You are on page 1of 7

1

7
8

10

11

12
Name of candidate :

Quiz-2 on Indian Boiler Regulations & Act

A boiler of Working pressure 40 kg/cm² ,the range of the pressure gauge shall be zero to
A. 80 kg/cm². B. 70 Kg/cm². C. 60 Kg/cm² D. 100 Kg/cm²
Act, Para Regulation No.- 327 (b)

The longitudinal welds of internal furnace shall break joint in successive sections at least by
A. 150mm B. 2X Furnace diameter. C. 4X Thickness D. 100 mm

Act, Para Regulation No.546 (C)

Longitudinal seams of drum in successive rings shall not fall in line, except where the rings
0f the drum are
A. not the same material. B.less than 400 mm dia. C. In two halves of unequal thickness. D. less than 20 mm thick.
.

Act , Para Regulation 254


Boiler drum and other cylindrical component shall be hydraulically tested on completion of manufacture at the
maker’s works, if the internal diameters are greater than
A. 10X thickness B. 600 mm C. 500 mm D. 300mm

Act, Para Regulation No.- 268 (a)

The non fusible portion of a fusible plug shall be of


A. Stainless steel B. Gun metal C. Brass D. Bronze

Act, Para Regulation No.- 333

The Working pressure of the boiler/super heater tubes shall be determined by the following
Formula , WP = 2f(T-C)/(D-T-C). What is the value of C, if the boiler WP is 160 Kg/cm².
A. 0 B. 1 mm. C.0.5 mm D. 0.75
Act, Para Regulation No.- 338(a)(i)

Certificate issued for use of Economiser for a period not exceeding


A. 6 months. B. 12 months. C. 24 months. D. 15 months.
Act, 7 (5) Para 2 Regulation No.

Heating Surface of a boiler is 225.9 Square meters, Boiler rating shall be


A. 225.9 B. 226 C.230 D.300.
Act, Para Regulation No.- 384

Cast Iron valves shall not be used for


A. Temperature above 220° C B. Pressure above 12 bar gauge. C. Bore above 100mm
D. Temperature above 427° C
Act, Para Regulation No.- 282 (b)

Heat treatment of a carbon steel boiler drum after completion of welding to be done in furnace, if the stress –
relieving temperature is 615 ± 20 Degree C, what is the soaking time for drum thickness of 75 mm

A. 200 minutes. B.188 minutes. C. 150 minutes. D.140 minutes


Act, Para Regulation No.- 267 (e)

A Boiler of W.P 126 Kg/cm², which class of repairer is eligible to undertake major repairs to the boiler

A. Special Class B. Class I C. Power class D. Class II


Act, Para Regulation No.392(4) & IBR Form XVIII

For requalification test of a IBR welder, a groove welded joint of two pieces of plates over a length of 152 mm in
a position 45 degree to vertical by the welder to be tested for plate welding test. Which size plate is suitable for
the above test
A. 229mmX152mmX14mm (thk) B. 229 mmX 140 mmX 16mm (thk)
C. 229mm X152mm X 18 mm (thk) D. 229mm X 152mm X 10 mm (thk).
Regulation No. - 610 (a)
A B C D