Electrical works

DESCRIPTION OF OPERATION
The BTS is supplied power in following order:

1st Power from Solar


2nd Power from Battery Bank
3rd Power from AC Diesel Generator (When the Battery Bank reach to LLV)

The AC Diesel Generator is programmed to operate automatically when the other power sources
from solar are unavailable and the battery is at the low level that needs to be recharged. At the
same time, the DC Diesel Generator is automatically in operations to charge the battery and
supply power to the telecom load and other equipment at the site. The average running time of
the AC Diesel Generator is around 4- 6 hours. A er that, it shall be automa cally shut down.

The Hybrid system includes following equipment:

- AC Diesel Generator
- Battery Bank
- Automatic Transfer Switch – ATS
- DC Distribution Cabinet
- Rectifier
- Solar Modular
- Solar Charge controller – MPPT
- Inverter DC/AC and AC Distribution Cabinet (Option)

Management and Controlling System :


- It operates under the management of Smart controller or PMU(Option)
- Hybrid Management Controller unit and support a Remote Control Management
Battery charging process:

Battery discharging process:

Cycle work:
System Architecture
Drawings