You are on page 1of 3

PRASHANT SHARMA

Village Tonki, Tehsil Manawar District-Dhar(MP)


Pin code: 454446
E-mail –prashant28196@gmail.com
E-mail -prashant.sharma@sanghicement.com
Mob No - 9630164478
Professional Summary-
Responsible Mechanical Engineer with 2+ years’ experience .Seeking to use proven process and production for
increasing organizations profit. Also reduce power consumption in plant. Skilled in continuous improvement,
team leader, condition monitoring, time management.

Skills -
 Team leadership
 Executive Good written and communication skills
 Condition Analysis
 Good in MS Office
 Time management
 Problem solving skills

Professional Experience -

Asst. Engineer(Mechanical)
Dec.19- Present Sanghi Industries Limited ( Sanghi Cement) Sanghipuram, Gujrat

Condition Based Monitoring (CBM)


 Working as a Vibration Analyst of Rotating Equipments.
 Performing Vibration Analysis and Laser Alignment of Equipment’s.
 Analyzing day to day activities and initiating appropriate measures to minimize the
breakdowns.
 Responsible for UT Testing of Kiln tyre, pinion and shafts.
 Execute balancing of fans and blowers.

Mech. Engineer(Trainee )
June18-Nov.19 Ultra Tech Cement Limited- Dhar Cement Works(M.P.)

Maintenance & Inspection Department (MID)


 Responsible for Condition Monitoring activities of plant equipment’s and machineries.
 Prevent breakdown of equipment’s by condition monitoring.
 Saved time and money of organization by vibration analysis and thermography,
Ultrasonic Thickness, UT testing and Hardness Testing of belt conveyor.
 Execute various machine alignment (by laser alignment kit).

Page 1
 Conducted Laser alignment training for fitters.
 Perform UT testing of Kiln tyres and machine shafts.
 Responsible for 100% availability of Equipment’s for smooth running of plant
reliability.

Mechanical Maintenance (Kiln Section)


 Execute the replacement of DPC buckets and ensure the smooth operation of it.
 Replaced and aligned the impellers of cooler fan.
 Execute the shimming procedure in kiln tyres.
 Mechanical maintenance work. (Welding, cutting, patching etc.).
 Involved in Hot Kiln Alignment Procedure.

Process Optimization (in MIS)


 Reduce power consumption and increase the efficiency of equipment by scheduled flow
and false air measurement .
 Analyze and suggest the coal firing system modification in calciner for efficient coal
burning.
 Execute the PG (Performance of Guarantee) of Raw Mill, Coal Mill and Bucket
elevator.
 Organized all departmental files and making them easily accessible to dept. members.
 Recruited, hired, trained and supervised more than 15 peoples for department.
 Administered daily operation schedule in department.
.

1.

Maintenance Engineer
June17-May1 Shivam Engineering Construction –Nagpur (MH)

 Recruited, trained and supervised employees.


 Fixed Maintenance schedule for smooth industry operation.
 Increased safety standards.

Skill set-
 Hand on experience to use Vibration Analyser: PRUF TECHNIK VIB EXPERT VIB
5.300, EMERSION AMS 2410.
 Hand on experience to use SKF TKSA 51 LASER ALIGNMENT KIT, PRUF
TECHNIK EASY LASER ALIGNMENT KIT.
 Hand on experience on use of Ultrasonic Testing MODSONIC TFT Eiensten-II.
 Process Optimization (Fan efficiency calculation, False air in Leakage across system).
 Time management skills and the ability to prioritize tasks.
 Also can execute MECHANICAL MAINTENANCE work.

Education-

Page 2
June 2017 Bachelor of engineering from Swami Vivekanand College of Engineering, Indore (MP)in
Mechanical stream with 7.28 CGPA from Rajeev Gandhi Prodhyogiki
Vishvavidhyalaya Bhopal (M.P)
May 2013 Higher Secondary Certificate from MP State Board –Bhopal (MP) with 73%.

Hobbies
 Listing Music
 Playing games

Personal Information-

Date of Birth : Jan 28, 1996


Father’s name : Mr. Rajesh Sharma
Nationality : Indian
Languages known : English, Hindi

Declaration-
I hereby declare that the information given above is true to the best of my knowledge and belief.
Place:
Date:
PRASHANT SHARMA

Page 3

You might also like