You are on page 1of 1

RADIOGRAPHIC EXAMINATION REPORT

PROJECT : …...................
INSPECTION REPORT N0.: ….................... page1 / 1

EXAMINATION PROCEDURE: TS‐RT‐11 APPLICABLE NORMATIVE:  ASME V


WORKING STEP: AFTER WELDING ACCEPTANCE CRITERIA:         ….............
EXAMINATION DATE:  ….................... TEST EXTENSION: 100%

ITEM INFORMATION
DESCRIPTION: BUTT WELD IDENTIFICATION:    (See Item Examined)
MATERIAL:  ….............. OTHER: N/A
SURFACE CONDITION: AS WELDED  MACHINED GROUND FORGED

TEST EQUIPMENT & TECNIQUE
SOURCE :  Gamma RAY ENERGY (Ci): 20 curi I.Q.I: ASTM 1‐A, 1‐B
FILTER:  N/A FRONT (mm): N/A BACK (mm): N/A
SCREEN: LEAD FRONT (mm): 0.13 BACK (mm): 0.13
FILM TYPE: AGFA D7 DOUBLE FILM SINGLE FILM
EXPOSURE:      SINGLE WALL DOUBLE WALL
VIEWING: SINGLE View DOUBLE View
F: FOCAL SPOT (mm): 3
GEOMETRIC UNSHARPENESS  : 0.00 d: distance source film (mm): 0
D: distance source weld (mm): 150

ITEM EXAMINED
ThK RELEVANT RESULT
Tank/LINE/ISO/DWG WELD No Welder DIA (“) SECT N° DENSITY MATERIAL 
(mm)  INDIC. (*) (**)
….
….
….
….
….
....
…..................

….
….
….
….
….
….
….
….
….
….
….
….

(*) 6: SLAG INCLUSION 12:MISALIGNMENT


1: CRACK  7: CAVITY 13: ROOT CONCAVITY (**)
2: LAK OF FUSION 8: TUNGSTEN INCLUSION 14: IRREGULAR BEAD A: ACCEPTED
3: LACK OF PENETRATION 9: POROSITY 15: EXCESS OF PENETRATION B: TO BE REPAIRED
4: ALIGNED SLUG INCLUSION 10: OUTSIDE UNDERCUT 16: IRREGULAR RESTARTING C: TO BE CUT OUT
5: WORM HOLE 11: ROOT PASS UNDERCUT

ACCEPTANCE EXAMINER TS ‐ QC


NAME
SIGNATURE
DATE