This document is a work from home report for an engineer named Luky Dwiyantho located in Bogor. It summarizes his daily activities from March 16-20, 2020. Each day he worked from 8am to 5pm on basic design and electrical construction procedures for the RCC Balongan project. His work was acknowledged by both his direct supervisor and the general manager.
This document is a work from home report for an engineer named Luky Dwiyantho located in Bogor. It summarizes his daily activities from March 16-20, 2020. Each day he worked from 8am to 5pm on basic design and electrical construction procedures for the RCC Balongan project. His work was acknowledged by both his direct supervisor and the general manager.
This document is a work from home report for an engineer named Luky Dwiyantho located in Bogor. It summarizes his daily activities from March 16-20, 2020. Each day he worked from 8am to 5pm on basic design and electrical construction procedures for the RCC Balongan project. His work was acknowledged by both his direct supervisor and the general manager.
Nama Karyawan WFH : LUKY DWIYANTO Mengetahui Mengetahui
Division / Dept : ENGINEERING
Lokasi : BOGOR No. Hp/ WA : 081319034226 EDHISYAM RISDIANTO AFIN LAPORAN WORKING FORM HOME (WFH) : General Manager Managing Director Jam Senin Selasa Rabu Kamis Jumat 16-Mar-20 17/03/2020 18/03/2020 19/03/2020 20/03/2020
Basic Design - Electrical Construction Basic Design - Electrical Construction
08.00 - 10.00 Office Office Office Work Procedure (Project RCC Balongan) Work Procedure (Project RCC Balongan)