STEEL BRIDGE DETAILING


AND FABRICATION
Gary Wisch, P.E.

#####
1

HOW DO WE GET FROM HERE…

1
5/1/2020

TO HERE…

TO HERE.

2
5/1/2020

WHY DO WE NEED A DESIGN PLAN JUST TO ORDER STEEL?


(There will be a test!)

GRADE OF STEEL

3
5/1/2020

MATERIAL WIDTH

MATERIAL THICKNESS

4
5/1/2020

MATERIAL LENGTH

NOTCH TOUGHNESS REQUIREMENTS

10

5
5/1/2020

VERTICAL CURVE DATA

11

DEAD LOAD DEFLECTION

12

6
5/1/2020

THIS ALONG WITH BEARING ELEVATIONS CAN BE USED TO


CHECK CURVE AND DEFLECTION DATA

13

OTHER CRITICAL DETAILS INCLUDE BOLTED SPLICE INFO

14

7
5/1/2020

CONNECTION DETAILS

15

CROSS FRAME DETAIL

16

8
5/1/2020

RECOMMENDED READING

17

WHY DO WE MAKE SHOP DRAWINGS?


1.) So our staff can fabricate the girders, cross frames, and other
parts.
2.) So our contractor/erector can install the pieces at the site.

18

9
5/1/2020

PLACING PLAN SHOWS PIECE MARK LOCATION AND


ORIENTATION

19

PIECE MARK ON GIRDER DRAWINGS MATCHES LOCATION ON


PLACING PLAN

20

10
5/1/2020

BOLT LIST SHOWS QUANTITY, SIZE, & LOCATION

21

SPLICE PLATE WILL FIT IF THEY ARE ORIENTED PER THE


DRAWING

22

11
5/1/2020

RAW MATERIALS IN OUTSIDE STORAGE

23

BLAST CLEAN WEBS & FLANGES PRIOR TO FABRICATION

24

12
5/1/2020

CNC TORCH CUTTING FLANGE PLATES

25

THESE NUMBERS ALL MEAN SOMETHING…

26

13
5/1/2020

WEB TO FLANGE SUBMERGED ARC WELDING

27

28

14
5/1/2020

STIFFENER PLATES & CONNECTION PLATES ARE INSTALLED

29

WHICH IS OLDER, THE WELDING EQUIPMENT OR THE


WELDING OPERATOR?

30

15
5/1/2020

STIFFENER TO WEB WELD (SUBMERGED ARC)

31

STIFFENER TO FLANGE WELD (FCAW-FLUX CORE ARC WELDING)

32

16
5/1/2020

SHOP BOLTED SPLICE, DRILLED WHILE IN A LINE ASSEMBLY

33

SAME SPLICE, VIEW FROM TOP FLANGE

34

17
5/1/2020

ALL SPLICES IN THE LINE HAVE BEEN DRILLED. NEXT STEP IS


TO VERIFY DIMENSIONS.

35

GIRDER FOLLOWING BLAST CLEANING

36

18
5/1/2020

NON-WEATHERING GIRDERS ARE PAINTED PER CONTRACT


REQUIREMENTS

37

QC DEPARTMENT CHECKS PAINT THICKNESS

38

19
5/1/2020

GIRDERS ARE READY TO SHIP (3 COAT PAINT APPLIED SYSTEM )

39

HUNDREDS OF GIRDERS READY TO SHIP

40

20
5/1/2020

LEAVING THE FAB SHOP, HEADING TO THE JOB SITE