Table of Contents
1.0 Purpose
3.0 References
4.0 Definitions
9.0 Attachments:
1.0 Purpose
This method statement covers the Guidance of testing & commissioning of IPTV System
that includes:
• Local Area Network Switches
• Management Servers
• Firewalls and Routers
1.1 Purpose of this manual to ensure the methods used for Testing & Commissioning of IPTV System described
above are correct, acceptable and in line with the consultant quality system procedures to achieve the optimum
results.
3.0 References
Project Health & Safety Plan.
Approved Shop Drawings.
Materials Approval Request
Manufacturers Recommendations.
4.0 Definitions
PASHA: PASHA Construction
BEL: AZ-MEP
GPON: GPON/Network and PABX System
The Testing & Commissioning Manager will individually assess the manpower and tools requirements required
for Testing and Commissioning of Earthling System to meet the schedule. Typically, these will include:
Commissioning Engineer
Electrical Foreman
7.1 General
The following steps are basic for all types of IPTV System should be followed at Initial Start-
up and after the Equipment have been installed.
The IPTV System Start-up shall be as per Manufacturer
Recommendation, done by Test and Commissioning Engineer.
All necessary work permits shall be approved before commencement of the work.
Prior to commencement of the work, a tool box meeting shall be held.
Ensure all installation RFIT’s has been approved.
7.2 Pre-Commissioning
After installing of IPTV System, ensure that all devices and cables installed / Pulled as
approved shop drawings and has not been damaged.
Ensure Installation is per manufacturer’s instructions.
All field equipment is installed as per approved shop drawings and has not been
damaged.
All installation documents and RFIT has been approved and signed off.
All comments regarding to installation RFIT has been cleared.
Ensure that all IPTV devices tag labeling must be the same as the device test sheet
7.5 Commissioning
After the pre-commissioning, has been completed, the system will be ready for Testing and
Commissioning. The system will be checked for full functionality as per the project specific
sequence of operations.
Each device connected to IPTV System will be tested and commissioned after permanent power
provided and the system can be energized. All system will be sequentially tested and
commissioned.
1. All network equipment in Main server room and IDFs will be installed as per schematics and approved drawings
and be properly tagged. …..........
2. All edge switches, GPON devices and backbone switches and router central equipmets will be powered up and
be upgraded to latest software released by the manifacturer. …..........
3. All network devices will be configured as per the IP schema and VLAN approved. …..........
4. Check the rates of the internet service provider broadcasting link : Data rates for the downstream and upstream must be high
enough to support IPTV
GPON Downstream Data Rate : 2.5 Gbps
GPON Upstream Data Rate : 1.25 Gbps
…..........
5. Ensure that DSL rates are stable : Signal-to-noise ratio margin (SNRm) must be better than 6 dB and preferably more than
10 dB.
…..........
6. Test IP and MPEG video layers : The user must ensure that Internet Group Management Protocol (IGMP) requests, used to
join and leave IPTV channels, are being properly handled by the network.
…..........
7. Confirm the video quality for at least 15 minutes : Evaluate the quality of video over a certain period of time; at least 15
minutes is recommended.
…..........
…..........
8.1 Induction
Prior to commencing work all personnel shall have attended the HSE induction course conducted
by Pasha HSE department. No work shall be undertaken by personnel who have not attended the
Project HSE induction. In all aspects, work is to be carried out in a safe manner and in accordance
with Az-mep group approved Health and Safety Plan and in accordance with HSE requirements.
9.0 Attachments:
Risk Assessment
Commissioning Record Sheet