tower theatre

NOTES FOR
DESIGNERS

Issue 7
March 2010
Written by : Dorothy Wright
Updated by Laurence Tuerk & Jude Chalk & Moira McSperrin
Version 7

TOWER THEATRE SET DESIGNER’S NOTES


March 2010

INTRODUCTION 4

PRODUCTION TIMESCALE FOR SET DESIGN 4


DESIGN PRODUCTION MEETINGS & DESIGN TIMETABLE 4
THE BUDGET PRODUCTION MEETING 5
PLANNING YOUR BUILDING TIME 5
ORGANISING A BUILDING CREW 5
ORGANISING MATERIALS AND TRANSPORT 6
KEYS 6
GETTING INTO THE THEATRE 6
Getting the set finished 7
Painting the Floor 7
The Clear-Up 7
THE STRIKE 7
TOWER INVENTORY 8
WHERE TO FIND THINGS: 8
TOOLS 8
FLATS 9
ROSTRA 9
LEGS FOR ROSTRA 10
TRUCKS 10
STAIRS 10
CYC 10
GAUZES 10
ROLLER DROPS 10
BLACKS 10
SET HARDWARE 10
SET DRESSING 10
Curtains, Cushions & Bedspreads 11
Rugs 11
Other Set Dressing 11
STAGE ELECTRICS 11
MATERIALS 11
WOOD 11
PAINT 12
GLAZE & VARNISH 12
PLASTICS 13
Windows 13
Vac-form 13
GAUZES 13
CONSUMABLES 13
Nails & Screws 13
Paint Brushes & Rollers 14
Tape 14
SET HARDWARE 14
PLACING ORDERS 14

SUPPLIERS 14

HIRE PLACES 15
STRUCTURAL, LIGHTING 15

475336000.doc Page 2
Version 7

FURNITURE 16
PROPS/SET DRESSING 16
WEAPONS 16
FIRE & SAFETY REGULATIONS 16
STROBE LIGHTS AND PYROTECHNICS 17
WEAPONS REGULATIONS 17
FIREPROOFING 17
FLAMEBAR SOLUTIONS 17
FIREPROOFING POLYSTYRENE. 18
Fireproof Paint 18

These notes must be followed at all venues used by


the Tower Theatre Company.

475336000.doc Page 3
Version 7

Introduction

These notes have been put together to help both new & experienced set designers working
with the Tower Company. Please feel free to let anyone on the Technical Group know about
new suppliers, new stock, new builders, problems with these notes, etc. so that they can be
improved to help make the technical side of putting on a production a bit more efficient for the
next person.

There is a set design ring binder in the Tower Office with catalogues, price lists, colour
charts, etc, any information that we have been able to obtain. This is for reference only,
please do not remove from the office. Please feel free to add any new info to the binder
so that it is available for future set designers.

A General Production Contact list including the Technical Group names and numbers along
with various other useful phone numbers should have been included with these notes. If you
do not have a copy, check in the Technical Manual in the office for the most up-to-date
version. It should be updated by the beginning of each season and it should specify which
season it is for.

Production Timescale for Set Design

Design Production Meetings & Design Timetable


As soon as possible you should discuss the design with the director. This must be done
early to allow time for the design process (you may wish to begin even before the play is
cast), and to allow time to clarify ideas as the early rehearsals begin. If the director does not
instigate this meeting, feel free to pursue him/her yourself. Please, both of you try to be
realistic, taking into account the budget, the time to build the set and the limitations of the
venue. If the venue’s standard seating plan is to be altered, this must be cleared with
the Artistic Director and the venue well in advance of the show so those seats are not
sold.

Go on a reconnaissance to the stores at the arches to look for furniture as early as possible
to determine if you will need to hire or borrow from elsewhere. Try to arrange this at a time
when the director can go with you. If necessary, go to furniture hire places together ( see
section on Hire Places). Please hire only if absolutely necessary.

You will need to produce a design, to identify difficulties, safety issues or unusual expenses
involved with your production. The design meetings need to be held far enough in advance of
the budget production meeting that a designs/models/ideas etc. can be brought to budget
meeting. Get a proper floor plan to the director as early as possible to aid in the
blocking process.

Please talk to the lighting designer about your set as early as possible (preferably before
the design is finalised). Issues that will concern the lighting designer include windows,
practicals, masking flats, drapes, use of gauzes, other curtains that may be rigged, what
lighting bars will be used by the set (for curtains or set pieces), anything that may affect or
interfere with lighting positions. If you will have two back walls (i.e. a back wall of the set with
windows and a masking back wall behind this), try to leave a minimum three foot gap
between them (more is better). This is to allow the lighting designer enough space to get the
lights at the right angles to produce the quality or light needed. As soon as the ground plan
is finished, give the lighting designer a copy.

