You are on page 1of 2

THERMAL STORAGE TANK

Document Title: TERMAL STORAGE Tank


TH.T.1 DATA SHEET

Document No: DS-TS-T01-2020

CC 9/4/2020 IFC A.N A.N A.H


BB 27/1/2020 IFC A.N A.N A.H
AA 15/1/2020 IFC A.N A.N A.H
REV DATE DESCRIPTION BY CHECKED APPROVED

PROJECT DOCUMENTS ARE CONTROLLED DOCUMENTS.


REVISIONS ARE DENOTED r IN RIGHT MARGIN

COMPANY:
China State Construction Engineering Corporation LTD.

CONTRACTOR:
TOTAL SOLUTIONS LTD.
RAFFINATE TANK DATASHEET

REV. A : SHEET 2 of 2
N15 CLIENT : China State Construction Engineering Corporation LTD.
PROJECT : Engineering Works For Thermal Water Tank
N13 N14
N16 LOCATION : New Capital
N12 N10
N11 ITEM TAG :
MH4 MH3 SERVICE : THERMAL WATER STORAGE TANK
QUANTITY : ONE GROSS CAP. : 11,429 m³
ROOF TYPE : FIXED NET CAPACITY : 11,008m³
DIAM. (mm) : 23,750 mm HEIGHT (mm) : 26,000 mm
DESIGN CONDITIONS OPERATING CONDITIONS
CODE : AWWA D100 FLASH PT. :
DESIGN PRESS. : ATM DESIGN VAC: NA OPRT. PRESS. : ATM
N3 HHLL: 25345 mm DESIGN TEMP. : 0/93 ºC OPER. TEMP. : 4/13 ºc
HLL: 24900mm CORR. ALL. : 3 mm FOR BOTTOM 1.5 mm FOR SHELL&ROOF VAP. PRESS. : Kg/cm2
LIQ. Sp. Gr. : 1 INFLOW Nor. : M3/Hr
N4 RADIOGRAPH : SPOT INFLOW Des. : 1700 M3/Hr
3
PWHT. : NO OUTFLOW : M /Hr
N1
TEST PRESS. : FULL OF WATER OUTFLOW Des. : 1700 M3/Hr
WIND SPEED : 160 Km/Hr
SEISMIC : AWWA D100
MATERIAL
N2
H : 26,000 mm

SHELL : S 275 JO STRUCTURAL : A36/EQUIVALENT


BOTTOM : S 275 JO NOZZLE NECK : A106
ROOF : S 275 JO FLANGES : A105
INTERNALS : GASKETS : CNAF
N9 BOLTING : class 8.8
SUPPLIED BY SELLER
N7 INSULATION : 42 kg/m3 STAIRWAY yes : WALKWAY & PLATFORM yes :
N6 GR. LUGS : HANDRAIL yes : PIPE GUIDE & SUPP. :
SURFACE PREPARATION & PAINTING :

MH1 NOZZLES
MH2 MARK QTY SIZE (mm) ELEV. (MM) RATING SERVICE
SLOPE: 100 N1 1 TBD TBD 150# COLD WATER SUPPLY
N2 1 TBD TBD 150# HOT WATER RETURN
N8 LLL: 100 mm N5 N3 1 TBD MAX. ELEV. 150# OVER FLOW
N4 1 TBD TBA 150# MAKEUP WATER
NOTE 2 N5 1 100 LOW ELEV. 150# DRAIN
ID: 23,750mm N6 4 25 TBD 150# SAMPLE POINTS
N7 1 50 TBD 150# LEVEL SWITCH LOW
N8 1 80 LOW ELEV. 150# UTILITY CONNECTION
NOTES : a . Slag shall be cleaned from all welds. Welding joints shall not be painted until after the work has been completed and accepted. The surface sshall be painted
coating N9 1 TBD TBD 150# SPARE NOZZLE SHELL
1- shall be painted N10 1 50 TOP 150# TEMPERATURE TRANSMITTER
A. Blast clean surfaces prior to application of coatings per SSPC SP-10. N11 1 100 TOP 150# LEVEL TRANSMITTER
B. Apply coatings during temperature, humidity and cleanliness conditions within coating 'manufacturer recommended limits. N12 1 100 TOP 150# LEVEL SWITCH HIGH
C. Outside (under bottom): heat resistant paint, 1 shop coat of Carbon Zinc 11. N13 1 100 TOP 150# LEVEL SWITCH HIGH HIGH
D. Outside (under insulation): 5 mil primer coat, from AWWA Dl02 system I-1-W. N14 1 100 TOP 150# MECHANICAL LEVEL INDICATOR
E. Inside: AWWA D102 system I-1-W. N15 1 600 TOP 150# VENT
2- Internal drain pit: 1200 mm Diam X 900 mm depth N16 1 TBD TOP 150# SPARE NOZZLE ROOF
3- One temperature transmitter insertion well coupling welded to shell at each 300mm of tank shell height. (approx. 47 total). First coupling starts at 300 mm from bottom of
tank
MH1 1 600 TBD API-650 MAN HOLE SHELL
MH2 1 900 TBD API-650 MAN HOLE SHELL
*LOW. ELEV. : LOWEST ELEVATION MH3 1 600 TBD API-650 MAN HOLE ROOF
*MAX. ELEV. : MAXIMUM ELEVATION MH4 1 900 TBD API-650 MAN HOLE ROOF
TBD" : TO BE DESIGNED