This document contains data from measurements taken of substation loads from September 2016 to December 2016. It includes the name, location, capacity, voltage levels, date and time of measurements, recorded current readings, voltage levels, and calculated load in kVA for 9 substations in the region. The load readings show that 6 of the substations were operating at over 60% of their capacity during the measurement period.
This document contains data from measurements taken of substation loads from September 2016 to December 2016. It includes the name, location, capacity, voltage levels, date and time of measurements, recorded current readings, voltage levels, and calculated load in kVA for 9 substations in the region. The load readings show that 6 of the substations were operating at over 60% of their capacity during the measurement period.
This document contains data from measurements taken of substation loads from September 2016 to December 2016. It includes the name, location, capacity, voltage levels, date and time of measurements, recorded current readings, voltage levels, and calculated load in kVA for 9 substations in the region. The load readings show that 6 of the substations were operating at over 60% of their capacity during the measurement period.
A Numerical Study of Transient Friction and Transient Friction Modelling in Ramp-Up and Ramp-Down Flow Conditions Similar To Pump Ramp-Up and Valve Closure in Gas Transport Pipelines