Talk to the stage manager early on about props/set dressing. By convention, props are
anything handled by actors. These are primarily the responsibility of stage management in
consultation with the director, though you may want to provide input on the choice of props as
they form part of the overall design impact.

475336000.doc Page 4
Version 7

Set dressing is anything on the set for decoration but not handled by actors. These are
primarily the responsibility of the set designer in conjunction with the director.

Practical Lights are chosen by the set designer and made to work by the lighting designer.

The Budget Production Meeting


A budget production meeting to consider the show’s likely expenditure requirements must be
called about 6 weeks before the get-in. The design process should be well underway by this
point so that budget estimates can be made. This meeting should include the director,
stage manager, set designer, lighting designer, sound designer, costume designer,
the safety officer and someone from company committee (normally the Artistic
Director or the Financial Director). The director or stage manager should organise this
meeting.

Your model should be ready for this meeting (and the floor plan if not done already). You will
need to provide budget estimates, fire/safety issues, etc. The safety officer must be invited to
this meeting to receive up-to-date information regarding aspects of the show with regard to
safety issues. Advance notice is required to satisfy local authority regulations relating to
theatrical licensing, even if all that is happening is the lighting of cigarettes. Early involvement
of the safety officer can avoid the possibility of having to make (possibly major) last minute
changes.

Each show has a budget which must cover the set, furniture, costumes, props, lighting etc. At
the budget production meeting your specific budget will be fixed based on your
requirements. The budget must be signed off by the committee member who attends the
production meeting. This budget should be adhered to (so get your estimates right!).

Don’t forget that it can take up to two weeks to raise a cheque because two signatures are
required, so please request cheques for hires, etc, well in advance.

Planning your building time

In the hired venues we are using at present, there is very little time to build and dress the set.
Also most venues only allow minimal construction/touch-up painting on stage, so as much
pre-building as possible is essential, and every minute of the get-in period must be carefully
planned.

You can use the Arches at Leytonstone to pre-build – it may be a good idea to ask the
Director to include a couple of pre-build sessions into rehearsal schedule – with actors’ help
appreciated. Don’t forget to arrange transport to move all pre-built items and flats etc. from
the Arches to the theatre.

Organising a Building Crew

It is your responsibility to arrange for a crew to build your set, but should work closely with the
Stage Manager on this. If you cannot supervise the building of your set yourself (i.e. not
enough building experience), you should discuss with the show’s Technical Co-Ordinator how
to find a construction manager.
The Tower has a database of technical people that can be sorted by category. Please
encourage new members and with the stage manager fill out the form on feedback of new
people so we can expand our list of reliable and competent technical crew. If you do not
have a copy of this list, a master copy should be in the Technical Manual in the office.

If you have any builders who have expressed an interest in design, please put them through
their paces and provide them with as much info/help as possible. Currently we do not have a
formal progression path in place, or any teaching/mentoring programme for set designers.
We are hoping to address this in the future, but it will always come down to the time and input

475336000.doc Page 5
Version 7

that the experienced can give to the less experienced. If you work with someone you feel is
ready to design on his or her own, please let the Technical Group know.

The Designer is in charge of the get-in. The cast and full stage management team should be
in to help with the set, unless you, the designer tell the stage manager that the cast is not
needed for the get-in. Do not let anyone over-rule you on this. If necessary, gently remind
the director that it is Tower policy that the cast must help with their get-in, and the
timing of any rehearsal during the get-in should be with the approval of both Set
Designer and Stage Manager only. If you arrange for enough additional builders, the
cast can have a rehearsal and this will keep everyone happier. Remember that even if
the cast are all present, they may not all be DIY experts, so make sure you know
people’s strengths. This is important both to use people efficiently and to be aware
of any gaps in the skill set that will need to be filled by other builders.

Operators should also be in for the get-in but will generally be helping with lights and sound
as needed.

Organising Materials and Transport

You’ll need to gather together materials from all the various locations where we store stuff
(see “Where to find things” below). If you require large pieces of furniture, set, etc. collected,
transportation needs to be arranged by the Stage Manager in advance of the get-in. Try
Absolute Solutions, 0800 0378314. or Prince removals on 07974 415 446 (£25 per hour, Ford
Transit) or Chris Driscoll (Props Mobile) 041 007 0305. Chris will drive his van and help with
the loading and unloading. He can also be hired for weekday pickups from hire places. Chris'
current rates are £35 for the first hour and £28 for each additional hour. He needs to be paid
in cash and will give you a receipt.

