7
8
10
11
12
Name of candidate :
A boiler of Working pressure 40 kg/cm² ,the range of the pressure gauge shall be zero to
A. 80 kg/cm². B. 70 Kg/cm². C. 60 Kg/cm² D. 100 Kg/cm²
Act, Para Regulation No.- 327 (b)
The longitudinal welds of internal furnace shall break joint in successive sections at least by
A. 150mm B. 2X Furnace diameter. C. 4X Thickness D. 100 mm
Longitudinal seams of drum in successive rings shall not fall in line, except where the rings
0f the drum are
A. not the same material. B.less than 400 mm dia. C. In two halves of unequal thickness. D. less than 20 mm thick.
.
The Working pressure of the boiler/super heater tubes shall be determined by the following
Formula , WP = 2f(T-C)/(D-T-C). What is the value of C, if the boiler WP is 160 Kg/cm².
A. 0 B. 1 mm. C.0.5 mm D. 0.75
Act, Para Regulation No.- 338(a)(i)
Heat treatment of a carbon steel boiler drum after completion of welding to be done in furnace, if the stress –
relieving temperature is 615 ± 20 Degree C, what is the soaking time for drum thickness of 75 mm
A Boiler of W.P 126 Kg/cm², which class of repairer is eligible to undertake major repairs to the boiler
For requalification test of a IBR welder, a groove welded joint of two pieces of plates over a length of 152 mm in
a position 45 degree to vertical by the welder to be tested for plate welding test. Which size plate is suitable for
the above test
A. 229mmX152mmX14mm (thk) B. 229 mmX 140 mmX 16mm (thk)
C. 229mm X152mm X 18 mm (thk) D. 229mm X 152mm X 10 mm (thk).
Regulation No. - 610 (a)
A B C D