You are on page 1of 4

F EDM Te Final

BEARING/ANGLE Line T
Stn r Vertical Distance mp Distance
Face Left Face Right Mean o o Angle
Final Bearing
m
Differential Field Test A B H 60.234 60.234

(60.234)

C A H 26.718 26.718

C Pkt atas Garisan A-B (26.718)

C B H 33.516 33.516
Lihat atas r2 (33.516)
C A 26.718

A B 7/8/2007 60.234 Jum

Datum drp.MH Gar. 2 -1 297 59 10 2 1 90 02 40 57.046 57.046

BKL 269 57 20 (57.046)

1 297 59 10 117 59 10 117 59 20 2 3 H 56.330 56.330

2 BKL (56.330)

3 117 59 20 297 59 20

2 297 59 20 117 59 20 207 55 10 3 4 H 40.866 40.866


3 BKL (40.866)
4 207 55 10 27 55 10

2 Seperti di atas 118 00 50 3 5 H 46.007 46.007

3 (46.007)

5 118 00 50 298 00 50

4 00 00 10 270 05 40 3 5 H 46.007 46.007


3 207 55 10 (46.007)

5 270 05 50 478 00 50

118 00 50 Semak

3 27 55 10 207 55 10 118 00 50 4 6 H 46.783 46.783


4 BKL (46.783)

6 118 00 50 298 00 50

7/8/2007
MH

NEGERI PERLIS
MUKIM ARAU

3923
TANPA SKALA

3921

3920
3924

3927

3925
3926
F T Vertical EDM Final
BEARING/ANGLE Line Distance
Temp Distance
Stn Angle
Face Left Face Right Mean Final Bearing (m) (m)
r o
4 298 00 50 118 00 50 208 03 20 6 7 H 59.771 59.771

6 BKL (59.771)

7 208 03 20 28 03 20

6 28 03 20 208 03 20 297 56 50 7 9 H 88.626 88.626

7 BKL (88.626)

8 297 56 50 117 56 50

7 8 H 147.777 147.777

9 BKL atas Gar. 7 - 8 (147.777)

7 9 88.626

9 8 59.151 ki

8 9 H 59.151 59.151

Lihat ruang 3 di atas (59.151)

8 7 H 147.777 147.777

Lihat ruang 2 di atas (147.777)

8 9 59.151

9 7 Semak 88.626 ki

7 117 56 50 297 56 50 16 19 50 8 10 H 61.064 61.064

8 BKL (61.064)

10 16 19 50 196 19 50

7/8/2007

8/8/2007
Daily Check 10 Semak 8 90 02 40 61.064 61.064

269 57 20 (61.064)

8 196 19 50 16 19 50 27 57 10 9 1 H 40.918 40.918

10 BKL (40.918)

1 27 57 10 207 57 10

8/8/2007
F T Vertical EDM Final
BEARING/ANGLE Line Distance
Temp Distance
Stn Angle
Face Left Face Right Mean Final Bearing (m) (m)
r o
10 207 57 10 27 57 10 118 00 00 1 2 H 57.046 57.046

1 BKL (57.046)

2 118 00 00 298 00 00

Garisan 1 - 2 dibaca 118 00 00 Lihat ms 3 r 1


Sepatutnya dibaca 117 59 10 Lihat ms 1 r 4

Tikaian dlm 8 stn 00’ 50” Melalui stn 2, 3, 4, 6, 7, 8,10 & 1

Pembetulan Per stn C1 50”/8 = - 06”.25

kerja siap

8/8/2007

You might also like