If you are having furniture delivered on a weekday, someone from your show must be
available at the venue to take delivery of the furniture when it arrives.

Other options are arranging to pick up items yourself (or get the director, stage manager or a
cast member to do it) or to have the hire place deliver (usually prohibitively expensive).
Elson’s and Steeldeck will deliver (at a price), but someone should be there to take
delivery.

Remember to arrange for return of ALL hired or borrowed items.

Keys

The keys to the main Bridewell store (City Lit) are in the Tower office in St Brides.
Contact Keith Syrett, 020 8518 8356 about access to the Arches

Getting Into the Theatre

1. For venues that we are using regularly, there are specific notes available relating to that
particular site. The notes below are more general, and should apply to any venue we are
using.
2. It is essential to have worked out in advance, with your stage manager, lighting designer
and director, a schedule for the get-in and tech rehearsals.
3. Often lighting designers like to come in before the set designer on the get-in so as to be
able to rig the onstage lights whilst the stage area is free. After that you should be in
charge of the stage, and the cast, crew and assorted helpers should be available.
4. Send some of the cast to collect the furniture. If feasible send the Director (if they have
been involved in choosing the furniture) so that you and the Stage Manager can be
organising other things. If the Director cannot go, send the Stage Manager. (When on

475336000.doc Page 6
Version 7

your reconnaissance it is a good idea to prominently label all pieces you wish to use and
draw up a complete list.) Try not to go yourself as you will have many other things to do.

Getting the set finished


If people will be coming in at times when you will not be there, make sure you leave detailed
notes about work they can do. The list of builders also identifies people who can come in
during the day (although note that at the Bridewell, access is only available on the first
Monday).

Painting the Floor


Remember to allow time for paint to dry if you intend to paint the floor. Last thing at night is
obviously the best time for this - but make sure you won’t be thrown out of the venue before
you’ve finished!

The Clear-Up
Following the final dress rehearsal, all unused materials, paint, wood etc. must be removed
from the venue and returned to the correct store (see “Where to find things” below). Under
no circumstances must materials be dumped in the Tower Office.

The Strike
In advance of the strike talk with the stage manager and the venue manager to find out
what they want left on stage etc.
Usually most of the strike will happen late at night after the last performance. Remember
however that you may only be able return things during the daytime, so you'll probably need
to arrange for people to be around the following morning too. Liaise with the Stage Manager
to get enough people to help.

 Take everything apart that you built unless another show has definitely asked for
it. No exceptions without approval of Technical Group
 Strip all nails & screws
 Take things back where they belong (see “Where to find things” below). This
requires planning and determination! Now that we are using hired venues, we must make
sure that anything of value to us is removed and returned to its proper home.

The cast and crew should all be present to provide the workforce. Typically the cast go
through to the bar for 30 minutes or so, then the director or SM should make sure they come
back to help. This should include the director.
The strike should be under the joint control of the set designer and stage manager.
The overall clearing up of the stage, backstage areas, & dressing rooms is the
responsibility of the stage manager. Tasks will be delegated by him/her accordingly.
The striking of the set itself should be under the control of the set designer (or
construction manager if there is one) for the purposes of safety. The lighting designer
is responsible for de-rigging the lights. The operators are responsible for leaving the
lighting/sound area as they would wish to find it.
Do not allow friends of the cast who have no experience at strikes to help. They mean well,
but can be more hazard than help.
Anything built for that show MUST be taken apart at the strike, unless it is absolutely clear
that a future show will use it. In general any furniture constructed should be taken apart.
When dismantling scenery, strip everything possible and remove all nails and screws
-reusable timber with nails etc left in is potentially dangerous, both to Tower members and
those who collect the rubbish. We do not re-use nails or screws (nails are usually bent and
screws will often have knackered heads from the way many people use electric screw

475336000.doc Page 7
Version 7

drivers). At the Bridewell, rubbish should be bagged up and left outside for collection. At
other venues, check rubbish arrangements with the venue manager.
If in doubt about any of this, ask for advice. Any of the Technical Group will be happy to
advise you on anything you are uncertain about.

Tower Inventory

Where to find things:

Arches & New Inn Broadway.


