
21mm aluminum filter &
for Decorative EUCW-EA
models 8mm washable
nylon filter.
E. Dampers: Steel damper blades with polyurethane stop By MEP Contractor No damper for
across entire blade length and having factory-mounted FCU
electric operators for 25 percent open cycle.
2.11 CONTROL SYSTEMS
A. Two-Pipe, Valve Cycle: Wall-mounted electronic By MEP Contractor Noted will
thermostat, with manual three-speed fan-speed switch connect to BMS
and electronic cycling of valves, suitable to be
connected to the central building control system
specified in Section "HVAC Instrumentation and
Controls" for public areas. Residential FCUs are not
connected to BMS..
2.12 SOURCE QUALITY CONTROL
A. Test and rate units according to AHRI 440. Comply with EUCW-DA units are AHRI
B. Test unit coils according to ASHRAE 33 and AHRI 410. remark 440 certified.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine areas to receive fan-coil units for compliance Noted will
examine
7
with requirements for installation tolerances and other
conditions affecting performance.
B. Examine roughing-in for piping and electrical
connections to verify actual locations before fan-coil By MEP Contractor
unit installation.
C. Proceed with installation only after unsatisfactory
conditions have been corrected.
3.2 INSTALLATION
A. Install fan-coil units level and plumb. Noted will install
B. Install fan-coil units to comply with NFPA 90A. FCU according to
C. Suspend fan-coil units from structure with rubber-in- approved
shear vibration isolators (rubber hangers). Vibration By MEP Contractor method
statement
isolators are specified in Section "Vibration and Seismic
Controls for HVAC Piping and Instruments."
D. Install wall-mounting thermostats and switch controls
at heights to match lighting controls.
3.3 CONNECTIONS
A. Piping installation requirements are specified in other Noted will install
Sections. Drawings indicate general arrangement of FCU according to
piping, fittings, and specialties. approved
B. Unless otherwise indicated, install shutoff valve and method
union or flange at each connection. statement
C. Install piping adjacent to machine to allow service and By MEP Contractor
maintenance.
D. Ground equipment.
E. Tighten electrical connectors and terminals according
to manufacturer's published torque-tightening values.
If manufacturer's torque values are not indicated, use
those specified in UL 486A - 486B.
3.4 FIELD QUALITY CONTROL
A. Testing: Perform the following field quality-control Noted will install
testing and report results in writing: FCU according to
1. After electrical circuitry has been energized, start units approved
to confirm proper motor rotation and unit operation. method
2. Operate electric heating elements through each stage By MEP Contractor statement
to verify proper operation and electrical connections.
3. Test and adjust controls and safeties.
B. Repair or replace malfunctioning units. Retest as
specified above after repairs or replacements are
made.
3.5 CLEANING
A. After installing units, inspect unit cabinet for damage to Noted will install
finish. Remove paint splatters and other spots, dirt, and By MEP Contractor FCU according to
debris. Repair damaged finish to match original finish. approved
B. After installing units, clean fan-coil units internally method
according to manufacturer's written instructions. statement
C. Install new filters in each fan-coil unit within two weeks
after Substantial Completion.
8
3.6 DEMONSTRATION
A. Engage a factory-authorized service representative to Noted
train Employer's maintenance personnel to adjust, Noted
operate, and maintain fan-coil units. Refer to Division 1
Section "Demonstration and Training part of Closeout
Procedures."
***END OF SECTION 238219***