Document Control
Version: 1.2
Release Date:
Owner: WLH Operations integrity
Author: Husam Naamo
Reviewer: Christy Kuriakose
Private
Revision History
Introduction
This document provides general set up guidelines and instructions for performing the Electro-
Magnetic Imager Tool (EMIT-A) Practical Assessment as a simulation at base during the “Execute”
phase to ensure consistency in the way the assessment is performed at all locations.
All steps to be done during this assessment has to be following the Electro-Magnetic Imager Tool
(EMIT-A) SWI.
HSE Requirements
Technical Assessment
Electro-Magnetic log or logs that describe characteristic EMIT responses specific to the
location’s basin and client SOP.
Logging unit with installed logging head for logging cable operation or check area
prepare for logging cable operation.
For EMIT-A only: EMMS-A, EMXS-A, EMIS-A, PBMS and PSTC
EMIT accessories (Grease Pump, DClll grease, and Slip-over Centralizer, etc).
Electro-Magnetic Imager CPA – Execute Phase – Non Wellsite Guide
A. Section 3.1. Confirm Logging Program and Well Data with Client
The Assessor to provide previous EMIT logging program to the assesse and ensure that:
Ask about scrapper run, or gauge run.
Understand and review the logging program.
Ask about WHE requirement.
Review tool planner for the job
This section is to be performed with the tool in the horizontal position as described in section 2.10.
Discuss the importance of rigging up the tool vertically in order to damage and the need to ensure
correct tool orientation if FCO-1 is not installed on the tool.
This section is about tool specific RIH procedures and when to turn EMIT transmitter ON. Follow
the steps 1 through 7.
This section is about how to operate the tool down hole, and starting the transmitter sequences.
Perform the steps 1 through 18
In this section a previously selected log has to be discussed with the assesse and to be used to
LQC the log
Discuss about safe method of Pull Out of hole the tool safely, following all the winch operations
placard.
Discuss about rig down and sequence of the tool with regards to WHE (if any).
This section to cover the complete rig down specific to the tool
Surface Equipment 10
Downhole Equipment 20
Section 3.1. Confrim Logging Program and Well Data with Client 10
Section 3.2. Prepare Acquisition Software and Surface Equipment 5
Section 3.3. Do the Wellsite Operional Check 30
Section 3.4. Service Specific Rig Up 5
Section 3.5. Rig Floor Operational Check 10
Section 3.6. Run In Hole 5
Section 3.7. Downhole Operations 20
Section 3.8. Log Quality Control 20
Section 3.9. Pull Out Of Hole 5
Section 3.10. Rig Floor Post Job Operations 5
Section 3.11. Service Specific Rig Down 5
Section 3.12. Wellsite Product Generation 10
Section 3.13. Transportation and Storage 5