Due to changing circumstance of storage places, please ask Keith Syrett
about specific locations.
 Timber, Hardboard and MDF (cleaned of nails/screws/staples) stacked
neatly with other similarly sized pieces of timber.
 Large (12') Flats
 Architrave and moulding.
 Vacform plastic sheeting.
 Paint and Paint Trays
 Cyc Cloths
 Flats, doors, window pieces, columns etc.
 Re-usable bits of ironmongery
 Tools
 Stocks of timber
 Ladders
 Long lengths of scaffolding
 Furniture

The Bridewell Theatre


 Steel Rostra are stored at the rear of the theatre.
 There is a small store reached by a trapdoor at the rear of the stage. Down
there are stored stage braces, stage weights, scaffold clamps and some
other miscellaneous hardware

The City Lit store


 Props.
 Carpets, Blacks, Gauzes and Drapes

Bridewell store under the Dressing Room


 Stage lanterns, gels and cable
 Short lengths of scaffolding
 Rope, sash cord, chain

Tools

The Tower now has a tool box containing at least:


1 Black & Decker jigsaw (with spare blades)
1 claw hammer
1 rubber mallet
1 adjustable spanner
1 junior hacksaw
1 staple gun (with staples)
1 electric cordless drill set (with recharger & all the bits!)
2 blue C clamps
1 spirit level
1 chisel (12mm)

475336000.doc Page 8
Version 7

1 chisel (19mm)
1 chisel (25mm)
1 retractable knife
1 tape measure (5m)
2 tape measures (3m)
1 needle nose pliers
1 wire cutter
2 standard pliers
1 Surform planer
1 wrecking bar
2 Philips screw drivers (size various)
4 flathead screw drivers (size various)
1 hand saw (22”)

There may be more than this available as we seem to have inherited various tools over the
years. Please bring any tools you can and remind the cast to bring hammers and screw
drivers, especially electric ones.

Flats

8' high, are stored at Arches.

4 feet (double sided) x6


4 feet (thin) x2
3 feet x4
2 feet x6
1 foot x8
Ask Keith Syrett about other flats.

The Bridewell also has some of their own 8' flats which can be used :

{Detailed list to follow}

Please do not put Copydexed clouds or any other adhesive texturing on these flats.

Bracing flats:
Flats can be braced with French braces (standard stage braces) with weights until they are
more solidly anchored. To anchor flats, at the bottom, at each end on flats larger than 1’ put
square brackets screwed into the flat and the stage floor. At the top use 2” x 1” timber to
brace the flats to the back or side walls of the theatre, (with nails not screws so they are easy
to get out on the strike). If you are not sure how to do this, make sure to get in some builders
who can.

Rostra

We own the following rostra (other sizes must be hired, see listing for Steeldeck in the
suppliers section) :

5 4’ x 4’ rostra.

Steel frame is 6 “ high, the wooden platform is 1”. When placed on legs the height of the
rostra is 1” higher than the length of the legs.

For example: 7” legs + rostra = platform height 7‘ 1”, headroom underneath platform 6’ 6”. If
the fire line goes underneath the rostra, the minimum head clearance under the platforms
must be 6’ 6”.

2 Trapezoidal rostra: 57”

475336000.doc Page 9
Version 7

21” 48”
32”
The second is the mirror image of the first.

Legs for Rostra

We have selection of different length legs which are stored by Keith Syrett – check with him
before hiring. The maximum height we have is 53”.

Trucks

We have wheels for trucks.

Stairs

We have some staircase pieces available. Keith Syrett knows more than most about what we
have.

Cyc

We have a canvas cyclorama (about 15’ x 30’). It is slightly off-white, has ties at the top, a
pocket at the bottom for a chain or a scaff pole (a scaff pole is preferable as it allows the cyc
to be pulled more rigid). There are eyelets down the side to pull it taught. It is in the City Lit
store.

Gauzes

We have quite a number of gauzes available. Including a very large (60’ x 30’) offcut that
should be sent to MacDougall’s to be cut and prepared with ties, etc, as it is currently too
large to use (it was given to us as an end-of-roll deal or something like that). Be aware that
some one may have got there before you and this may no longer be this large. However, you
should not just cut pieces off this. If you wish to use the offcut, please discuss this with a
member of the Technical Group so we can get it properly cut so that it will be available for
future use.

Gauzes live in bags on the shelves in the City Lit upstairs store. Please check stock before
purchasing new gauze.

Roller Drops

There are a number of cloths with ½ round or round bottom poles stored on the school roof.
These can be rigged on lighting bars and the curtain can be ‘dropped’ or rolled back up with a
rope without dropping the lighting bar.

Blacks

Dinah Irvine knows (roughly) what stock we have. These are in the City Lit store. Most
venues will also have their own blacks. Please do not get paint on the blacks.

475336000.doc Page 10
Version 7

Set Hardware

Door handles, brackets, wheels, etc should be stored in boxes on the shelf at Arches.

Set Dressing

What is set dressing and what are props?

By convention, props are anything handled by actors. These are primarily the responsibility
of stage management in consultation with the director.

