(1) S&T Building Structure IBS Hut BLOCK Hut (2) TRD Building Structure TRS, TSS (3) COP&FOB Leakage Cleaning of (4) Training of trees in office
PWI Leakage Building Leakage velley gutter of COPS premises and sectional structures
Sr. Remarks
Depot
Work done on Work done on Work done Work done
Potential Cumm. Potential Cumm. Potential Cumm. Potential Cumm.
date date on date on date
IOW
12 8 6 4 3 2 2 2
BZU
BZU-COP PF BBTR-
BZU-COP
No.-1 & 2 , Station
1 BYS- Relay seepage 22.05.2020 1 KRTH-SSP PF-1-18 , 19 2 02.05.2020 2
GDYA-COP building
&21 .05.20
PF No.. 1 & colony
01 to
2 MALK-Roof leakage 1 KQE-TSS
09..05.2020
3 IBH-BYS/AMF-1 22.05.2020 1 POX-SSP 23.05.2020 1
GDYA-Seepage in Data 15 to
4 28.04.2020 1 GDYA-TSS 1
logger 19.05.2020
Lc No.246-Window GDYA-
5 27.04.2020 1 14.05.2020 1
glass broken TRD-Depot.
SALI--Leakage in
7
R/Room & Duty Room.
MGRD-Door broken in
8 28.04.2020 1
IPS Room
POX-Seepage in
R/Room, Window glass
9 24/25.04.2020 1
broken in power supply
room.
KQE-Window glass
10 broken in power supply 27.04.2020 1
room.
TAKU-Heavy seepage in
11 R/Room & Data logger
Room
KRTH-Seepage in
26, 27.05.2020
R/Room, Data logger
12 work in
Room.Window glass
progress,
broken in relay room.