Set dressing is anything on the set for decoration but not handled by actors. These are
primarily the responsibility of the set designer in conjunction with the director.

Practical electrics are any lamps, fire effects, etc. that must work. These are chosen by the
set designer and made to work by the lighting designer. (see below)

Curtains, Cushions & Bedspreads

Check with Dinah about what you need before you buy or hire any of these items.

Rugs

Rugs are in the City Lit upstairs store. Please check there first to see if we have something
that will do for your set before you think about hiring.

Other Set Dressing

Check in the props store or with the Props Manager.

A note about borrowing furniture, props, dressing etc: All too often things borrowed do
not go back in the same state that they arrived in, so exercise caution, both with borrowing in
the first place and handling borrowed goods. Do not borrow anything valuable…

Stage Electrics

Practical lamps that we own are stored in props, along with those that will be just dressing.
Please work with the lighting designer regarding these.

Materials

Wood

The Tower uses the imperial scale (feet and inches) because our flats are built to that. Our
supplier, Elson’s Timber Yard (see Suppliers Section) will actually cut to the closest metric
equivalent. Be aware that this may occasionally cause problems. If you need an exact
length, specify it as a minimum length so it doesn’t come in short, i.e. minimum 12’ length, so
you don’t end up with a slightly shorter metric approximation.
19 mm ~ 3/4” 12 mm~1/2” 6 mm~1/4”.
Obviously, check whether we have material in stock before placing an order with
Elson’s for wood.
The timber we get is class 5, carcassing timber, which is cheap but lower quality. If you
have a good reason for higher quality, you will need joinery quality, but this is quite a bit more
expensive. If you are concerned about the details of the wood (i.e want non-warped wood,
etc) you can go down to Elson’s and pick out the exact pieces you want. For most sets, just

475336000.doc Page 11
Version 7

placing the order by phone is fine. [Elson’s will take an order over the phone provided you
have an order number (from the Tower Office) and a show reference (the name of the show).]

Mouldings Some complex mouldings (architrave, picture rails) come in hardwood only, and
therefore will come in 8’ lengths . Other less complex architraves, etc. may come in
softwoods and may not be limited to the 8’ lengths.

Hardboard Used for flat units, non load bearing structures, etc. Hardboard can be used to
form wide curves, such as arches over doorways without breaking.
Unless it is to be used on the floor, this must be Class I vesta-seal. Elson’s should know that
this is what you want, for a theatre, but they have been known to get it wrong so it’s best to
specify that you want Class I when ordering. Comes in the metric equivalent of 4’ x 8’ .

Plywood Typically use thin plywood for curved surfaces such as pillars, anything where a
tight curve is needed and hardboard would break. It is more expensive than hardboard, so
only use it when necessary. (Arches and any wide curves can usually be made from
hardboard.) Plywood will probably need to be fireproofed.

MDF Medium density fibreboard. Very heavy and rigid. Comes in thicknesses of ¼ “ and
greater. If is 19mm, it is Class I; thinner sizes will need to be proofed. Thick sheets are
extremely heavy and should be avoided. Use for nice pieces of furniture, as it cuts well into
shapes with good quality edges, unlike blockboard. Working with MDF generates
potentially harmful dust. It should therefore never be cut on stage, but only out-of-
doors or in a proper workshop. Always wear a face mask with a dust filter when
sawing MDF.

Blockboard Sturdy 19 mm thick (therefore Class I) , comes in 4’ x 8’ sheets. Used for


structural features and trucks. Very heavy and expensive. Only use in exceptional
circumstances.

Shuttering Board Very rough, cheap 1” thick, heavy. If available, can be used for truck
bases. It is used to fence in building sites.

Particle Board We generally don’t use particle board.

Paint
As with most things, please check our supplies before ordering. There is usually a
substantial amount of black & white paint available, and sometimes other things such
as glaze. Paints, varnishes, etc are stored in Hardy’s.

We use McPherson’s pre-mixed paints from Elsons (Fairbridge Road branch). There should
be a colour chart in the set designers book in the office (please do not remove the paint
chart!). The advantage of this stuff is ii comes pre-mixed in a large range of colours and
Elson’s will deliver it with any wood.

The paint we use is Vinyl Matt. This is PVA based, the brushes and rollers wash up with
water. (Please do so…)

Glaze & Varnish

For floors and furniture :

WATER BASED: Emulsion Glaze (also PVA based, in fact Emulsion glaze + pigment
= paint)) . This is what we use as standard glaze, but it is not
waterproof. (Elson’s & Brodie’s)
If a large amount of water is thrown about the stage, the glaze will
soften (as will any PVA based paint) Brushes wash up with water.

475336000.doc Page 12
Version 7

Acrylic Varnish: Expensive. Waterproof. . Use if the floor will get


wet often. Can add pigment, but cannot mix PVA paints with Acrylic
varnish. You can put acrylic varnish on top of dry emulsion paint.
Scuffed Acrylic Varnish floors can be retouched overnight using
Klear, available at Tesco’s, etc. (i.e if scuff marks from dancing need
to be touched up each night)

METHS BASED: Shellac/ FEV (French Enamel Varnish) Water-resistant, but stains if
wet (as does French Polish) Comes in colours, browns, black, etc.
as well as bright colours
Paint brushes must be cleaned in meths.

Plastics

Windows
If possible, try to find an option for windows that does not involve clear plastic and the Class I
stuff is very expensive. (Other options : leave it open, cover it with a layer of scenic gauze,
disguise with curtains, etc.) If you must use clear plastic these are the options:

Coralux: Class I. Comes in flat or corrugated varieties. Get from HomeBase. Good
for Stained-glass, it takes brightly coloured FEV well.

There is a similar product at B & Q and Wickes that has been used by the
Tower in the past but is not Class I. If you MUST use it, seal the trailing
edges in to the set

Perspex: is NOT Class I This has been used by the Tower in the past but it will not
pass a fire inspection. (Again, if you must use it, seal the trailing edges in)

Darvik: Class I, very expensive. Avoid if possible for financial reasons.

Vac-form

Vacuum form plastics are Class I plastic made into various shapes and textures: sheets of
bricks, lumpy walls, whole fireplaces, radiators etc. Available from Sydney Chambers or
Peter Evans (see suppliers). This stuff is not cheap, but you cannot put texture on the flats
any other way, as obviously the texturing must be easily removable. This sort of plastic is
preferable to polystyrene which is not fireproof. We have some "rough wall” vac-form and
a little bit of brick vac-form in store at Hardy’s. (Please try to avoid using polystyrene. If
you must use it see the noted regarding fireproofing.)

Gauzes

If you wish to use a gauze, please discuss this early on with the lighting designer, and if your
lighting designer has no experience in lighting gauzes, it might be a good idea to ask advice
from one who does.
Gauzes come in three types:
Scenic Gauze : Open weave, good for windows or in front of a cyc to soften
the harsh light that will reflect off the cyc.
Sharkstooth Gauze : Denser weave, used for reveals. When lit steeply from the
front, the gauze will be opaque, when lit from behind, it is
transparent.
Square Gauze : We don’t have much call for this.

Gauzes come in white, grey or black. They can be painted, stained, varnished, using thinned
paint. Check the gauzes for fireproofing as gauzes do not hold their fireproofing indefinitely.

475336000.doc Page 13
Version 7

They are classified as NDF (Non-Durably Fireproof), and may need to be periodically
reproofed. See the fireproofing section below.

Consumables

Nails & Screws


Nails and screws should be stored in boxes on the shelf in Hardy's. Buy in what you need if
we do not have stock. (Both should be ordered from Elson’s with the wood). We do not re-
use screws because the pozidriv screwdrivers in the hands of most people at the Tower
knacker the screws. Nails usually come out to bent to reuse so we don’t save those either.
(So don’t waste people’s time salvaging them or bent nails at the strike.)

Paint Brushes & Rollers


Rollers & trays can be ordered in from Elson’s with the wood and paint. (Check the stock in
Hardy’s and if necessary order 2 or 3 new ones) Brushes must be washed up after use as
should rollers that are new or nearly new. It is not hard to leave a bucket of water on the
stage for people to put brushes/rollers in when they have finished so that they are not left to
dry out. One person can be allocated to clean brushes and rollers at the end of the day.
Please do not leave them uncleaned. Rollers that are passed their useful life can be binned,
as can trays of crusted paint.

Tape
Masking tape should be bought from Elson’s (1” & 2” rolls).
Gaffer tape and LX tape can be obtained from Gradav. This is generally done by the lighting
designer.

Set Hardware

Door Handles & Plates, Brackets, Screw Eyes if needed can be obtained from DIY shops,
ironmongers, etc. Please check the current stock first. Hardware is stored at Hardy's.

Placing Orders
To place an order with a supplier that we have an account with you will need to get a
purchase order form/number from the Tower Office. The order number is in the upper right
corner of the form. Some suppliers will take a phone order with the number, others may want
the form itself. Elson’s (Wood & Paint) will take a phone order with number and show name.
Before placing an order, check the stocks we have at Hardy's etc. to see if we have sufficient
material for your needs, so that we are not spending money unnecessarily. If you need to
purchase things yourself (i.e. not on account) keep all receipts and give them promptly to the
Stage Manager who is responsible for the show budget and for ensuring that all out of pocket
expenses are refunded. If you must spend a large amount of money, check with the SM
whether it should go through her/him or whether it should go to the office direct. If necessary,
the Stage Manager is given a ‘float’ to cover costs on the show not put on account. Once
that is used, most SMs will refer you to the office rather than reimbursing you out of their own
money, or else you will need to wait until they have been reimbursed themselves. Make sure
you keep the receipts if you wished to be reimbursed.

Sometimes you will need to get a cheque from the office to pay for something up
front. Because each cheque requires two signatures, it can take a week or so to
arrange. Make sure you request the cheque in plenty of time.

Suppliers
This is an arbitrary and probably incomplete list of suppliers that we have used. You may
know of others. We have accounts with those marked with an *. There may be info in the set

475336000.doc Page 14
Version 7

designer’s binder about other potential suppliers. If you use others, please let Technical
Management know the details of the company.

*Elson’s Timber Yard WOOD, PAINT, ROLLERS,


NAILS, SCREWS, Etc
Fairbridge Road (David) 020 7263 6994
Shop (Steve or Geoff) 020 7226 6421

Brodie & Middleton Ltd 020 7836 3289 VARNISHES


68 Drury Lane
London WC2

*MacDougall’s 020 8534 2921 CLOTH, DRAPES


4 McGrath Road
London E15 4JP

Sidney Chambers VAC-FORM


415 Sipson Road
West Drayton
Middlesex UB7 0HY

Peter Evans 01582 725730 VAC-FORM


1 Frederick Street
Luton
Beds. LU2 7QW

VaxPlan 01932 562611


Shepperton Studios

Russell & Chapple 020 7836 7521 THEATRICAL FABRICS


Monmouth Street

Ploton’s 020 8348 2838 ART SUPPLIES


271a Archway Road

Tiranti’s 020 7636 8565 HOBBY SHOP


27 Warren Street
London W1P 5DG

Donmar 020 7790 1166 THEATRICAL SUPPLIES


54 Cavell Street
London E1

Beatties 020 7405 6285 HOBBY SHOP


202 High Holborn WC1

Hire Places

Structural, Lighting

*Steeldeck 020 7833 2031 ROSTRA, LEGS


Eastern Transit Building
Kings Cross Freight Depot
York Way, N1
Will make up specials (at a price!)

www.steeldeck.co.uk

475336000.doc Page 15
Version 7

*Gradav (FAX : 020 8803 5060) LIGHTING, SOUND


020 8803 7400 HIRE & SALES

475336000.doc Page 16
Version 7

Furniture

STV (Studio and Television Hire) 020 8749 3445


3 Ariel Way, Wood Lane W12 (White City)

Phoenix Hire 020 8961 6161


55 Chase Road NW10 (Park Royal)
A & M Hire 020 8233 1500
The Royals, Victoria Road, NW10 (Park Royal)
Superhire 020 8965 9909
Elizabeth Arden Building,
Victoria Road, NW10 (Park Royal)
National Theatre Hire 020 7820 1358
1 Brixton Way, SW9 (Kennington)
(if they don’t answer you can try the costume hire dept which is in the same complex)
020 7587 0404
N.B. The National Theatre requires a £200 deposit and the hire fees up front, before
they will release the furniture (their hire prices are actually very good, so we use them
despite this inconvenience). Remember to request a cheque well in advance.

Props/Set Dressing

STV
As above

Period Props & Lighting 020 8992 6901


21 Stirling Road W3 (Acton)
National Theatre Hire
As above

Weapons

National Theatre Armoury 020 7452 3333 (main number)


South Bank

Bapty’s
Kensal Green (Money required up front)

Fire & Safety Regulations

Please address any questions regarding safety issues directly to the Fire & Safety Officer, in
plenty of time for the resolution of problems or obtaining licenses for particular aspects of the
set that may need it. Please make sure you understand all the safety issues before
making decisions regarding your set construction. Some of the requirements regarding
flame-proofing and materials’ standards are covered in more practical detail in later sections
of these notes. There is also a set of Fire & Safety notes and references on Flambar, the
solutions we use to fireproof various materials, in the Technical Manual.

A Pre-Show Safety Report will need to be filled out, usually by the Stage Manager in the
budget production meeting with the director, set and lighting designer early in the rehearsal
process. If pyrotechnics, explosives, weapons, or live flame will be used on stage, the
Pyrotechnics form should it be filled out for your show. Again, this will be the Stage
Manager’s responsibility.

475336000.doc Page 17
Version 7

There are hard hats available. Please remind people organising set builds/strikes that
these are available and encourage the use of them.

Strobe Lights and Pyrotechnics


If you use strobe lights a notice must be posted in the foyer informing the audience. (A
standard notice is available for this purpose.)

If pyrotechnics are to be used, a Pyrotechnics/Explosives form must also be filled out. Again,
this will be the Stage Manager’s responsibility.

Any naked flame onstage (even lighting cigarettes) requires approval from the council, so the
safety officer must be informed early enough to obtain permission.

Weapons Regulations
The use of weaponry on stage is another safety issue. We have some guns and gravity
knives for use as props/dressing & are kept in the office safe. Some of the guns will fire
blanks. Other weaponry can be hired. If you are using weapons, the both the Tower’s safety
officer and the theatre Manager must be informed. Weapons must be locked up every night.
The use of weapons is, understandably, subject to very tight control and regulation. Any
show requiring the use of a large gun (i.e. rifle or musket) will pose a particular problem with
respect to safe storage and suitable arrangements must be agreed with the safety officer.
Another issue is that the Tower does not own any such large guns and suitable transportation
arrangements for collection and return to the hires will need to be considered in conjunction
with the safety officer.

Flick knives cannot be used under any circumstances, no matter how vital to the plot as
they are illegal. Gravity knives can be used instead, but they themselves can be dangerous if
appropriate precautions are not taken.

Fireproofing

Flamebar Solutions
Materials used in the theatre must be fire-retardant (“fireproof”) to Class I. To be considered
Class I, the materials must not continue to burn on their own if the source of flame is removed
within 10 seconds.
Flamebar solutions are used to treat wood, plastics, fabric, etc to make things that are not
inherently fire-retardant sufficiently so to pass the fire retardant test. These solutions are
somewhat caustic to sensitive skin, so certain items such as clothing and bed linen that will
be “slept” in are exempt from this treatment. We use the solutions rather than the crystalline
form because they are less irritating to the skin. Flamebar solutions are obtained by the
gallon (any less is uneconomical) from Brodie’s or Gradav. Gradav also has other types of
flameproofing agents. Make up solutions according to the directions. Stocks are kept on the
school roof. If you order in any, please label the container with an indelible marker, as the
labels fall off over time (N5, S3, etc is sufficient labelling). There are technical notes regarding
Flamebar available in the office if you need more details than are provided here. If you have
any other questions, please address them to the Fire & Safety Officer.

475336000.doc Page 18
Version 7

Does something have to be fireproofed?

 If you know it is Class I, no you don’t need to worry about it.


 Ten second test If you are not sure, hold a flame to it for 10 seconds. If it continues to
burn once you take the source flame away, it must be fire-proofed in some way.
 Hardboard that will be used on the floor only does not have to be Class I, so use the
cheaper stuff.
 Timber that is 19mm (~3/4”) or thicker does not need to be treated. All the timber we
routinely use is at least 19 mm. If you use something unusual, you may need to check it.

There are detailed notes in the office describing the Flamebar Fireproofing solutions that we
use. Please refer to them for specifics of what materials need what treatment and how that
treatment should be prepared and applied (see section on “Theatrical & Studio Use”).

The Flamebar solutions that we routinely use are listed below:

N5 used for hardboard, softwoods & plywood, acrylic fabrics.

S3 used for fabrics (costumes and bedsheets that people will lie in do not need to be treated
because of the effect these agents may have on sensitive skin). Fabrics can be dipped then
allowed to dry, or they can be sprayed (till soaked). Check the fabric with the match test first,
and if it must be treated, check it again afterwards.

PE6 used infrequently as needed for polyester, nylon, polyurethane foam.

S1WA2 used infrequently for gauze, muslin, paper, cardboard.

Fireproofing polystyrene.

1. Try not to use it


2. If you must, it must be encased in a fireproof ‘sandwich’ :

 Put on a fireproof backing (Vestaseal hardboard for example)


 Cover the front surface with a plaster bandage: mod-roc, the sort of stuff used when
making masks, etc, available from Beattie’s Hobby shop on High Holborn or Tiranti’s, a
sculpture supply place on Fitzroy Street.

Fireproof Paint

This maybe required for set pieces made of delicate woods (less than 19 mm is not Class I)
for instance trellises or anything made of less than 1” x 1” should be treated with flamebar or
painted with fireproof paint, vinyl matt Class I. This is available from Bollom’s on Theobald’s
Road, available in colours. It is considerably more expensive than ordinary paint. Check for
any that we may already have. The tins have red diamonds on them.